/*******************************************************************************
* Copyright (c) 2005, 2009 IBM Corporation and others.
* All rights reserved. This program and the accompanying materials
* are made available under the terms of the Eclipse Public License v1.0
* which accompanies this distribution, and is available at
* http://www.eclipse.org/legal/epl-v10.html
*
* Contributors:
* IBM Corporation - initial implementation
*******************************************************************************/
package org.eclipse.epf.msproject;
import org.eclipse.emf.ecore.EAttribute;
import org.eclipse.emf.ecore.EClass;
import org.eclipse.emf.ecore.EDataType;
import org.eclipse.emf.ecore.EPackage;
import org.eclipse.emf.ecore.EReference;
/**
* <!-- begin-user-doc -->
* The <b>Package</b> for the model.
* It contains accessors for the meta objects to represent
* <ul>
* <li>each class,</li>
* <li>each feature of each class,</li>
* <li>each enum,</li>
* <li>and each data type</li>
* </ul>
* <!-- end-user-doc -->
* <!-- begin-model-doc -->
* The full project schema definition from the project level down,
* starting with data type definitions.
* <!-- end-model-doc -->
* @see org.eclipse.epf.msproject.MsprojectFactory
* @model kind="package"
* @generated
*/
public interface MsprojectPackage extends EPackage {
/**
* The package name.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
String eNAME = "msproject";
/**
* The package namespace URI.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
String eNS_URI = "http://epf.eclipse.org/msproject";
/**
* The package namespace name.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
String eNS_PREFIX = "msproject";
/**
* The singleton instance of the package.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
*/
MsprojectPackage eINSTANCE = org.eclipse.epf.msproject.impl.MsprojectPackageImpl.init();
/**
* The meta object id for the '{@link org.eclipse.epf.msproject.impl.AssignmentImpl <em>Assignment</em>}' class.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @see org.eclipse.epf.msproject.impl.AssignmentImpl
* @see org.eclipse.epf.msproject.impl.MsprojectPackageImpl#getAssignment()
* @generated
*/
int ASSIGNMENT = 0;
/**
* The feature id for the '<em><b>UID</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int ASSIGNMENT__UID = 0;
/**
* The feature id for the '<em><b>Task UID</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int ASSIGNMENT__TASK_UID = 1;
/**
* The feature id for the '<em><b>Resource UID</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int ASSIGNMENT__RESOURCE_UID = 2;
/**
* The feature id for the '<em><b>Percent Work Complete</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int ASSIGNMENT__PERCENT_WORK_COMPLETE = 3;
/**
* The feature id for the '<em><b>Actual Cost</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int ASSIGNMENT__ACTUAL_COST = 4;
/**
* The feature id for the '<em><b>Actual Finish</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int ASSIGNMENT__ACTUAL_FINISH = 5;
/**
* The feature id for the '<em><b>Actual Overtime Cost</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int ASSIGNMENT__ACTUAL_OVERTIME_COST = 6;
/**
* The feature id for the '<em><b>Actual Overtime Work</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int ASSIGNMENT__ACTUAL_OVERTIME_WORK = 7;
/**
* The feature id for the '<em><b>Actual Start</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int ASSIGNMENT__ACTUAL_START = 8;
/**
* The feature id for the '<em><b>Actual Work</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int ASSIGNMENT__ACTUAL_WORK = 9;
/**
* The feature id for the '<em><b>ACWP</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int ASSIGNMENT__ACWP = 10;
/**
* The feature id for the '<em><b>Confirmed</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int ASSIGNMENT__CONFIRMED = 11;
/**
* The feature id for the '<em><b>Cost</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int ASSIGNMENT__COST = 12;
/**
* The feature id for the '<em><b>Cost Rate Table</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int ASSIGNMENT__COST_RATE_TABLE = 13;
/**
* The feature id for the '<em><b>Cost Variance</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int ASSIGNMENT__COST_VARIANCE = 14;
/**
* The feature id for the '<em><b>CV</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int ASSIGNMENT__CV = 15;
/**
* The feature id for the '<em><b>Delay</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int ASSIGNMENT__DELAY = 16;
/**
* The feature id for the '<em><b>Finish</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int ASSIGNMENT__FINISH = 17;
/**
* The feature id for the '<em><b>Finish Variance</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int ASSIGNMENT__FINISH_VARIANCE = 18;
/**
* The feature id for the '<em><b>Hyperlink</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int ASSIGNMENT__HYPERLINK = 19;
/**
* The feature id for the '<em><b>Hyperlink Address</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int ASSIGNMENT__HYPERLINK_ADDRESS = 20;
/**
* The feature id for the '<em><b>Hyperlink Sub Address</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int ASSIGNMENT__HYPERLINK_SUB_ADDRESS = 21;
/**
* The feature id for the '<em><b>Work Variance</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int ASSIGNMENT__WORK_VARIANCE = 22;
/**
* The feature id for the '<em><b>Has Fixed Rate Units</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int ASSIGNMENT__HAS_FIXED_RATE_UNITS = 23;
/**
* The feature id for the '<em><b>Fixed Material</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int ASSIGNMENT__FIXED_MATERIAL = 24;
/**
* The feature id for the '<em><b>Leveling Delay</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int ASSIGNMENT__LEVELING_DELAY = 25;
/**
* The feature id for the '<em><b>Leveling Delay Format</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int ASSIGNMENT__LEVELING_DELAY_FORMAT = 26;
/**
* The feature id for the '<em><b>Linked Fields</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int ASSIGNMENT__LINKED_FIELDS = 27;
/**
* The feature id for the '<em><b>Milestone</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int ASSIGNMENT__MILESTONE = 28;
/**
* The feature id for the '<em><b>Notes</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int ASSIGNMENT__NOTES = 29;
/**
* The feature id for the '<em><b>Overallocated</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int ASSIGNMENT__OVERALLOCATED = 30;
/**
* The feature id for the '<em><b>Overtime Cost</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int ASSIGNMENT__OVERTIME_COST = 31;
/**
* The feature id for the '<em><b>Overtime Work</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int ASSIGNMENT__OVERTIME_WORK = 32;
/**
* The feature id for the '<em><b>Regular Work</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int ASSIGNMENT__REGULAR_WORK = 33;
/**
* The feature id for the '<em><b>Remaining Cost</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int ASSIGNMENT__REMAINING_COST = 34;
/**
* The feature id for the '<em><b>Remaining Overtime Cost</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int ASSIGNMENT__REMAINING_OVERTIME_COST = 35;
/**
* The feature id for the '<em><b>Remaining Overtime Work</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int ASSIGNMENT__REMAINING_OVERTIME_WORK = 36;
/**
* The feature id for the '<em><b>Remaining Work</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int ASSIGNMENT__REMAINING_WORK = 37;
/**
* The feature id for the '<em><b>Response Pending</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int ASSIGNMENT__RESPONSE_PENDING = 38;
/**
* The feature id for the '<em><b>Start</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int ASSIGNMENT__START = 39;
/**
* The feature id for the '<em><b>Stop</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int ASSIGNMENT__STOP = 40;
/**
* The feature id for the '<em><b>Resume</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int ASSIGNMENT__RESUME = 41;
/**
* The feature id for the '<em><b>Start Variance</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int ASSIGNMENT__START_VARIANCE = 42;
/**
* The feature id for the '<em><b>Units</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int ASSIGNMENT__UNITS = 43;
/**
* The feature id for the '<em><b>Update Needed</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int ASSIGNMENT__UPDATE_NEEDED = 44;
/**
* The feature id for the '<em><b>VAC</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int ASSIGNMENT__VAC = 45;
/**
* The feature id for the '<em><b>Work</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int ASSIGNMENT__WORK = 46;
/**
* The feature id for the '<em><b>Work Contour</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int ASSIGNMENT__WORK_CONTOUR = 47;
/**
* The feature id for the '<em><b>BCWS</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int ASSIGNMENT__BCWS = 48;
/**
* The feature id for the '<em><b>BCWP</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int ASSIGNMENT__BCWP = 49;
/**
* The feature id for the '<em><b>Booking Type</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int ASSIGNMENT__BOOKING_TYPE = 50;
/**
* The feature id for the '<em><b>Actual Work Protected</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int ASSIGNMENT__ACTUAL_WORK_PROTECTED = 51;
/**
* The feature id for the '<em><b>Actual Overtime Work Protected</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int ASSIGNMENT__ACTUAL_OVERTIME_WORK_PROTECTED = 52;
/**
* The feature id for the '<em><b>Creation Date</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int ASSIGNMENT__CREATION_DATE = 53;
/**
* The feature id for the '<em><b>Extended Attribute</b></em>' containment reference list.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int ASSIGNMENT__EXTENDED_ATTRIBUTE = 54;
/**
* The feature id for the '<em><b>Baseline</b></em>' containment reference list.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int ASSIGNMENT__BASELINE = 55;
/**
* The feature id for the '<em><b>Timephased Data</b></em>' containment reference list.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int ASSIGNMENT__TIMEPHASED_DATA = 56;
/**
* The number of structural features of the the '<em>Assignment</em>' class.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int ASSIGNMENT_FEATURE_COUNT = 57;
/**
* The meta object id for the '{@link org.eclipse.epf.msproject.impl.AssignmentsImpl <em>Assignments</em>}' class.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @see org.eclipse.epf.msproject.impl.AssignmentsImpl
* @see org.eclipse.epf.msproject.impl.MsprojectPackageImpl#getAssignments()
* @generated
*/
int ASSIGNMENTS = 1;
/**
* The feature id for the '<em><b>Assignment</b></em>' containment reference list.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int ASSIGNMENTS__ASSIGNMENT = 0;
/**
* The number of structural features of the the '<em>Assignments</em>' class.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int ASSIGNMENTS_FEATURE_COUNT = 1;
/**
* The meta object id for the '{@link org.eclipse.epf.msproject.impl.AvailabilityPeriodImpl <em>Availability Period</em>}' class.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @see org.eclipse.epf.msproject.impl.AvailabilityPeriodImpl
* @see org.eclipse.epf.msproject.impl.MsprojectPackageImpl#getAvailabilityPeriod()
* @generated
*/
int AVAILABILITY_PERIOD = 2;
/**
* The feature id for the '<em><b>Available From</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int AVAILABILITY_PERIOD__AVAILABLE_FROM = 0;
/**
* The feature id for the '<em><b>Available To</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int AVAILABILITY_PERIOD__AVAILABLE_TO = 1;
/**
* The feature id for the '<em><b>Available Units</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int AVAILABILITY_PERIOD__AVAILABLE_UNITS = 2;
/**
* The number of structural features of the the '<em>Availability Period</em>' class.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int AVAILABILITY_PERIOD_FEATURE_COUNT = 3;
/**
* The meta object id for the '{@link org.eclipse.epf.msproject.impl.AvailabilityPeriodsImpl <em>Availability Periods</em>}' class.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @see org.eclipse.epf.msproject.impl.AvailabilityPeriodsImpl
* @see org.eclipse.epf.msproject.impl.MsprojectPackageImpl#getAvailabilityPeriods()
* @generated
*/
int AVAILABILITY_PERIODS = 3;
/**
* The feature id for the '<em><b>Availability Period</b></em>' containment reference list.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int AVAILABILITY_PERIODS__AVAILABILITY_PERIOD = 0;
/**
* The number of structural features of the the '<em>Availability Periods</em>' class.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int AVAILABILITY_PERIODS_FEATURE_COUNT = 1;
/**
* The meta object id for the '{@link org.eclipse.epf.msproject.impl.BaselineImpl <em>Baseline</em>}' class.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @see org.eclipse.epf.msproject.impl.BaselineImpl
* @see org.eclipse.epf.msproject.impl.MsprojectPackageImpl#getBaseline()
* @generated
*/
int BASELINE = 4;
/**
* The feature id for the '<em><b>Timephased Data</b></em>' containment reference list.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int BASELINE__TIMEPHASED_DATA = 0;
/**
* The feature id for the '<em><b>Number</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int BASELINE__NUMBER = 1;
/**
* The feature id for the '<em><b>Interim</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int BASELINE__INTERIM = 2;
/**
* The feature id for the '<em><b>Start</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int BASELINE__START = 3;
/**
* The feature id for the '<em><b>Finish</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int BASELINE__FINISH = 4;
/**
* The feature id for the '<em><b>Duration</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int BASELINE__DURATION = 5;
/**
* The feature id for the '<em><b>Duration Format</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int BASELINE__DURATION_FORMAT = 6;
/**
* The feature id for the '<em><b>Estimated Duration</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int BASELINE__ESTIMATED_DURATION = 7;
/**
* The feature id for the '<em><b>Work</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int BASELINE__WORK = 8;
/**
* The feature id for the '<em><b>Cost</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int BASELINE__COST = 9;
/**
* The feature id for the '<em><b>BCWS</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int BASELINE__BCWS = 10;
/**
* The feature id for the '<em><b>BCWP</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int BASELINE__BCWP = 11;
/**
* The number of structural features of the the '<em>Baseline</em>' class.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int BASELINE_FEATURE_COUNT = 12;
/**
* The meta object id for the '{@link org.eclipse.epf.msproject.impl.Baseline2Impl <em>Baseline2</em>}' class.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @see org.eclipse.epf.msproject.impl.Baseline2Impl
* @see org.eclipse.epf.msproject.impl.MsprojectPackageImpl#getBaseline2()
* @generated
*/
int BASELINE2 = 5;
/**
* The feature id for the '<em><b>Number</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int BASELINE2__NUMBER = 0;
/**
* The feature id for the '<em><b>Work</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int BASELINE2__WORK = 1;
/**
* The feature id for the '<em><b>Cost</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int BASELINE2__COST = 2;
/**
* The feature id for the '<em><b>BCWS</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int BASELINE2__BCWS = 3;
/**
* The feature id for the '<em><b>BCWP</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int BASELINE2__BCWP = 4;
/**
* The number of structural features of the the '<em>Baseline2</em>' class.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int BASELINE2_FEATURE_COUNT = 5;
/**
* The meta object id for the '{@link org.eclipse.epf.msproject.impl.Baseline3Impl <em>Baseline3</em>}' class.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @see org.eclipse.epf.msproject.impl.Baseline3Impl
* @see org.eclipse.epf.msproject.impl.MsprojectPackageImpl#getBaseline3()
* @generated
*/
int BASELINE3 = 6;
/**
* The feature id for the '<em><b>Timephased Data</b></em>' containment reference list.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int BASELINE3__TIMEPHASED_DATA = 0;
/**
* The feature id for the '<em><b>Number</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int BASELINE3__NUMBER = 1;
/**
* The feature id for the '<em><b>Start</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int BASELINE3__START = 2;
/**
* The feature id for the '<em><b>Finish</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int BASELINE3__FINISH = 3;
/**
* The feature id for the '<em><b>Work</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int BASELINE3__WORK = 4;
/**
* The feature id for the '<em><b>Cost</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int BASELINE3__COST = 5;
/**
* The feature id for the '<em><b>BCWS</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int BASELINE3__BCWS = 6;
/**
* The feature id for the '<em><b>BCWP</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int BASELINE3__BCWP = 7;
/**
* The number of structural features of the the '<em>Baseline3</em>' class.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int BASELINE3_FEATURE_COUNT = 8;
/**
* The meta object id for the '{@link org.eclipse.epf.msproject.impl.CalendarImpl <em>Calendar</em>}' class.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @see org.eclipse.epf.msproject.impl.CalendarImpl
* @see org.eclipse.epf.msproject.impl.MsprojectPackageImpl#getCalendar()
* @generated
*/
int CALENDAR = 7;
/**
* The feature id for the '<em><b>UID</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int CALENDAR__UID = 0;
/**
* The feature id for the '<em><b>Name</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int CALENDAR__NAME = 1;
/**
* The feature id for the '<em><b>Is Base Calendar</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int CALENDAR__IS_BASE_CALENDAR = 2;
/**
* The feature id for the '<em><b>Base Calendar UID</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int CALENDAR__BASE_CALENDAR_UID = 3;
/**
* The feature id for the '<em><b>Week Days</b></em>' containment reference.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int CALENDAR__WEEK_DAYS = 4;
/**
* The number of structural features of the the '<em>Calendar</em>' class.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int CALENDAR_FEATURE_COUNT = 5;
/**
* The meta object id for the '{@link org.eclipse.epf.msproject.impl.CalendarsImpl <em>Calendars</em>}' class.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @see org.eclipse.epf.msproject.impl.CalendarsImpl
* @see org.eclipse.epf.msproject.impl.MsprojectPackageImpl#getCalendars()
* @generated
*/
int CALENDARS = 8;
/**
* The feature id for the '<em><b>Calendar</b></em>' containment reference list.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int CALENDARS__CALENDAR = 0;
/**
* The number of structural features of the the '<em>Calendars</em>' class.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int CALENDARS_FEATURE_COUNT = 1;
/**
* The meta object id for the '{@link org.eclipse.epf.msproject.impl.DocumentRootImpl <em>Document Root</em>}' class.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @see org.eclipse.epf.msproject.impl.DocumentRootImpl
* @see org.eclipse.epf.msproject.impl.MsprojectPackageImpl#getDocumentRoot()
* @generated
*/
int DOCUMENT_ROOT = 9;
/**
* The feature id for the '<em><b>Mixed</b></em>' attribute list.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int DOCUMENT_ROOT__MIXED = 0;
/**
* The feature id for the '<em><b>XMLNS Prefix Map</b></em>' map.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int DOCUMENT_ROOT__XMLNS_PREFIX_MAP = 1;
/**
* The feature id for the '<em><b>XSI Schema Location</b></em>' map.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int DOCUMENT_ROOT__XSI_SCHEMA_LOCATION = 2;
/**
* The feature id for the '<em><b>Project</b></em>' containment reference.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int DOCUMENT_ROOT__PROJECT = 3;
/**
* The number of structural features of the the '<em>Document Root</em>' class.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int DOCUMENT_ROOT_FEATURE_COUNT = 4;
/**
* The meta object id for the '{@link org.eclipse.epf.msproject.impl.ExtendedAttributeImpl <em>Extended Attribute</em>}' class.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @see org.eclipse.epf.msproject.impl.ExtendedAttributeImpl
* @see org.eclipse.epf.msproject.impl.MsprojectPackageImpl#getExtendedAttribute()
* @generated
*/
int EXTENDED_ATTRIBUTE = 10;
/**
* The feature id for the '<em><b>Field ID</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int EXTENDED_ATTRIBUTE__FIELD_ID = 0;
/**
* The feature id for the '<em><b>Field Name</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int EXTENDED_ATTRIBUTE__FIELD_NAME = 1;
/**
* The feature id for the '<em><b>Alias</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int EXTENDED_ATTRIBUTE__ALIAS = 2;
/**
* The feature id for the '<em><b>Phonetic Alias</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int EXTENDED_ATTRIBUTE__PHONETIC_ALIAS = 3;
/**
* The feature id for the '<em><b>Rollup Type</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int EXTENDED_ATTRIBUTE__ROLLUP_TYPE = 4;
/**
* The feature id for the '<em><b>Calculation Type</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int EXTENDED_ATTRIBUTE__CALCULATION_TYPE = 5;
/**
* The feature id for the '<em><b>Formula</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int EXTENDED_ATTRIBUTE__FORMULA = 6;
/**
* The feature id for the '<em><b>Restrict Values</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int EXTENDED_ATTRIBUTE__RESTRICT_VALUES = 7;
/**
* The feature id for the '<em><b>Valuelist Sort Order</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int EXTENDED_ATTRIBUTE__VALUELIST_SORT_ORDER = 8;
/**
* The feature id for the '<em><b>Append New Values</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int EXTENDED_ATTRIBUTE__APPEND_NEW_VALUES = 9;
/**
* The feature id for the '<em><b>Default</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int EXTENDED_ATTRIBUTE__DEFAULT = 10;
/**
* The feature id for the '<em><b>Value List</b></em>' containment reference.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int EXTENDED_ATTRIBUTE__VALUE_LIST = 11;
/**
* The number of structural features of the the '<em>Extended Attribute</em>' class.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int EXTENDED_ATTRIBUTE_FEATURE_COUNT = 12;
/**
* The meta object id for the '{@link org.eclipse.epf.msproject.impl.ExtendedAttribute2Impl <em>Extended Attribute2</em>}' class.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @see org.eclipse.epf.msproject.impl.ExtendedAttribute2Impl
* @see org.eclipse.epf.msproject.impl.MsprojectPackageImpl#getExtendedAttribute2()
* @generated
*/
int EXTENDED_ATTRIBUTE2 = 11;
/**
* The feature id for the '<em><b>UID</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int EXTENDED_ATTRIBUTE2__UID = 0;
/**
* The feature id for the '<em><b>Field ID</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int EXTENDED_ATTRIBUTE2__FIELD_ID = 1;
/**
* The feature id for the '<em><b>Value</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int EXTENDED_ATTRIBUTE2__VALUE = 2;
/**
* The feature id for the '<em><b>Value ID</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int EXTENDED_ATTRIBUTE2__VALUE_ID = 3;
/**
* The feature id for the '<em><b>Duration Format</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int EXTENDED_ATTRIBUTE2__DURATION_FORMAT = 4;
/**
* The number of structural features of the the '<em>Extended Attribute2</em>' class.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int EXTENDED_ATTRIBUTE2_FEATURE_COUNT = 5;
/**
* The meta object id for the '{@link org.eclipse.epf.msproject.impl.ExtendedAttribute3Impl <em>Extended Attribute3</em>}' class.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @see org.eclipse.epf.msproject.impl.ExtendedAttribute3Impl
* @see org.eclipse.epf.msproject.impl.MsprojectPackageImpl#getExtendedAttribute3()
* @generated
*/
int EXTENDED_ATTRIBUTE3 = 12;
/**
* The feature id for the '<em><b>UID</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int EXTENDED_ATTRIBUTE3__UID = 0;
/**
* The feature id for the '<em><b>Field ID</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int EXTENDED_ATTRIBUTE3__FIELD_ID = 1;
/**
* The feature id for the '<em><b>Value</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int EXTENDED_ATTRIBUTE3__VALUE = 2;
/**
* The feature id for the '<em><b>Value ID</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int EXTENDED_ATTRIBUTE3__VALUE_ID = 3;
/**
* The feature id for the '<em><b>Duration Format</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int EXTENDED_ATTRIBUTE3__DURATION_FORMAT = 4;
/**
* The number of structural features of the the '<em>Extended Attribute3</em>' class.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int EXTENDED_ATTRIBUTE3_FEATURE_COUNT = 5;
/**
* The meta object id for the '{@link org.eclipse.epf.msproject.impl.ExtendedAttribute4Impl <em>Extended Attribute4</em>}' class.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @see org.eclipse.epf.msproject.impl.ExtendedAttribute4Impl
* @see org.eclipse.epf.msproject.impl.MsprojectPackageImpl#getExtendedAttribute4()
* @generated
*/
int EXTENDED_ATTRIBUTE4 = 13;
/**
* The feature id for the '<em><b>UID</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int EXTENDED_ATTRIBUTE4__UID = 0;
/**
* The feature id for the '<em><b>Field ID</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int EXTENDED_ATTRIBUTE4__FIELD_ID = 1;
/**
* The feature id for the '<em><b>Value</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int EXTENDED_ATTRIBUTE4__VALUE = 2;
/**
* The feature id for the '<em><b>Value ID</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int EXTENDED_ATTRIBUTE4__VALUE_ID = 3;
/**
* The feature id for the '<em><b>Duration Format</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int EXTENDED_ATTRIBUTE4__DURATION_FORMAT = 4;
/**
* The number of structural features of the the '<em>Extended Attribute4</em>' class.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int EXTENDED_ATTRIBUTE4_FEATURE_COUNT = 5;
/**
* The meta object id for the '{@link org.eclipse.epf.msproject.impl.ExtendedAttributesImpl <em>Extended Attributes</em>}' class.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @see org.eclipse.epf.msproject.impl.ExtendedAttributesImpl
* @see org.eclipse.epf.msproject.impl.MsprojectPackageImpl#getExtendedAttributes()
* @generated
*/
int EXTENDED_ATTRIBUTES = 14;
/**
* The feature id for the '<em><b>Extended Attribute</b></em>' containment reference list.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int EXTENDED_ATTRIBUTES__EXTENDED_ATTRIBUTE = 0;
/**
* The number of structural features of the the '<em>Extended Attributes</em>' class.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int EXTENDED_ATTRIBUTES_FEATURE_COUNT = 1;
/**
* The meta object id for the '{@link org.eclipse.epf.msproject.impl.MaskImpl <em>Mask</em>}' class.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @see org.eclipse.epf.msproject.impl.MaskImpl
* @see org.eclipse.epf.msproject.impl.MsprojectPackageImpl#getMask()
* @generated
*/
int MASK = 15;
/**
* The feature id for the '<em><b>Level</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int MASK__LEVEL = 0;
/**
* The feature id for the '<em><b>Type</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int MASK__TYPE = 1;
/**
* The feature id for the '<em><b>Length</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int MASK__LENGTH = 2;
/**
* The feature id for the '<em><b>Separator</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int MASK__SEPARATOR = 3;
/**
* The number of structural features of the the '<em>Mask</em>' class.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int MASK_FEATURE_COUNT = 4;
/**
* The meta object id for the '{@link org.eclipse.epf.msproject.impl.MasksImpl <em>Masks</em>}' class.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @see org.eclipse.epf.msproject.impl.MasksImpl
* @see org.eclipse.epf.msproject.impl.MsprojectPackageImpl#getMasks()
* @generated
*/
int MASKS = 16;
/**
* The feature id for the '<em><b>Mask</b></em>' containment reference list.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int MASKS__MASK = 0;
/**
* The number of structural features of the the '<em>Masks</em>' class.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int MASKS_FEATURE_COUNT = 1;
/**
* The meta object id for the '{@link org.eclipse.epf.msproject.impl.OutlineCodeImpl <em>Outline Code</em>}' class.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @see org.eclipse.epf.msproject.impl.OutlineCodeImpl
* @see org.eclipse.epf.msproject.impl.MsprojectPackageImpl#getOutlineCode()
* @generated
*/
int OUTLINE_CODE = 17;
/**
* The feature id for the '<em><b>Field ID</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int OUTLINE_CODE__FIELD_ID = 0;
/**
* The feature id for the '<em><b>Field Name</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int OUTLINE_CODE__FIELD_NAME = 1;
/**
* The feature id for the '<em><b>Alias</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int OUTLINE_CODE__ALIAS = 2;
/**
* The feature id for the '<em><b>Phonetic Alias</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int OUTLINE_CODE__PHONETIC_ALIAS = 3;
/**
* The feature id for the '<em><b>Values</b></em>' containment reference.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int OUTLINE_CODE__VALUES = 4;
/**
* The feature id for the '<em><b>Enterprise</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int OUTLINE_CODE__ENTERPRISE = 5;
/**
* The feature id for the '<em><b>Enterprise Outline Code Alias</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int OUTLINE_CODE__ENTERPRISE_OUTLINE_CODE_ALIAS = 6;
/**
* The feature id for the '<em><b>Resource Substitution Enabled</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int OUTLINE_CODE__RESOURCE_SUBSTITUTION_ENABLED = 7;
/**
* The feature id for the '<em><b>Leaf Only</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int OUTLINE_CODE__LEAF_ONLY = 8;
/**
* The feature id for the '<em><b>All Levels Required</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int OUTLINE_CODE__ALL_LEVELS_REQUIRED = 9;
/**
* The feature id for the '<em><b>Only Table Values Allowed</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int OUTLINE_CODE__ONLY_TABLE_VALUES_ALLOWED = 10;
/**
* The feature id for the '<em><b>Masks</b></em>' containment reference.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int OUTLINE_CODE__MASKS = 11;
/**
* The number of structural features of the the '<em>Outline Code</em>' class.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int OUTLINE_CODE_FEATURE_COUNT = 12;
/**
* The meta object id for the '{@link org.eclipse.epf.msproject.impl.OutlineCode2Impl <em>Outline Code2</em>}' class.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @see org.eclipse.epf.msproject.impl.OutlineCode2Impl
* @see org.eclipse.epf.msproject.impl.MsprojectPackageImpl#getOutlineCode2()
* @generated
*/
int OUTLINE_CODE2 = 18;
/**
* The feature id for the '<em><b>UID</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int OUTLINE_CODE2__UID = 0;
/**
* The feature id for the '<em><b>Field ID</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int OUTLINE_CODE2__FIELD_ID = 1;
/**
* The feature id for the '<em><b>Value ID</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int OUTLINE_CODE2__VALUE_ID = 2;
/**
* The number of structural features of the the '<em>Outline Code2</em>' class.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int OUTLINE_CODE2_FEATURE_COUNT = 3;
/**
* The meta object id for the '{@link org.eclipse.epf.msproject.impl.OutlineCode3Impl <em>Outline Code3</em>}' class.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @see org.eclipse.epf.msproject.impl.OutlineCode3Impl
* @see org.eclipse.epf.msproject.impl.MsprojectPackageImpl#getOutlineCode3()
* @generated
*/
int OUTLINE_CODE3 = 19;
/**
* The feature id for the '<em><b>UID</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int OUTLINE_CODE3__UID = 0;
/**
* The feature id for the '<em><b>Field ID</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int OUTLINE_CODE3__FIELD_ID = 1;
/**
* The feature id for the '<em><b>Value ID</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int OUTLINE_CODE3__VALUE_ID = 2;
/**
* The number of structural features of the the '<em>Outline Code3</em>' class.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int OUTLINE_CODE3_FEATURE_COUNT = 3;
/**
* The meta object id for the '{@link org.eclipse.epf.msproject.impl.OutlineCodesImpl <em>Outline Codes</em>}' class.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @see org.eclipse.epf.msproject.impl.OutlineCodesImpl
* @see org.eclipse.epf.msproject.impl.MsprojectPackageImpl#getOutlineCodes()
* @generated
*/
int OUTLINE_CODES = 20;
/**
* The feature id for the '<em><b>Outline Code</b></em>' containment reference list.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int OUTLINE_CODES__OUTLINE_CODE = 0;
/**
* The number of structural features of the the '<em>Outline Codes</em>' class.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int OUTLINE_CODES_FEATURE_COUNT = 1;
/**
* The meta object id for the '{@link org.eclipse.epf.msproject.impl.PredecessorLinkImpl <em>Predecessor Link</em>}' class.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @see org.eclipse.epf.msproject.impl.PredecessorLinkImpl
* @see org.eclipse.epf.msproject.impl.MsprojectPackageImpl#getPredecessorLink()
* @generated
*/
int PREDECESSOR_LINK = 21;
/**
* The feature id for the '<em><b>Predecessor UID</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int PREDECESSOR_LINK__PREDECESSOR_UID = 0;
/**
* The feature id for the '<em><b>Type</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int PREDECESSOR_LINK__TYPE = 1;
/**
* The feature id for the '<em><b>Cross Project</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int PREDECESSOR_LINK__CROSS_PROJECT = 2;
/**
* The feature id for the '<em><b>Cross Project Name</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int PREDECESSOR_LINK__CROSS_PROJECT_NAME = 3;
/**
* The feature id for the '<em><b>Link Lag</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int PREDECESSOR_LINK__LINK_LAG = 4;
/**
* The feature id for the '<em><b>Lag Format</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int PREDECESSOR_LINK__LAG_FORMAT = 5;
/**
* The number of structural features of the the '<em>Predecessor Link</em>' class.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int PREDECESSOR_LINK_FEATURE_COUNT = 6;
/**
* The meta object id for the '{@link org.eclipse.epf.msproject.impl.ProjectImpl <em>Project</em>}' class.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @see org.eclipse.epf.msproject.impl.ProjectImpl
* @see org.eclipse.epf.msproject.impl.MsprojectPackageImpl#getProject()
* @generated
*/
int PROJECT = 22;
/**
* The feature id for the '<em><b>UID</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int PROJECT__UID = 0;
/**
* The feature id for the '<em><b>Name</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int PROJECT__NAME = 1;
/**
* The feature id for the '<em><b>Title</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int PROJECT__TITLE = 2;
/**
* The feature id for the '<em><b>Subject</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int PROJECT__SUBJECT = 3;
/**
* The feature id for the '<em><b>Category</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int PROJECT__CATEGORY = 4;
/**
* The feature id for the '<em><b>Company</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int PROJECT__COMPANY = 5;
/**
* The feature id for the '<em><b>Manager</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int PROJECT__MANAGER = 6;
/**
* The feature id for the '<em><b>Author</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int PROJECT__AUTHOR = 7;
/**
* The feature id for the '<em><b>Creation Date</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int PROJECT__CREATION_DATE = 8;
/**
* The feature id for the '<em><b>Revision</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int PROJECT__REVISION = 9;
/**
* The feature id for the '<em><b>Last Saved</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int PROJECT__LAST_SAVED = 10;
/**
* The feature id for the '<em><b>Schedule From Start</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int PROJECT__SCHEDULE_FROM_START = 11;
/**
* The feature id for the '<em><b>Start Date</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int PROJECT__START_DATE = 12;
/**
* The feature id for the '<em><b>Finish Date</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int PROJECT__FINISH_DATE = 13;
/**
* The feature id for the '<em><b>FY Start Date</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int PROJECT__FYSTART_DATE = 14;
/**
* The feature id for the '<em><b>Critical Slack Limit</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int PROJECT__CRITICAL_SLACK_LIMIT = 15;
/**
* The feature id for the '<em><b>Currency Digits</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int PROJECT__CURRENCY_DIGITS = 16;
/**
* The feature id for the '<em><b>Currency Symbol</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int PROJECT__CURRENCY_SYMBOL = 17;
/**
* The feature id for the '<em><b>Currency Symbol Position</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int PROJECT__CURRENCY_SYMBOL_POSITION = 18;
/**
* The feature id for the '<em><b>Calendar UID</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int PROJECT__CALENDAR_UID = 19;
/**
* The feature id for the '<em><b>Default Start Time</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int PROJECT__DEFAULT_START_TIME = 20;
/**
* The feature id for the '<em><b>Default Finish Time</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int PROJECT__DEFAULT_FINISH_TIME = 21;
/**
* The feature id for the '<em><b>Minutes Per Day</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int PROJECT__MINUTES_PER_DAY = 22;
/**
* The feature id for the '<em><b>Minutes Per Week</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int PROJECT__MINUTES_PER_WEEK = 23;
/**
* The feature id for the '<em><b>Days Per Month</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int PROJECT__DAYS_PER_MONTH = 24;
/**
* The feature id for the '<em><b>Default Task Type</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int PROJECT__DEFAULT_TASK_TYPE = 25;
/**
* The feature id for the '<em><b>Default Fixed Cost Accrual</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int PROJECT__DEFAULT_FIXED_COST_ACCRUAL = 26;
/**
* The feature id for the '<em><b>Default Standard Rate</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int PROJECT__DEFAULT_STANDARD_RATE = 27;
/**
* The feature id for the '<em><b>Default Overtime Rate</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int PROJECT__DEFAULT_OVERTIME_RATE = 28;
/**
* The feature id for the '<em><b>Duration Format</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int PROJECT__DURATION_FORMAT = 29;
/**
* The feature id for the '<em><b>Work Format</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int PROJECT__WORK_FORMAT = 30;
/**
* The feature id for the '<em><b>Editable Actual Costs</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int PROJECT__EDITABLE_ACTUAL_COSTS = 31;
/**
* The feature id for the '<em><b>Honor Constraints</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int PROJECT__HONOR_CONSTRAINTS = 32;
/**
* The feature id for the '<em><b>Earned Value Method</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int PROJECT__EARNED_VALUE_METHOD = 33;
/**
* The feature id for the '<em><b>Inserted Projects Like Summary</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int PROJECT__INSERTED_PROJECTS_LIKE_SUMMARY = 34;
/**
* The feature id for the '<em><b>Multiple Critical Paths</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int PROJECT__MULTIPLE_CRITICAL_PATHS = 35;
/**
* The feature id for the '<em><b>New Tasks Effort Driven</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int PROJECT__NEW_TASKS_EFFORT_DRIVEN = 36;
/**
* The feature id for the '<em><b>New Tasks Estimated</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int PROJECT__NEW_TASKS_ESTIMATED = 37;
/**
* The feature id for the '<em><b>Splits In Progress Tasks</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int PROJECT__SPLITS_IN_PROGRESS_TASKS = 38;
/**
* The feature id for the '<em><b>Spread Actual Cost</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int PROJECT__SPREAD_ACTUAL_COST = 39;
/**
* The feature id for the '<em><b>Spread Percent Complete</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int PROJECT__SPREAD_PERCENT_COMPLETE = 40;
/**
* The feature id for the '<em><b>Task Updates Resource</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int PROJECT__TASK_UPDATES_RESOURCE = 41;
/**
* The feature id for the '<em><b>Fiscal Year Start</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int PROJECT__FISCAL_YEAR_START = 42;
/**
* The feature id for the '<em><b>Week Start Day</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int PROJECT__WEEK_START_DAY = 43;
/**
* The feature id for the '<em><b>Move Completed Ends Back</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int PROJECT__MOVE_COMPLETED_ENDS_BACK = 44;
/**
* The feature id for the '<em><b>Move Remaining Starts Back</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int PROJECT__MOVE_REMAINING_STARTS_BACK = 45;
/**
* The feature id for the '<em><b>Move Remaining Starts Forward</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int PROJECT__MOVE_REMAINING_STARTS_FORWARD = 46;
/**
* The feature id for the '<em><b>Move Completed Ends Forward</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int PROJECT__MOVE_COMPLETED_ENDS_FORWARD = 47;
/**
* The feature id for the '<em><b>Baseline For Earned Value</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int PROJECT__BASELINE_FOR_EARNED_VALUE = 48;
/**
* The feature id for the '<em><b>Auto Add New Resources And Tasks</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int PROJECT__AUTO_ADD_NEW_RESOURCES_AND_TASKS = 49;
/**
* The feature id for the '<em><b>Status Date</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int PROJECT__STATUS_DATE = 50;
/**
* The feature id for the '<em><b>Current Date</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int PROJECT__CURRENT_DATE = 51;
/**
* The feature id for the '<em><b>Microsoft Project Server URL</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int PROJECT__MICROSOFT_PROJECT_SERVER_URL = 52;
/**
* The feature id for the '<em><b>Autolink</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int PROJECT__AUTOLINK = 53;
/**
* The feature id for the '<em><b>New Task Start Date</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int PROJECT__NEW_TASK_START_DATE = 54;
/**
* The feature id for the '<em><b>Default Task EV Method</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int PROJECT__DEFAULT_TASK_EV_METHOD = 55;
/**
* The feature id for the '<em><b>Project Externally Edited</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int PROJECT__PROJECT_EXTERNALLY_EDITED = 56;
/**
* The feature id for the '<em><b>Extended Creation Date</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int PROJECT__EXTENDED_CREATION_DATE = 57;
/**
* The feature id for the '<em><b>Actuals In Sync</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int PROJECT__ACTUALS_IN_SYNC = 58;
/**
* The feature id for the '<em><b>Remove File Properties</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int PROJECT__REMOVE_FILE_PROPERTIES = 59;
/**
* The feature id for the '<em><b>Admin Project</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int PROJECT__ADMIN_PROJECT = 60;
/**
* The feature id for the '<em><b>Outline Codes</b></em>' containment reference.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int PROJECT__OUTLINE_CODES = 61;
/**
* The feature id for the '<em><b>WBS Masks</b></em>' containment reference.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int PROJECT__WBS_MASKS = 62;
/**
* The feature id for the '<em><b>Extended Attributes</b></em>' containment reference.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int PROJECT__EXTENDED_ATTRIBUTES = 63;
/**
* The feature id for the '<em><b>Calendars</b></em>' containment reference.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int PROJECT__CALENDARS = 64;
/**
* The feature id for the '<em><b>Tasks</b></em>' containment reference.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int PROJECT__TASKS = 65;
/**
* The feature id for the '<em><b>Resources</b></em>' containment reference.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int PROJECT__RESOURCES = 66;
/**
* The feature id for the '<em><b>Assignments</b></em>' containment reference.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int PROJECT__ASSIGNMENTS = 67;
/**
* The number of structural features of the the '<em>Project</em>' class.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int PROJECT_FEATURE_COUNT = 68;
/**
* The meta object id for the '{@link org.eclipse.epf.msproject.impl.RateImpl <em>Rate</em>}' class.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @see org.eclipse.epf.msproject.impl.RateImpl
* @see org.eclipse.epf.msproject.impl.MsprojectPackageImpl#getRate()
* @generated
*/
int RATE = 23;
/**
* The feature id for the '<em><b>Rates From</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int RATE__RATES_FROM = 0;
/**
* The feature id for the '<em><b>Rates To</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int RATE__RATES_TO = 1;
/**
* The feature id for the '<em><b>Rate Table</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int RATE__RATE_TABLE = 2;
/**
* The feature id for the '<em><b>Standard Rate</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int RATE__STANDARD_RATE = 3;
/**
* The feature id for the '<em><b>Standard Rate Format</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int RATE__STANDARD_RATE_FORMAT = 4;
/**
* The feature id for the '<em><b>Overtime Rate</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int RATE__OVERTIME_RATE = 5;
/**
* The feature id for the '<em><b>Overtime Rate Format</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int RATE__OVERTIME_RATE_FORMAT = 6;
/**
* The feature id for the '<em><b>Cost Per Use</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int RATE__COST_PER_USE = 7;
/**
* The number of structural features of the the '<em>Rate</em>' class.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int RATE_FEATURE_COUNT = 8;
/**
* The meta object id for the '{@link org.eclipse.epf.msproject.impl.RatesImpl <em>Rates</em>}' class.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @see org.eclipse.epf.msproject.impl.RatesImpl
* @see org.eclipse.epf.msproject.impl.MsprojectPackageImpl#getRates()
* @generated
*/
int RATES = 24;
/**
* The feature id for the '<em><b>Rate</b></em>' containment reference list.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int RATES__RATE = 0;
/**
* The number of structural features of the the '<em>Rates</em>' class.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int RATES_FEATURE_COUNT = 1;
/**
* The meta object id for the '{@link org.eclipse.epf.msproject.impl.ResourceImpl <em>Resource</em>}' class.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @see org.eclipse.epf.msproject.impl.ResourceImpl
* @see org.eclipse.epf.msproject.impl.MsprojectPackageImpl#getResource()
* @generated
*/
int RESOURCE = 25;
/**
* The feature id for the '<em><b>UID</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int RESOURCE__UID = 0;
/**
* The feature id for the '<em><b>ID</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int RESOURCE__ID = 1;
/**
* The feature id for the '<em><b>Name</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int RESOURCE__NAME = 2;
/**
* The feature id for the '<em><b>Type</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int RESOURCE__TYPE = 3;
/**
* The feature id for the '<em><b>Is Null</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int RESOURCE__IS_NULL = 4;
/**
* The feature id for the '<em><b>Initials</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int RESOURCE__INITIALS = 5;
/**
* The feature id for the '<em><b>Phonetics</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int RESOURCE__PHONETICS = 6;
/**
* The feature id for the '<em><b>NT Account</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int RESOURCE__NTACCOUNT = 7;
/**
* The feature id for the '<em><b>Material Label</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int RESOURCE__MATERIAL_LABEL = 8;
/**
* The feature id for the '<em><b>Code</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int RESOURCE__CODE = 9;
/**
* The feature id for the '<em><b>Group</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int RESOURCE__GROUP = 10;
/**
* The feature id for the '<em><b>Work Group</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int RESOURCE__WORK_GROUP = 11;
/**
* The feature id for the '<em><b>Email Address</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int RESOURCE__EMAIL_ADDRESS = 12;
/**
* The feature id for the '<em><b>Hyperlink</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int RESOURCE__HYPERLINK = 13;
/**
* The feature id for the '<em><b>Hyperlink Address</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int RESOURCE__HYPERLINK_ADDRESS = 14;
/**
* The feature id for the '<em><b>Hyperlink Sub Address</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int RESOURCE__HYPERLINK_SUB_ADDRESS = 15;
/**
* The feature id for the '<em><b>Max Units</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int RESOURCE__MAX_UNITS = 16;
/**
* The feature id for the '<em><b>Peak Units</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int RESOURCE__PEAK_UNITS = 17;
/**
* The feature id for the '<em><b>Over Allocated</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int RESOURCE__OVER_ALLOCATED = 18;
/**
* The feature id for the '<em><b>Available From</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int RESOURCE__AVAILABLE_FROM = 19;
/**
* The feature id for the '<em><b>Available To</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int RESOURCE__AVAILABLE_TO = 20;
/**
* The feature id for the '<em><b>Start</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int RESOURCE__START = 21;
/**
* The feature id for the '<em><b>Finish</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int RESOURCE__FINISH = 22;
/**
* The feature id for the '<em><b>Can Level</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int RESOURCE__CAN_LEVEL = 23;
/**
* The feature id for the '<em><b>Accrue At</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int RESOURCE__ACCRUE_AT = 24;
/**
* The feature id for the '<em><b>Work</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int RESOURCE__WORK = 25;
/**
* The feature id for the '<em><b>Regular Work</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int RESOURCE__REGULAR_WORK = 26;
/**
* The feature id for the '<em><b>Overtime Work</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int RESOURCE__OVERTIME_WORK = 27;
/**
* The feature id for the '<em><b>Actual Work</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int RESOURCE__ACTUAL_WORK = 28;
/**
* The feature id for the '<em><b>Remaining Work</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int RESOURCE__REMAINING_WORK = 29;
/**
* The feature id for the '<em><b>Actual Overtime Work</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int RESOURCE__ACTUAL_OVERTIME_WORK = 30;
/**
* The feature id for the '<em><b>Remaining Overtime Work</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int RESOURCE__REMAINING_OVERTIME_WORK = 31;
/**
* The feature id for the '<em><b>Percent Work Complete</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int RESOURCE__PERCENT_WORK_COMPLETE = 32;
/**
* The feature id for the '<em><b>Standard Rate</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int RESOURCE__STANDARD_RATE = 33;
/**
* The feature id for the '<em><b>Standard Rate Format</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int RESOURCE__STANDARD_RATE_FORMAT = 34;
/**
* The feature id for the '<em><b>Cost</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int RESOURCE__COST = 35;
/**
* The feature id for the '<em><b>Overtime Rate</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int RESOURCE__OVERTIME_RATE = 36;
/**
* The feature id for the '<em><b>Overtime Rate Format</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int RESOURCE__OVERTIME_RATE_FORMAT = 37;
/**
* The feature id for the '<em><b>Overtime Cost</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int RESOURCE__OVERTIME_COST = 38;
/**
* The feature id for the '<em><b>Cost Per Use</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int RESOURCE__COST_PER_USE = 39;
/**
* The feature id for the '<em><b>Actual Cost</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int RESOURCE__ACTUAL_COST = 40;
/**
* The feature id for the '<em><b>Actual Overtime Cost</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int RESOURCE__ACTUAL_OVERTIME_COST = 41;
/**
* The feature id for the '<em><b>Remaining Cost</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int RESOURCE__REMAINING_COST = 42;
/**
* The feature id for the '<em><b>Remaining Overtime Cost</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int RESOURCE__REMAINING_OVERTIME_COST = 43;
/**
* The feature id for the '<em><b>Work Variance</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int RESOURCE__WORK_VARIANCE = 44;
/**
* The feature id for the '<em><b>Cost Variance</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int RESOURCE__COST_VARIANCE = 45;
/**
* The feature id for the '<em><b>SV</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int RESOURCE__SV = 46;
/**
* The feature id for the '<em><b>CV</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int RESOURCE__CV = 47;
/**
* The feature id for the '<em><b>ACWP</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int RESOURCE__ACWP = 48;
/**
* The feature id for the '<em><b>Calendar UID</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int RESOURCE__CALENDAR_UID = 49;
/**
* The feature id for the '<em><b>Notes</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int RESOURCE__NOTES = 50;
/**
* The feature id for the '<em><b>BCWS</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int RESOURCE__BCWS = 51;
/**
* The feature id for the '<em><b>BCWP</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int RESOURCE__BCWP = 52;
/**
* The feature id for the '<em><b>Is Generic</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int RESOURCE__IS_GENERIC = 53;
/**
* The feature id for the '<em><b>Is Inactive</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int RESOURCE__IS_INACTIVE = 54;
/**
* The feature id for the '<em><b>Is Enterprise</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int RESOURCE__IS_ENTERPRISE = 55;
/**
* The feature id for the '<em><b>Booking Type</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int RESOURCE__BOOKING_TYPE = 56;
/**
* The feature id for the '<em><b>Actual Work Protected</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int RESOURCE__ACTUAL_WORK_PROTECTED = 57;
/**
* The feature id for the '<em><b>Actual Overtime Work Protected</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int RESOURCE__ACTUAL_OVERTIME_WORK_PROTECTED = 58;
/**
* The feature id for the '<em><b>Active Directory GUID</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int RESOURCE__ACTIVE_DIRECTORY_GUID = 59;
/**
* The feature id for the '<em><b>Creation Date</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int RESOURCE__CREATION_DATE = 60;
/**
* The feature id for the '<em><b>Extended Attribute</b></em>' containment reference list.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int RESOURCE__EXTENDED_ATTRIBUTE = 61;
/**
* The feature id for the '<em><b>Baseline</b></em>' containment reference list.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int RESOURCE__BASELINE = 62;
/**
* The feature id for the '<em><b>Outline Code</b></em>' containment reference list.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int RESOURCE__OUTLINE_CODE = 63;
/**
* The feature id for the '<em><b>Availability Periods</b></em>' containment reference.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int RESOURCE__AVAILABILITY_PERIODS = 64;
/**
* The feature id for the '<em><b>Rates</b></em>' containment reference.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int RESOURCE__RATES = 65;
/**
* The feature id for the '<em><b>Timephased Data</b></em>' containment reference list.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int RESOURCE__TIMEPHASED_DATA = 66;
/**
* The number of structural features of the the '<em>Resource</em>' class.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int RESOURCE_FEATURE_COUNT = 67;
/**
* The meta object id for the '{@link org.eclipse.epf.msproject.impl.ResourcesImpl <em>Resources</em>}' class.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @see org.eclipse.epf.msproject.impl.ResourcesImpl
* @see org.eclipse.epf.msproject.impl.MsprojectPackageImpl#getResources()
* @generated
*/
int RESOURCES = 26;
/**
* The feature id for the '<em><b>Resource</b></em>' containment reference list.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int RESOURCES__RESOURCE = 0;
/**
* The number of structural features of the the '<em>Resources</em>' class.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int RESOURCES_FEATURE_COUNT = 1;
/**
* The meta object id for the '{@link org.eclipse.epf.msproject.impl.TaskImpl <em>Task</em>}' class.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @see org.eclipse.epf.msproject.impl.TaskImpl
* @see org.eclipse.epf.msproject.impl.MsprojectPackageImpl#getTask()
* @generated
*/
int TASK = 27;
/**
* The feature id for the '<em><b>UID</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int TASK__UID = 0;
/**
* The feature id for the '<em><b>ID</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int TASK__ID = 1;
/**
* The feature id for the '<em><b>Name</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int TASK__NAME = 2;
/**
* The feature id for the '<em><b>Type</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int TASK__TYPE = 3;
/**
* The feature id for the '<em><b>Is Null</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int TASK__IS_NULL = 4;
/**
* The feature id for the '<em><b>Create Date</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int TASK__CREATE_DATE = 5;
/**
* The feature id for the '<em><b>Contact</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int TASK__CONTACT = 6;
/**
* The feature id for the '<em><b>WBS</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int TASK__WBS = 7;
/**
* The feature id for the '<em><b>WBS Level</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int TASK__WBS_LEVEL = 8;
/**
* The feature id for the '<em><b>Outline Number</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int TASK__OUTLINE_NUMBER = 9;
/**
* The feature id for the '<em><b>Outline Level</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int TASK__OUTLINE_LEVEL = 10;
/**
* The feature id for the '<em><b>Priority</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int TASK__PRIORITY = 11;
/**
* The feature id for the '<em><b>Start</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int TASK__START = 12;
/**
* The feature id for the '<em><b>Finish</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int TASK__FINISH = 13;
/**
* The feature id for the '<em><b>Duration</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int TASK__DURATION = 14;
/**
* The feature id for the '<em><b>Duration Format</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int TASK__DURATION_FORMAT = 15;
/**
* The feature id for the '<em><b>Work</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int TASK__WORK = 16;
/**
* The feature id for the '<em><b>Stop</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int TASK__STOP = 17;
/**
* The feature id for the '<em><b>Resume</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int TASK__RESUME = 18;
/**
* The feature id for the '<em><b>Resume Valid</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int TASK__RESUME_VALID = 19;
/**
* The feature id for the '<em><b>Effort Driven</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int TASK__EFFORT_DRIVEN = 20;
/**
* The feature id for the '<em><b>Recurring</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int TASK__RECURRING = 21;
/**
* The feature id for the '<em><b>Over Allocated</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int TASK__OVER_ALLOCATED = 22;
/**
* The feature id for the '<em><b>Estimated</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int TASK__ESTIMATED = 23;
/**
* The feature id for the '<em><b>Milestone</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int TASK__MILESTONE = 24;
/**
* The feature id for the '<em><b>Summary</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int TASK__SUMMARY = 25;
/**
* The feature id for the '<em><b>Critical</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int TASK__CRITICAL = 26;
/**
* The feature id for the '<em><b>Is Subproject</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int TASK__IS_SUBPROJECT = 27;
/**
* The feature id for the '<em><b>Is Subproject Read Only</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int TASK__IS_SUBPROJECT_READ_ONLY = 28;
/**
* The feature id for the '<em><b>Subproject Name</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int TASK__SUBPROJECT_NAME = 29;
/**
* The feature id for the '<em><b>External Task</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int TASK__EXTERNAL_TASK = 30;
/**
* The feature id for the '<em><b>External Task Project</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int TASK__EXTERNAL_TASK_PROJECT = 31;
/**
* The feature id for the '<em><b>Early Start</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int TASK__EARLY_START = 32;
/**
* The feature id for the '<em><b>Early Finish</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int TASK__EARLY_FINISH = 33;
/**
* The feature id for the '<em><b>Late Start</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int TASK__LATE_START = 34;
/**
* The feature id for the '<em><b>Late Finish</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int TASK__LATE_FINISH = 35;
/**
* The feature id for the '<em><b>Start Variance</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int TASK__START_VARIANCE = 36;
/**
* The feature id for the '<em><b>Finish Variance</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int TASK__FINISH_VARIANCE = 37;
/**
* The feature id for the '<em><b>Work Variance</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int TASK__WORK_VARIANCE = 38;
/**
* The feature id for the '<em><b>Free Slack</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int TASK__FREE_SLACK = 39;
/**
* The feature id for the '<em><b>Total Slack</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int TASK__TOTAL_SLACK = 40;
/**
* The feature id for the '<em><b>Fixed Cost</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int TASK__FIXED_COST = 41;
/**
* The feature id for the '<em><b>Fixed Cost Accrual</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int TASK__FIXED_COST_ACCRUAL = 42;
/**
* The feature id for the '<em><b>Percent Complete</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int TASK__PERCENT_COMPLETE = 43;
/**
* The feature id for the '<em><b>Percent Work Complete</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int TASK__PERCENT_WORK_COMPLETE = 44;
/**
* The feature id for the '<em><b>Cost</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int TASK__COST = 45;
/**
* The feature id for the '<em><b>Overtime Cost</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int TASK__OVERTIME_COST = 46;
/**
* The feature id for the '<em><b>Overtime Work</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int TASK__OVERTIME_WORK = 47;
/**
* The feature id for the '<em><b>Actual Start</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int TASK__ACTUAL_START = 48;
/**
* The feature id for the '<em><b>Actual Finish</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int TASK__ACTUAL_FINISH = 49;
/**
* The feature id for the '<em><b>Actual Duration</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int TASK__ACTUAL_DURATION = 50;
/**
* The feature id for the '<em><b>Actual Cost</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int TASK__ACTUAL_COST = 51;
/**
* The feature id for the '<em><b>Actual Overtime Cost</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int TASK__ACTUAL_OVERTIME_COST = 52;
/**
* The feature id for the '<em><b>Actual Work</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int TASK__ACTUAL_WORK = 53;
/**
* The feature id for the '<em><b>Actual Overtime Work</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int TASK__ACTUAL_OVERTIME_WORK = 54;
/**
* The feature id for the '<em><b>Regular Work</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int TASK__REGULAR_WORK = 55;
/**
* The feature id for the '<em><b>Remaining Duration</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int TASK__REMAINING_DURATION = 56;
/**
* The feature id for the '<em><b>Remaining Cost</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int TASK__REMAINING_COST = 57;
/**
* The feature id for the '<em><b>Remaining Work</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int TASK__REMAINING_WORK = 58;
/**
* The feature id for the '<em><b>Remaining Overtime Cost</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int TASK__REMAINING_OVERTIME_COST = 59;
/**
* The feature id for the '<em><b>Remaining Overtime Work</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int TASK__REMAINING_OVERTIME_WORK = 60;
/**
* The feature id for the '<em><b>ACWP</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int TASK__ACWP = 61;
/**
* The feature id for the '<em><b>CV</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int TASK__CV = 62;
/**
* The feature id for the '<em><b>Constraint Type</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int TASK__CONSTRAINT_TYPE = 63;
/**
* The feature id for the '<em><b>Calendar UID</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int TASK__CALENDAR_UID = 64;
/**
* The feature id for the '<em><b>Constraint Date</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int TASK__CONSTRAINT_DATE = 65;
/**
* The feature id for the '<em><b>Deadline</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int TASK__DEADLINE = 66;
/**
* The feature id for the '<em><b>Level Assignments</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int TASK__LEVEL_ASSIGNMENTS = 67;
/**
* The feature id for the '<em><b>Leveling Can Split</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int TASK__LEVELING_CAN_SPLIT = 68;
/**
* The feature id for the '<em><b>Leveling Delay</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int TASK__LEVELING_DELAY = 69;
/**
* The feature id for the '<em><b>Leveling Delay Format</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int TASK__LEVELING_DELAY_FORMAT = 70;
/**
* The feature id for the '<em><b>Pre Leveled Start</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int TASK__PRE_LEVELED_START = 71;
/**
* The feature id for the '<em><b>Pre Leveled Finish</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int TASK__PRE_LEVELED_FINISH = 72;
/**
* The feature id for the '<em><b>Hyperlink</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int TASK__HYPERLINK = 73;
/**
* The feature id for the '<em><b>Hyperlink Address</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int TASK__HYPERLINK_ADDRESS = 74;
/**
* The feature id for the '<em><b>Hyperlink Sub Address</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int TASK__HYPERLINK_SUB_ADDRESS = 75;
/**
* The feature id for the '<em><b>Ignore Resource Calendar</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int TASK__IGNORE_RESOURCE_CALENDAR = 76;
/**
* The feature id for the '<em><b>Notes</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int TASK__NOTES = 77;
/**
* The feature id for the '<em><b>Hide Bar</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int TASK__HIDE_BAR = 78;
/**
* The feature id for the '<em><b>Rollup</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int TASK__ROLLUP = 79;
/**
* The feature id for the '<em><b>BCWS</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int TASK__BCWS = 80;
/**
* The feature id for the '<em><b>BCWP</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int TASK__BCWP = 81;
/**
* The feature id for the '<em><b>Physical Percent Complete</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int TASK__PHYSICAL_PERCENT_COMPLETE = 82;
/**
* The feature id for the '<em><b>Earned Value Method</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int TASK__EARNED_VALUE_METHOD = 83;
/**
* The feature id for the '<em><b>Predecessor Link</b></em>' containment reference list.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int TASK__PREDECESSOR_LINK = 84;
/**
* The feature id for the '<em><b>Actual Work Protected</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int TASK__ACTUAL_WORK_PROTECTED = 85;
/**
* The feature id for the '<em><b>Actual Overtime Work Protected</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int TASK__ACTUAL_OVERTIME_WORK_PROTECTED = 86;
/**
* The feature id for the '<em><b>Extended Attribute</b></em>' containment reference list.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int TASK__EXTENDED_ATTRIBUTE = 87;
/**
* The feature id for the '<em><b>Baseline</b></em>' containment reference list.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int TASK__BASELINE = 88;
/**
* The feature id for the '<em><b>Outline Code</b></em>' containment reference list.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int TASK__OUTLINE_CODE = 89;
/**
* The feature id for the '<em><b>Timephased Data</b></em>' containment reference list.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int TASK__TIMEPHASED_DATA = 90;
/**
* The number of structural features of the the '<em>Task</em>' class.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int TASK_FEATURE_COUNT = 91;
/**
* The meta object id for the '{@link org.eclipse.epf.msproject.impl.TasksImpl <em>Tasks</em>}' class.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @see org.eclipse.epf.msproject.impl.TasksImpl
* @see org.eclipse.epf.msproject.impl.MsprojectPackageImpl#getTasks()
* @generated
*/
int TASKS = 28;
/**
* The feature id for the '<em><b>Task</b></em>' containment reference list.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int TASKS__TASK = 0;
/**
* The number of structural features of the the '<em>Tasks</em>' class.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int TASKS_FEATURE_COUNT = 1;
/**
* The meta object id for the '{@link org.eclipse.epf.msproject.impl.TimePeriodImpl <em>Time Period</em>}' class.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @see org.eclipse.epf.msproject.impl.TimePeriodImpl
* @see org.eclipse.epf.msproject.impl.MsprojectPackageImpl#getTimePeriod()
* @generated
*/
int TIME_PERIOD = 29;
/**
* The feature id for the '<em><b>From Date</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int TIME_PERIOD__FROM_DATE = 0;
/**
* The feature id for the '<em><b>To Date</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int TIME_PERIOD__TO_DATE = 1;
/**
* The number of structural features of the the '<em>Time Period</em>' class.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int TIME_PERIOD_FEATURE_COUNT = 2;
/**
* The meta object id for the '{@link org.eclipse.epf.msproject.impl.TimephasedDataTypeImpl <em>Timephased Data Type</em>}' class.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @see org.eclipse.epf.msproject.impl.TimephasedDataTypeImpl
* @see org.eclipse.epf.msproject.impl.MsprojectPackageImpl#getTimephasedDataType()
* @generated
*/
int TIMEPHASED_DATA_TYPE = 30;
/**
* The feature id for the '<em><b>Type</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int TIMEPHASED_DATA_TYPE__TYPE = 0;
/**
* The feature id for the '<em><b>UID</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int TIMEPHASED_DATA_TYPE__UID = 1;
/**
* The feature id for the '<em><b>Start</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int TIMEPHASED_DATA_TYPE__START = 2;
/**
* The feature id for the '<em><b>Finish</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int TIMEPHASED_DATA_TYPE__FINISH = 3;
/**
* The feature id for the '<em><b>Unit</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int TIMEPHASED_DATA_TYPE__UNIT = 4;
/**
* The feature id for the '<em><b>Value</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int TIMEPHASED_DATA_TYPE__VALUE = 5;
/**
* The number of structural features of the the '<em>Timephased Data Type</em>' class.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int TIMEPHASED_DATA_TYPE_FEATURE_COUNT = 6;
/**
* The meta object id for the '{@link org.eclipse.epf.msproject.impl.ValueImpl <em>Value</em>}' class.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @see org.eclipse.epf.msproject.impl.ValueImpl
* @see org.eclipse.epf.msproject.impl.MsprojectPackageImpl#getValue()
* @generated
*/
int VALUE = 31;
/**
* The feature id for the '<em><b>Value ID</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int VALUE__VALUE_ID = 0;
/**
* The feature id for the '<em><b>Parent Value ID</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int VALUE__PARENT_VALUE_ID = 1;
/**
* The feature id for the '<em><b>Value</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int VALUE__VALUE = 2;
/**
* The feature id for the '<em><b>Description</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int VALUE__DESCRIPTION = 3;
/**
* The number of structural features of the the '<em>Value</em>' class.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int VALUE_FEATURE_COUNT = 4;
/**
* The meta object id for the '{@link org.eclipse.epf.msproject.impl.Value2Impl <em>Value2</em>}' class.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @see org.eclipse.epf.msproject.impl.Value2Impl
* @see org.eclipse.epf.msproject.impl.MsprojectPackageImpl#getValue2()
* @generated
*/
int VALUE2 = 32;
/**
* The feature id for the '<em><b>ID</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int VALUE2__ID = 0;
/**
* The feature id for the '<em><b>Value</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int VALUE2__VALUE = 1;
/**
* The feature id for the '<em><b>Description</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int VALUE2__DESCRIPTION = 2;
/**
* The number of structural features of the the '<em>Value2</em>' class.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int VALUE2_FEATURE_COUNT = 3;
/**
* The meta object id for the '{@link org.eclipse.epf.msproject.impl.ValueListImpl <em>Value List</em>}' class.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @see org.eclipse.epf.msproject.impl.ValueListImpl
* @see org.eclipse.epf.msproject.impl.MsprojectPackageImpl#getValueList()
* @generated
*/
int VALUE_LIST = 33;
/**
* The feature id for the '<em><b>Value</b></em>' containment reference list.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int VALUE_LIST__VALUE = 0;
/**
* The number of structural features of the the '<em>Value List</em>' class.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int VALUE_LIST_FEATURE_COUNT = 1;
/**
* The meta object id for the '{@link org.eclipse.epf.msproject.impl.ValuesImpl <em>Values</em>}' class.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @see org.eclipse.epf.msproject.impl.ValuesImpl
* @see org.eclipse.epf.msproject.impl.MsprojectPackageImpl#getValues()
* @generated
*/
int VALUES = 34;
/**
* The feature id for the '<em><b>Group</b></em>' attribute list.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int VALUES__GROUP = 0;
/**
* The feature id for the '<em><b>Value</b></em>' containment reference list.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int VALUES__VALUE = 1;
/**
* The number of structural features of the the '<em>Values</em>' class.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int VALUES_FEATURE_COUNT = 2;
/**
* The meta object id for the '{@link org.eclipse.epf.msproject.impl.WBSMaskImpl <em>WBS Mask</em>}' class.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @see org.eclipse.epf.msproject.impl.WBSMaskImpl
* @see org.eclipse.epf.msproject.impl.MsprojectPackageImpl#getWBSMask()
* @generated
*/
int WBS_MASK = 35;
/**
* The feature id for the '<em><b>Level</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int WBS_MASK__LEVEL = 0;
/**
* The feature id for the '<em><b>Type</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int WBS_MASK__TYPE = 1;
/**
* The feature id for the '<em><b>Length</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int WBS_MASK__LENGTH = 2;
/**
* The feature id for the '<em><b>Separator</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int WBS_MASK__SEPARATOR = 3;
/**
* The number of structural features of the the '<em>WBS Mask</em>' class.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int WBS_MASK_FEATURE_COUNT = 4;
/**
* The meta object id for the '{@link org.eclipse.epf.msproject.impl.WBSMasksImpl <em>WBS Masks</em>}' class.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @see org.eclipse.epf.msproject.impl.WBSMasksImpl
* @see org.eclipse.epf.msproject.impl.MsprojectPackageImpl#getWBSMasks()
* @generated
*/
int WBS_MASKS = 36;
/**
* The feature id for the '<em><b>Verify Unique Codes</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int WBS_MASKS__VERIFY_UNIQUE_CODES = 0;
/**
* The feature id for the '<em><b>Generate Codes</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int WBS_MASKS__GENERATE_CODES = 1;
/**
* The feature id for the '<em><b>Prefix</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int WBS_MASKS__PREFIX = 2;
/**
* The feature id for the '<em><b>WBS Mask</b></em>' containment reference list.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int WBS_MASKS__WBS_MASK = 3;
/**
* The number of structural features of the the '<em>WBS Masks</em>' class.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int WBS_MASKS_FEATURE_COUNT = 4;
/**
* The meta object id for the '{@link org.eclipse.epf.msproject.impl.WeekDayImpl <em>Week Day</em>}' class.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @see org.eclipse.epf.msproject.impl.WeekDayImpl
* @see org.eclipse.epf.msproject.impl.MsprojectPackageImpl#getWeekDay()
* @generated
*/
int WEEK_DAY = 37;
/**
* The feature id for the '<em><b>Day Type</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int WEEK_DAY__DAY_TYPE = 0;
/**
* The feature id for the '<em><b>Day Working</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int WEEK_DAY__DAY_WORKING = 1;
/**
* The feature id for the '<em><b>Time Period</b></em>' containment reference.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int WEEK_DAY__TIME_PERIOD = 2;
/**
* The feature id for the '<em><b>Working Times</b></em>' containment reference.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int WEEK_DAY__WORKING_TIMES = 3;
/**
* The number of structural features of the the '<em>Week Day</em>' class.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int WEEK_DAY_FEATURE_COUNT = 4;
/**
* The meta object id for the '{@link org.eclipse.epf.msproject.impl.WeekDaysImpl <em>Week Days</em>}' class.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @see org.eclipse.epf.msproject.impl.WeekDaysImpl
* @see org.eclipse.epf.msproject.impl.MsprojectPackageImpl#getWeekDays()
* @generated
*/
int WEEK_DAYS = 38;
/**
* The feature id for the '<em><b>Week Day</b></em>' containment reference list.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int WEEK_DAYS__WEEK_DAY = 0;
/**
* The number of structural features of the the '<em>Week Days</em>' class.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int WEEK_DAYS_FEATURE_COUNT = 1;
/**
* The meta object id for the '{@link org.eclipse.epf.msproject.impl.WorkingTimeImpl <em>Working Time</em>}' class.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @see org.eclipse.epf.msproject.impl.WorkingTimeImpl
* @see org.eclipse.epf.msproject.impl.MsprojectPackageImpl#getWorkingTime()
* @generated
*/
int WORKING_TIME = 39;
/**
* The feature id for the '<em><b>From Time</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int WORKING_TIME__FROM_TIME = 0;
/**
* The feature id for the '<em><b>To Time</b></em>' attribute.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int WORKING_TIME__TO_TIME = 1;
/**
* The number of structural features of the the '<em>Working Time</em>' class.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int WORKING_TIME_FEATURE_COUNT = 2;
/**
* The meta object id for the '{@link org.eclipse.epf.msproject.impl.WorkingTimesImpl <em>Working Times</em>}' class.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @see org.eclipse.epf.msproject.impl.WorkingTimesImpl
* @see org.eclipse.epf.msproject.impl.MsprojectPackageImpl#getWorkingTimes()
* @generated
*/
int WORKING_TIMES = 40;
/**
* The feature id for the '<em><b>Working Time</b></em>' containment reference list.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int WORKING_TIMES__WORKING_TIME = 0;
/**
* The number of structural features of the the '<em>Working Times</em>' class.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @generated
* @ordered
*/
int WORKING_TIMES_FEATURE_COUNT = 1;
/**
* The meta object id for the '<em>Accrue At</em>' data type.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @see java.math.BigInteger
* @see org.eclipse.epf.msproject.impl.MsprojectPackageImpl#getAccrueAt()
* @generated
*/
int ACCRUE_AT = 41;
/**
* The meta object id for the '<em>Active Directory GUID Type</em>' data type.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @see java.lang.String
* @see org.eclipse.epf.msproject.impl.MsprojectPackageImpl#getActiveDirectoryGUIDType()
* @generated
*/
int ACTIVE_DIRECTORY_GUID_TYPE = 42;
/**
* The meta object id for the '<em>Alias Type</em>' data type.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @see java.lang.String
* @see org.eclipse.epf.msproject.impl.MsprojectPackageImpl#getAliasType()
* @generated
*/
int ALIAS_TYPE = 43;
/**
* The meta object id for the '<em>Author Type</em>' data type.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @see java.lang.String
* @see org.eclipse.epf.msproject.impl.MsprojectPackageImpl#getAuthorType()
* @generated
*/
int AUTHOR_TYPE = 44;
/**
* The meta object id for the '<em>Baseline For Earned Value Type</em>' data type.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @see java.math.BigInteger
* @see org.eclipse.epf.msproject.impl.MsprojectPackageImpl#getBaselineForEarnedValueType()
* @generated
*/
int BASELINE_FOR_EARNED_VALUE_TYPE = 45;
/**
* The meta object id for the '<em>Booking Type Type</em>' data type.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @see java.math.BigInteger
* @see org.eclipse.epf.msproject.impl.MsprojectPackageImpl#getBookingTypeType()
* @generated
*/
int BOOKING_TYPE_TYPE = 46;
/**
* The meta object id for the '<em>Booking Type Type1</em>' data type.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @see java.math.BigInteger
* @see org.eclipse.epf.msproject.impl.MsprojectPackageImpl#getBookingTypeType1()
* @generated
*/
int BOOKING_TYPE_TYPE1 = 47;
/**
* The meta object id for the '<em>Calculation Type Type</em>' data type.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @see java.math.BigInteger
* @see org.eclipse.epf.msproject.impl.MsprojectPackageImpl#getCalculationTypeType()
* @generated
*/
int CALCULATION_TYPE_TYPE = 48;
/**
* The meta object id for the '<em>Category Type</em>' data type.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @see java.lang.String
* @see org.eclipse.epf.msproject.impl.MsprojectPackageImpl#getCategoryType()
* @generated
*/
int CATEGORY_TYPE = 49;
/**
* The meta object id for the '<em>Code Type</em>' data type.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @see java.lang.String
* @see org.eclipse.epf.msproject.impl.MsprojectPackageImpl#getCodeType()
* @generated
*/
int CODE_TYPE = 50;
/**
* The meta object id for the '<em>Company Type</em>' data type.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @see java.lang.String
* @see org.eclipse.epf.msproject.impl.MsprojectPackageImpl#getCompanyType()
* @generated
*/
int COMPANY_TYPE = 51;
/**
* The meta object id for the '<em>Constraint Type Type</em>' data type.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @see java.math.BigInteger
* @see org.eclipse.epf.msproject.impl.MsprojectPackageImpl#getConstraintTypeType()
* @generated
*/
int CONSTRAINT_TYPE_TYPE = 52;
/**
* The meta object id for the '<em>Contact Type</em>' data type.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @see java.lang.String
* @see org.eclipse.epf.msproject.impl.MsprojectPackageImpl#getContactType()
* @generated
*/
int CONTACT_TYPE = 53;
/**
* The meta object id for the '<em>Cost Rate Table Type</em>' data type.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @see java.math.BigInteger
* @see org.eclipse.epf.msproject.impl.MsprojectPackageImpl#getCostRateTableType()
* @generated
*/
int COST_RATE_TABLE_TYPE = 54;
/**
* The meta object id for the '<em>Currency Symbol Position Type</em>' data type.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @see java.math.BigInteger
* @see org.eclipse.epf.msproject.impl.MsprojectPackageImpl#getCurrencySymbolPositionType()
* @generated
*/
int CURRENCY_SYMBOL_POSITION_TYPE = 55;
/**
* The meta object id for the '<em>Currency Symbol Type</em>' data type.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @see java.lang.String
* @see org.eclipse.epf.msproject.impl.MsprojectPackageImpl#getCurrencySymbolType()
* @generated
*/
int CURRENCY_SYMBOL_TYPE = 56;
/**
* The meta object id for the '<em>Day Type Type</em>' data type.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @see java.math.BigInteger
* @see org.eclipse.epf.msproject.impl.MsprojectPackageImpl#getDayTypeType()
* @generated
*/
int DAY_TYPE_TYPE = 57;
/**
* The meta object id for the '<em>Default Fixed Cost Accrual Type</em>' data type.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @see java.math.BigInteger
* @see org.eclipse.epf.msproject.impl.MsprojectPackageImpl#getDefaultFixedCostAccrualType()
* @generated
*/
int DEFAULT_FIXED_COST_ACCRUAL_TYPE = 58;
/**
* The meta object id for the '<em>Default Task EV Method Type</em>' data type.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @see java.math.BigInteger
* @see org.eclipse.epf.msproject.impl.MsprojectPackageImpl#getDefaultTaskEVMethodType()
* @generated
*/
int DEFAULT_TASK_EV_METHOD_TYPE = 59;
/**
* The meta object id for the '<em>Default Task Type Type</em>' data type.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @see java.math.BigInteger
* @see org.eclipse.epf.msproject.impl.MsprojectPackageImpl#getDefaultTaskTypeType()
* @generated
*/
int DEFAULT_TASK_TYPE_TYPE = 60;
/**
* The meta object id for the '<em>Duration Format Type</em>' data type.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @see java.math.BigInteger
* @see org.eclipse.epf.msproject.impl.MsprojectPackageImpl#getDurationFormatType()
* @generated
*/
int DURATION_FORMAT_TYPE = 61;
/**
* The meta object id for the '<em>Duration Format Type1</em>' data type.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @see java.math.BigInteger
* @see org.eclipse.epf.msproject.impl.MsprojectPackageImpl#getDurationFormatType1()
* @generated
*/
int DURATION_FORMAT_TYPE1 = 62;
/**
* The meta object id for the '<em>Duration Format Type2</em>' data type.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @see java.math.BigInteger
* @see org.eclipse.epf.msproject.impl.MsprojectPackageImpl#getDurationFormatType2()
* @generated
*/
int DURATION_FORMAT_TYPE2 = 63;
/**
* The meta object id for the '<em>Duration Format Type3</em>' data type.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @see java.math.BigInteger
* @see org.eclipse.epf.msproject.impl.MsprojectPackageImpl#getDurationFormatType3()
* @generated
*/
int DURATION_FORMAT_TYPE3 = 64;
/**
* The meta object id for the '<em>Duration Format Type4</em>' data type.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @see java.math.BigInteger
* @see org.eclipse.epf.msproject.impl.MsprojectPackageImpl#getDurationFormatType4()
* @generated
*/
int DURATION_FORMAT_TYPE4 = 65;
/**
* The meta object id for the '<em>Duration Format Type5</em>' data type.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @see java.math.BigInteger
* @see org.eclipse.epf.msproject.impl.MsprojectPackageImpl#getDurationFormatType5()
* @generated
*/
int DURATION_FORMAT_TYPE5 = 66;
/**
* The meta object id for the '<em>Earned Value Method Type</em>' data type.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @see java.math.BigInteger
* @see org.eclipse.epf.msproject.impl.MsprojectPackageImpl#getEarnedValueMethodType()
* @generated
*/
int EARNED_VALUE_METHOD_TYPE = 67;
/**
* The meta object id for the '<em>Earned Value Method Type1</em>' data type.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @see java.math.BigInteger
* @see org.eclipse.epf.msproject.impl.MsprojectPackageImpl#getEarnedValueMethodType1()
* @generated
*/
int EARNED_VALUE_METHOD_TYPE1 = 68;
/**
* The meta object id for the '<em>Email Address Type</em>' data type.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @see java.lang.String
* @see org.eclipse.epf.msproject.impl.MsprojectPackageImpl#getEmailAddressType()
* @generated
*/
int EMAIL_ADDRESS_TYPE = 69;
/**
* The meta object id for the '<em>External Task Project Type</em>' data type.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @see java.lang.String
* @see org.eclipse.epf.msproject.impl.MsprojectPackageImpl#getExternalTaskProjectType()
* @generated
*/
int EXTERNAL_TASK_PROJECT_TYPE = 70;
/**
* The meta object id for the '<em>Fixed Cost Accrual Type</em>' data type.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @see java.lang.String
* @see org.eclipse.epf.msproject.impl.MsprojectPackageImpl#getFixedCostAccrualType()
* @generated
*/
int FIXED_COST_ACCRUAL_TYPE = 71;
/**
* The meta object id for the '<em>FY Start Date Type</em>' data type.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @see java.math.BigInteger
* @see org.eclipse.epf.msproject.impl.MsprojectPackageImpl#getFYStartDateType()
* @generated
*/
int FY_START_DATE_TYPE = 72;
/**
* The meta object id for the '<em>Group Type</em>' data type.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @see java.lang.String
* @see org.eclipse.epf.msproject.impl.MsprojectPackageImpl#getGroupType()
* @generated
*/
int GROUP_TYPE = 73;
/**
* The meta object id for the '<em>Hyperlink Address Type</em>' data type.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @see java.lang.String
* @see org.eclipse.epf.msproject.impl.MsprojectPackageImpl#getHyperlinkAddressType()
* @generated
*/
int HYPERLINK_ADDRESS_TYPE = 74;
/**
* The meta object id for the '<em>Hyperlink Address Type1</em>' data type.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @see java.lang.String
* @see org.eclipse.epf.msproject.impl.MsprojectPackageImpl#getHyperlinkAddressType1()
* @generated
*/
int HYPERLINK_ADDRESS_TYPE1 = 75;
/**
* The meta object id for the '<em>Hyperlink Address Type2</em>' data type.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @see java.lang.String
* @see org.eclipse.epf.msproject.impl.MsprojectPackageImpl#getHyperlinkAddressType2()
* @generated
*/
int HYPERLINK_ADDRESS_TYPE2 = 76;
/**
* The meta object id for the '<em>Hyperlink Sub Address Type</em>' data type.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @see java.lang.String
* @see org.eclipse.epf.msproject.impl.MsprojectPackageImpl#getHyperlinkSubAddressType()
* @generated
*/
int HYPERLINK_SUB_ADDRESS_TYPE = 77;
/**
* The meta object id for the '<em>Hyperlink Sub Address Type1</em>' data type.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @see java.lang.String
* @see org.eclipse.epf.msproject.impl.MsprojectPackageImpl#getHyperlinkSubAddressType1()
* @generated
*/
int HYPERLINK_SUB_ADDRESS_TYPE1 = 78;
/**
* The meta object id for the '<em>Hyperlink Sub Address Type2</em>' data type.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @see java.lang.String
* @see org.eclipse.epf.msproject.impl.MsprojectPackageImpl#getHyperlinkSubAddressType2()
* @generated
*/
int HYPERLINK_SUB_ADDRESS_TYPE2 = 79;
/**
* The meta object id for the '<em>Hyperlink Type</em>' data type.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @see java.lang.String
* @see org.eclipse.epf.msproject.impl.MsprojectPackageImpl#getHyperlinkType()
* @generated
*/
int HYPERLINK_TYPE = 80;
/**
* The meta object id for the '<em>Hyperlink Type1</em>' data type.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @see java.lang.String
* @see org.eclipse.epf.msproject.impl.MsprojectPackageImpl#getHyperlinkType1()
* @generated
*/
int HYPERLINK_TYPE1 = 81;
/**
* The meta object id for the '<em>Hyperlink Type2</em>' data type.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @see java.lang.String
* @see org.eclipse.epf.msproject.impl.MsprojectPackageImpl#getHyperlinkType2()
* @generated
*/
int HYPERLINK_TYPE2 = 82;
/**
* The meta object id for the '<em>Initials Type</em>' data type.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @see java.lang.String
* @see org.eclipse.epf.msproject.impl.MsprojectPackageImpl#getInitialsType()
* @generated
*/
int INITIALS_TYPE = 83;
/**
* The meta object id for the '<em>Lag Format Type</em>' data type.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @see java.math.BigInteger
* @see org.eclipse.epf.msproject.impl.MsprojectPackageImpl#getLagFormatType()
* @generated
*/
int LAG_FORMAT_TYPE = 84;
/**
* The meta object id for the '<em>Leveling Delay Format Type</em>' data type.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @see java.math.BigInteger
* @see org.eclipse.epf.msproject.impl.MsprojectPackageImpl#getLevelingDelayFormatType()
* @generated
*/
int LEVELING_DELAY_FORMAT_TYPE = 85;
/**
* The meta object id for the '<em>Leveling Delay Format Type1</em>' data type.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @see java.math.BigInteger
* @see org.eclipse.epf.msproject.impl.MsprojectPackageImpl#getLevelingDelayFormatType1()
* @generated
*/
int LEVELING_DELAY_FORMAT_TYPE1 = 86;
/**
* The meta object id for the '<em>Manager Type</em>' data type.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @see java.lang.String
* @see org.eclipse.epf.msproject.impl.MsprojectPackageImpl#getManagerType()
* @generated
*/
int MANAGER_TYPE = 87;
/**
* The meta object id for the '<em>Material Label Type</em>' data type.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @see java.lang.String
* @see org.eclipse.epf.msproject.impl.MsprojectPackageImpl#getMaterialLabelType()
* @generated
*/
int MATERIAL_LABEL_TYPE = 88;
/**
* The meta object id for the '<em>Name Type</em>' data type.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @see java.lang.String
* @see org.eclipse.epf.msproject.impl.MsprojectPackageImpl#getNameType()
* @generated
*/
int NAME_TYPE = 89;
/**
* The meta object id for the '<em>Name Type1</em>' data type.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @see java.lang.String
* @see org.eclipse.epf.msproject.impl.MsprojectPackageImpl#getNameType1()
* @generated
*/
int NAME_TYPE1 = 90;
/**
* The meta object id for the '<em>Name Type2</em>' data type.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @see java.lang.String
* @see org.eclipse.epf.msproject.impl.MsprojectPackageImpl#getNameType2()
* @generated
*/
int NAME_TYPE2 = 91;
/**
* The meta object id for the '<em>Name Type3</em>' data type.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @see java.lang.String
* @see org.eclipse.epf.msproject.impl.MsprojectPackageImpl#getNameType3()
* @generated
*/
int NAME_TYPE3 = 92;
/**
* The meta object id for the '<em>New Task Start Date Type</em>' data type.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @see java.math.BigInteger
* @see org.eclipse.epf.msproject.impl.MsprojectPackageImpl#getNewTaskStartDateType()
* @generated
*/
int NEW_TASK_START_DATE_TYPE = 93;
/**
* The meta object id for the '<em>NT Account Type</em>' data type.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @see java.lang.String
* @see org.eclipse.epf.msproject.impl.MsprojectPackageImpl#getNTAccountType()
* @generated
*/
int NT_ACCOUNT_TYPE = 94;
/**
* The meta object id for the '<em>Outline Number Type</em>' data type.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @see java.lang.String
* @see org.eclipse.epf.msproject.impl.MsprojectPackageImpl#getOutlineNumberType()
* @generated
*/
int OUTLINE_NUMBER_TYPE = 95;
/**
* The meta object id for the '<em>Overtime Rate Format Type</em>' data type.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @see java.math.BigInteger
* @see org.eclipse.epf.msproject.impl.MsprojectPackageImpl#getOvertimeRateFormatType()
* @generated
*/
int OVERTIME_RATE_FORMAT_TYPE = 96;
/**
* The meta object id for the '<em>Overtime Rate Format Type1</em>' data type.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @see java.math.BigInteger
* @see org.eclipse.epf.msproject.impl.MsprojectPackageImpl#getOvertimeRateFormatType1()
* @generated
*/
int OVERTIME_RATE_FORMAT_TYPE1 = 97;
/**
* The meta object id for the '<em>Phonetic Alias Type</em>' data type.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @see java.lang.String
* @see org.eclipse.epf.msproject.impl.MsprojectPackageImpl#getPhoneticAliasType()
* @generated
*/
int PHONETIC_ALIAS_TYPE = 98;
/**
* The meta object id for the '<em>Phonetics Type</em>' data type.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @see java.lang.String
* @see org.eclipse.epf.msproject.impl.MsprojectPackageImpl#getPhoneticsType()
* @generated
*/
int PHONETICS_TYPE = 99;
/**
* The meta object id for the '<em>Prefix Type</em>' data type.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @see java.lang.String
* @see org.eclipse.epf.msproject.impl.MsprojectPackageImpl#getPrefixType()
* @generated
*/
int PREFIX_TYPE = 100;
/**
* The meta object id for the '<em>Rate Table Type</em>' data type.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @see java.math.BigInteger
* @see org.eclipse.epf.msproject.impl.MsprojectPackageImpl#getRateTableType()
* @generated
*/
int RATE_TABLE_TYPE = 101;
/**
* The meta object id for the '<em>Rollup Type Type</em>' data type.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @see java.math.BigInteger
* @see org.eclipse.epf.msproject.impl.MsprojectPackageImpl#getRollupTypeType()
* @generated
*/
int ROLLUP_TYPE_TYPE = 102;
/**
* The meta object id for the '<em>Standard Rate Format Type</em>' data type.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @see java.math.BigInteger
* @see org.eclipse.epf.msproject.impl.MsprojectPackageImpl#getStandardRateFormatType()
* @generated
*/
int STANDARD_RATE_FORMAT_TYPE = 103;
/**
* The meta object id for the '<em>Standard Rate Format Type1</em>' data type.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @see java.math.BigInteger
* @see org.eclipse.epf.msproject.impl.MsprojectPackageImpl#getStandardRateFormatType1()
* @generated
*/
int STANDARD_RATE_FORMAT_TYPE1 = 104;
/**
* The meta object id for the '<em>Subject Type</em>' data type.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @see java.lang.String
* @see org.eclipse.epf.msproject.impl.MsprojectPackageImpl#getSubjectType()
* @generated
*/
int SUBJECT_TYPE = 105;
/**
* The meta object id for the '<em>Subproject Name Type</em>' data type.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @see java.lang.String
* @see org.eclipse.epf.msproject.impl.MsprojectPackageImpl#getSubprojectNameType()
* @generated
*/
int SUBPROJECT_NAME_TYPE = 106;
/**
* The meta object id for the '<em>Title Type</em>' data type.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @see java.lang.String
* @see org.eclipse.epf.msproject.impl.MsprojectPackageImpl#getTitleType()
* @generated
*/
int TITLE_TYPE = 107;
/**
* The meta object id for the '<em>Type Type</em>' data type.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @see java.math.BigInteger
* @see org.eclipse.epf.msproject.impl.MsprojectPackageImpl#getTypeType()
* @generated
*/
int TYPE_TYPE = 108;
/**
* The meta object id for the '<em>Type Type1</em>' data type.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @see java.math.BigInteger
* @see org.eclipse.epf.msproject.impl.MsprojectPackageImpl#getTypeType1()
* @generated
*/
int TYPE_TYPE1 = 109;
/**
* The meta object id for the '<em>Type Type2</em>' data type.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @see java.math.BigInteger
* @see org.eclipse.epf.msproject.impl.MsprojectPackageImpl#getTypeType2()
* @generated
*/
int TYPE_TYPE2 = 110;
/**
* The meta object id for the '<em>Type Type3</em>' data type.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @see java.math.BigInteger
* @see org.eclipse.epf.msproject.impl.MsprojectPackageImpl#getTypeType3()
* @generated
*/
int TYPE_TYPE3 = 111;
/**
* The meta object id for the '<em>Type Type4</em>' data type.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @see java.math.BigInteger
* @see org.eclipse.epf.msproject.impl.MsprojectPackageImpl#getTypeType4()
* @generated
*/
int TYPE_TYPE4 = 112;
/**
* The meta object id for the '<em>Type Type5</em>' data type.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @see java.math.BigInteger
* @see org.eclipse.epf.msproject.impl.MsprojectPackageImpl#getTypeType5()
* @generated
*/
int TYPE_TYPE5 = 113;
/**
* The meta object id for the '<em>UID Type</em>' data type.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @see java.lang.String
* @see org.eclipse.epf.msproject.impl.MsprojectPackageImpl#getUIDType()
* @generated
*/
int UID_TYPE = 114;
/**
* The meta object id for the '<em>Unit Type</em>' data type.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @see java.math.BigInteger
* @see org.eclipse.epf.msproject.impl.MsprojectPackageImpl#getUnitType()
* @generated
*/
int UNIT_TYPE = 115;
/**
* The meta object id for the '<em>Valuelist Sort Order Type</em>' data type.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @see java.math.BigInteger
* @see org.eclipse.epf.msproject.impl.MsprojectPackageImpl#getValuelistSortOrderType()
* @generated
*/
int VALUELIST_SORT_ORDER_TYPE = 116;
/**
* The meta object id for the '<em>Week Start Day Type</em>' data type.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @see java.math.BigInteger
* @see org.eclipse.epf.msproject.impl.MsprojectPackageImpl#getWeekStartDayType()
* @generated
*/
int WEEK_START_DAY_TYPE = 117;
/**
* The meta object id for the '<em>Work Contour Type</em>' data type.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @see java.math.BigInteger
* @see org.eclipse.epf.msproject.impl.MsprojectPackageImpl#getWorkContourType()
* @generated
*/
int WORK_CONTOUR_TYPE = 118;
/**
* The meta object id for the '<em>Work Format Type</em>' data type.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @see java.math.BigInteger
* @see org.eclipse.epf.msproject.impl.MsprojectPackageImpl#getWorkFormatType()
* @generated
*/
int WORK_FORMAT_TYPE = 119;
/**
* The meta object id for the '<em>Work Group Type</em>' data type.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @see java.math.BigInteger
* @see org.eclipse.epf.msproject.impl.MsprojectPackageImpl#getWorkGroupType()
* @generated
*/
int WORK_GROUP_TYPE = 120;
/**
* Returns the meta object for class '{@link org.eclipse.epf.msproject.Assignment <em>Assignment</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for class '<em>Assignment</em>'.
* @see org.eclipse.epf.msproject.Assignment
* @generated
*/
EClass getAssignment();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Assignment#getUID <em>UID</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>UID</em>'.
* @see org.eclipse.epf.msproject.Assignment#getUID()
* @see #getAssignment()
* @generated
*/
EAttribute getAssignment_UID();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Assignment#getTaskUID <em>Task UID</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Task UID</em>'.
* @see org.eclipse.epf.msproject.Assignment#getTaskUID()
* @see #getAssignment()
* @generated
*/
EAttribute getAssignment_TaskUID();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Assignment#getResourceUID <em>Resource UID</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Resource UID</em>'.
* @see org.eclipse.epf.msproject.Assignment#getResourceUID()
* @see #getAssignment()
* @generated
*/
EAttribute getAssignment_ResourceUID();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Assignment#getPercentWorkComplete <em>Percent Work Complete</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Percent Work Complete</em>'.
* @see org.eclipse.epf.msproject.Assignment#getPercentWorkComplete()
* @see #getAssignment()
* @generated
*/
EAttribute getAssignment_PercentWorkComplete();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Assignment#getActualCost <em>Actual Cost</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Actual Cost</em>'.
* @see org.eclipse.epf.msproject.Assignment#getActualCost()
* @see #getAssignment()
* @generated
*/
EAttribute getAssignment_ActualCost();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Assignment#getActualFinish <em>Actual Finish</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Actual Finish</em>'.
* @see org.eclipse.epf.msproject.Assignment#getActualFinish()
* @see #getAssignment()
* @generated
*/
EAttribute getAssignment_ActualFinish();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Assignment#getActualOvertimeCost <em>Actual Overtime Cost</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Actual Overtime Cost</em>'.
* @see org.eclipse.epf.msproject.Assignment#getActualOvertimeCost()
* @see #getAssignment()
* @generated
*/
EAttribute getAssignment_ActualOvertimeCost();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Assignment#getActualOvertimeWork <em>Actual Overtime Work</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Actual Overtime Work</em>'.
* @see org.eclipse.epf.msproject.Assignment#getActualOvertimeWork()
* @see #getAssignment()
* @generated
*/
EAttribute getAssignment_ActualOvertimeWork();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Assignment#getActualStart <em>Actual Start</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Actual Start</em>'.
* @see org.eclipse.epf.msproject.Assignment#getActualStart()
* @see #getAssignment()
* @generated
*/
EAttribute getAssignment_ActualStart();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Assignment#getActualWork <em>Actual Work</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Actual Work</em>'.
* @see org.eclipse.epf.msproject.Assignment#getActualWork()
* @see #getAssignment()
* @generated
*/
EAttribute getAssignment_ActualWork();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Assignment#getACWP <em>ACWP</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>ACWP</em>'.
* @see org.eclipse.epf.msproject.Assignment#getACWP()
* @see #getAssignment()
* @generated
*/
EAttribute getAssignment_ACWP();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Assignment#isConfirmed <em>Confirmed</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Confirmed</em>'.
* @see org.eclipse.epf.msproject.Assignment#isConfirmed()
* @see #getAssignment()
* @generated
*/
EAttribute getAssignment_Confirmed();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Assignment#getCost <em>Cost</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Cost</em>'.
* @see org.eclipse.epf.msproject.Assignment#getCost()
* @see #getAssignment()
* @generated
*/
EAttribute getAssignment_Cost();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Assignment#getCostRateTable <em>Cost Rate Table</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Cost Rate Table</em>'.
* @see org.eclipse.epf.msproject.Assignment#getCostRateTable()
* @see #getAssignment()
* @generated
*/
EAttribute getAssignment_CostRateTable();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Assignment#getCostVariance <em>Cost Variance</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Cost Variance</em>'.
* @see org.eclipse.epf.msproject.Assignment#getCostVariance()
* @see #getAssignment()
* @generated
*/
EAttribute getAssignment_CostVariance();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Assignment#getCV <em>CV</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>CV</em>'.
* @see org.eclipse.epf.msproject.Assignment#getCV()
* @see #getAssignment()
* @generated
*/
EAttribute getAssignment_CV();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Assignment#getDelay <em>Delay</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Delay</em>'.
* @see org.eclipse.epf.msproject.Assignment#getDelay()
* @see #getAssignment()
* @generated
*/
EAttribute getAssignment_Delay();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Assignment#getFinish <em>Finish</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Finish</em>'.
* @see org.eclipse.epf.msproject.Assignment#getFinish()
* @see #getAssignment()
* @generated
*/
EAttribute getAssignment_Finish();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Assignment#getFinishVariance <em>Finish Variance</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Finish Variance</em>'.
* @see org.eclipse.epf.msproject.Assignment#getFinishVariance()
* @see #getAssignment()
* @generated
*/
EAttribute getAssignment_FinishVariance();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Assignment#getHyperlink <em>Hyperlink</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Hyperlink</em>'.
* @see org.eclipse.epf.msproject.Assignment#getHyperlink()
* @see #getAssignment()
* @generated
*/
EAttribute getAssignment_Hyperlink();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Assignment#getHyperlinkAddress <em>Hyperlink Address</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Hyperlink Address</em>'.
* @see org.eclipse.epf.msproject.Assignment#getHyperlinkAddress()
* @see #getAssignment()
* @generated
*/
EAttribute getAssignment_HyperlinkAddress();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Assignment#getHyperlinkSubAddress <em>Hyperlink Sub Address</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Hyperlink Sub Address</em>'.
* @see org.eclipse.epf.msproject.Assignment#getHyperlinkSubAddress()
* @see #getAssignment()
* @generated
*/
EAttribute getAssignment_HyperlinkSubAddress();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Assignment#getWorkVariance <em>Work Variance</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Work Variance</em>'.
* @see org.eclipse.epf.msproject.Assignment#getWorkVariance()
* @see #getAssignment()
* @generated
*/
EAttribute getAssignment_WorkVariance();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Assignment#isHasFixedRateUnits <em>Has Fixed Rate Units</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Has Fixed Rate Units</em>'.
* @see org.eclipse.epf.msproject.Assignment#isHasFixedRateUnits()
* @see #getAssignment()
* @generated
*/
EAttribute getAssignment_HasFixedRateUnits();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Assignment#isFixedMaterial <em>Fixed Material</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Fixed Material</em>'.
* @see org.eclipse.epf.msproject.Assignment#isFixedMaterial()
* @see #getAssignment()
* @generated
*/
EAttribute getAssignment_FixedMaterial();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Assignment#getLevelingDelay <em>Leveling Delay</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Leveling Delay</em>'.
* @see org.eclipse.epf.msproject.Assignment#getLevelingDelay()
* @see #getAssignment()
* @generated
*/
EAttribute getAssignment_LevelingDelay();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Assignment#getLevelingDelayFormat <em>Leveling Delay Format</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Leveling Delay Format</em>'.
* @see org.eclipse.epf.msproject.Assignment#getLevelingDelayFormat()
* @see #getAssignment()
* @generated
*/
EAttribute getAssignment_LevelingDelayFormat();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Assignment#isLinkedFields <em>Linked Fields</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Linked Fields</em>'.
* @see org.eclipse.epf.msproject.Assignment#isLinkedFields()
* @see #getAssignment()
* @generated
*/
EAttribute getAssignment_LinkedFields();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Assignment#isMilestone <em>Milestone</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Milestone</em>'.
* @see org.eclipse.epf.msproject.Assignment#isMilestone()
* @see #getAssignment()
* @generated
*/
EAttribute getAssignment_Milestone();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Assignment#getNotes <em>Notes</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Notes</em>'.
* @see org.eclipse.epf.msproject.Assignment#getNotes()
* @see #getAssignment()
* @generated
*/
EAttribute getAssignment_Notes();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Assignment#isOverallocated <em>Overallocated</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Overallocated</em>'.
* @see org.eclipse.epf.msproject.Assignment#isOverallocated()
* @see #getAssignment()
* @generated
*/
EAttribute getAssignment_Overallocated();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Assignment#getOvertimeCost <em>Overtime Cost</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Overtime Cost</em>'.
* @see org.eclipse.epf.msproject.Assignment#getOvertimeCost()
* @see #getAssignment()
* @generated
*/
EAttribute getAssignment_OvertimeCost();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Assignment#getOvertimeWork <em>Overtime Work</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Overtime Work</em>'.
* @see org.eclipse.epf.msproject.Assignment#getOvertimeWork()
* @see #getAssignment()
* @generated
*/
EAttribute getAssignment_OvertimeWork();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Assignment#getRegularWork <em>Regular Work</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Regular Work</em>'.
* @see org.eclipse.epf.msproject.Assignment#getRegularWork()
* @see #getAssignment()
* @generated
*/
EAttribute getAssignment_RegularWork();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Assignment#getRemainingCost <em>Remaining Cost</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Remaining Cost</em>'.
* @see org.eclipse.epf.msproject.Assignment#getRemainingCost()
* @see #getAssignment()
* @generated
*/
EAttribute getAssignment_RemainingCost();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Assignment#getRemainingOvertimeCost <em>Remaining Overtime Cost</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Remaining Overtime Cost</em>'.
* @see org.eclipse.epf.msproject.Assignment#getRemainingOvertimeCost()
* @see #getAssignment()
* @generated
*/
EAttribute getAssignment_RemainingOvertimeCost();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Assignment#getRemainingOvertimeWork <em>Remaining Overtime Work</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Remaining Overtime Work</em>'.
* @see org.eclipse.epf.msproject.Assignment#getRemainingOvertimeWork()
* @see #getAssignment()
* @generated
*/
EAttribute getAssignment_RemainingOvertimeWork();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Assignment#getRemainingWork <em>Remaining Work</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Remaining Work</em>'.
* @see org.eclipse.epf.msproject.Assignment#getRemainingWork()
* @see #getAssignment()
* @generated
*/
EAttribute getAssignment_RemainingWork();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Assignment#isResponsePending <em>Response Pending</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Response Pending</em>'.
* @see org.eclipse.epf.msproject.Assignment#isResponsePending()
* @see #getAssignment()
* @generated
*/
EAttribute getAssignment_ResponsePending();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Assignment#getStart <em>Start</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Start</em>'.
* @see org.eclipse.epf.msproject.Assignment#getStart()
* @see #getAssignment()
* @generated
*/
EAttribute getAssignment_Start();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Assignment#getStop <em>Stop</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Stop</em>'.
* @see org.eclipse.epf.msproject.Assignment#getStop()
* @see #getAssignment()
* @generated
*/
EAttribute getAssignment_Stop();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Assignment#getResume <em>Resume</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Resume</em>'.
* @see org.eclipse.epf.msproject.Assignment#getResume()
* @see #getAssignment()
* @generated
*/
EAttribute getAssignment_Resume();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Assignment#getStartVariance <em>Start Variance</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Start Variance</em>'.
* @see org.eclipse.epf.msproject.Assignment#getStartVariance()
* @see #getAssignment()
* @generated
*/
EAttribute getAssignment_StartVariance();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Assignment#getUnits <em>Units</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Units</em>'.
* @see org.eclipse.epf.msproject.Assignment#getUnits()
* @see #getAssignment()
* @generated
*/
EAttribute getAssignment_Units();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Assignment#isUpdateNeeded <em>Update Needed</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Update Needed</em>'.
* @see org.eclipse.epf.msproject.Assignment#isUpdateNeeded()
* @see #getAssignment()
* @generated
*/
EAttribute getAssignment_UpdateNeeded();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Assignment#getVAC <em>VAC</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>VAC</em>'.
* @see org.eclipse.epf.msproject.Assignment#getVAC()
* @see #getAssignment()
* @generated
*/
EAttribute getAssignment_VAC();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Assignment#getWork <em>Work</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Work</em>'.
* @see org.eclipse.epf.msproject.Assignment#getWork()
* @see #getAssignment()
* @generated
*/
EAttribute getAssignment_Work();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Assignment#getWorkContour <em>Work Contour</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Work Contour</em>'.
* @see org.eclipse.epf.msproject.Assignment#getWorkContour()
* @see #getAssignment()
* @generated
*/
EAttribute getAssignment_WorkContour();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Assignment#getBCWS <em>BCWS</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>BCWS</em>'.
* @see org.eclipse.epf.msproject.Assignment#getBCWS()
* @see #getAssignment()
* @generated
*/
EAttribute getAssignment_BCWS();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Assignment#getBCWP <em>BCWP</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>BCWP</em>'.
* @see org.eclipse.epf.msproject.Assignment#getBCWP()
* @see #getAssignment()
* @generated
*/
EAttribute getAssignment_BCWP();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Assignment#getBookingType <em>Booking Type</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Booking Type</em>'.
* @see org.eclipse.epf.msproject.Assignment#getBookingType()
* @see #getAssignment()
* @generated
*/
EAttribute getAssignment_BookingType();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Assignment#getActualWorkProtected <em>Actual Work Protected</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Actual Work Protected</em>'.
* @see org.eclipse.epf.msproject.Assignment#getActualWorkProtected()
* @see #getAssignment()
* @generated
*/
EAttribute getAssignment_ActualWorkProtected();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Assignment#getActualOvertimeWorkProtected <em>Actual Overtime Work Protected</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Actual Overtime Work Protected</em>'.
* @see org.eclipse.epf.msproject.Assignment#getActualOvertimeWorkProtected()
* @see #getAssignment()
* @generated
*/
EAttribute getAssignment_ActualOvertimeWorkProtected();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Assignment#getCreationDate <em>Creation Date</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Creation Date</em>'.
* @see org.eclipse.epf.msproject.Assignment#getCreationDate()
* @see #getAssignment()
* @generated
*/
EAttribute getAssignment_CreationDate();
/**
* Returns the meta object for the containment reference list '{@link org.eclipse.epf.msproject.Assignment#getExtendedAttribute <em>Extended Attribute</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the containment reference list '<em>Extended Attribute</em>'.
* @see org.eclipse.epf.msproject.Assignment#getExtendedAttribute()
* @see #getAssignment()
* @generated
*/
EReference getAssignment_ExtendedAttribute();
/**
* Returns the meta object for the containment reference list '{@link org.eclipse.epf.msproject.Assignment#getBaseline <em>Baseline</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the containment reference list '<em>Baseline</em>'.
* @see org.eclipse.epf.msproject.Assignment#getBaseline()
* @see #getAssignment()
* @generated
*/
EReference getAssignment_Baseline();
/**
* Returns the meta object for the containment reference list '{@link org.eclipse.epf.msproject.Assignment#getTimephasedData <em>Timephased Data</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the containment reference list '<em>Timephased Data</em>'.
* @see org.eclipse.epf.msproject.Assignment#getTimephasedData()
* @see #getAssignment()
* @generated
*/
EReference getAssignment_TimephasedData();
/**
* Returns the meta object for class '{@link org.eclipse.epf.msproject.Assignments <em>Assignments</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for class '<em>Assignments</em>'.
* @see org.eclipse.epf.msproject.Assignments
* @generated
*/
EClass getAssignments();
/**
* Returns the meta object for the containment reference list '{@link org.eclipse.epf.msproject.Assignments#getAssignment <em>Assignment</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the containment reference list '<em>Assignment</em>'.
* @see org.eclipse.epf.msproject.Assignments#getAssignment()
* @see #getAssignments()
* @generated
*/
EReference getAssignments_Assignment();
/**
* Returns the meta object for class '{@link org.eclipse.epf.msproject.AvailabilityPeriod <em>Availability Period</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for class '<em>Availability Period</em>'.
* @see org.eclipse.epf.msproject.AvailabilityPeriod
* @generated
*/
EClass getAvailabilityPeriod();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.AvailabilityPeriod#getAvailableFrom <em>Available From</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Available From</em>'.
* @see org.eclipse.epf.msproject.AvailabilityPeriod#getAvailableFrom()
* @see #getAvailabilityPeriod()
* @generated
*/
EAttribute getAvailabilityPeriod_AvailableFrom();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.AvailabilityPeriod#getAvailableTo <em>Available To</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Available To</em>'.
* @see org.eclipse.epf.msproject.AvailabilityPeriod#getAvailableTo()
* @see #getAvailabilityPeriod()
* @generated
*/
EAttribute getAvailabilityPeriod_AvailableTo();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.AvailabilityPeriod#getAvailableUnits <em>Available Units</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Available Units</em>'.
* @see org.eclipse.epf.msproject.AvailabilityPeriod#getAvailableUnits()
* @see #getAvailabilityPeriod()
* @generated
*/
EAttribute getAvailabilityPeriod_AvailableUnits();
/**
* Returns the meta object for class '{@link org.eclipse.epf.msproject.AvailabilityPeriods <em>Availability Periods</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for class '<em>Availability Periods</em>'.
* @see org.eclipse.epf.msproject.AvailabilityPeriods
* @generated
*/
EClass getAvailabilityPeriods();
/**
* Returns the meta object for the containment reference list '{@link org.eclipse.epf.msproject.AvailabilityPeriods#getAvailabilityPeriod <em>Availability Period</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the containment reference list '<em>Availability Period</em>'.
* @see org.eclipse.epf.msproject.AvailabilityPeriods#getAvailabilityPeriod()
* @see #getAvailabilityPeriods()
* @generated
*/
EReference getAvailabilityPeriods_AvailabilityPeriod();
/**
* Returns the meta object for class '{@link org.eclipse.epf.msproject.Baseline <em>Baseline</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for class '<em>Baseline</em>'.
* @see org.eclipse.epf.msproject.Baseline
* @generated
*/
EClass getBaseline();
/**
* Returns the meta object for the containment reference list '{@link org.eclipse.epf.msproject.Baseline#getTimephasedData <em>Timephased Data</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the containment reference list '<em>Timephased Data</em>'.
* @see org.eclipse.epf.msproject.Baseline#getTimephasedData()
* @see #getBaseline()
* @generated
*/
EReference getBaseline_TimephasedData();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Baseline#getNumber <em>Number</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Number</em>'.
* @see org.eclipse.epf.msproject.Baseline#getNumber()
* @see #getBaseline()
* @generated
*/
EAttribute getBaseline_Number();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Baseline#isInterim <em>Interim</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Interim</em>'.
* @see org.eclipse.epf.msproject.Baseline#isInterim()
* @see #getBaseline()
* @generated
*/
EAttribute getBaseline_Interim();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Baseline#getStart <em>Start</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Start</em>'.
* @see org.eclipse.epf.msproject.Baseline#getStart()
* @see #getBaseline()
* @generated
*/
EAttribute getBaseline_Start();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Baseline#getFinish <em>Finish</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Finish</em>'.
* @see org.eclipse.epf.msproject.Baseline#getFinish()
* @see #getBaseline()
* @generated
*/
EAttribute getBaseline_Finish();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Baseline#getDuration <em>Duration</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Duration</em>'.
* @see org.eclipse.epf.msproject.Baseline#getDuration()
* @see #getBaseline()
* @generated
*/
EAttribute getBaseline_Duration();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Baseline#getDurationFormat <em>Duration Format</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Duration Format</em>'.
* @see org.eclipse.epf.msproject.Baseline#getDurationFormat()
* @see #getBaseline()
* @generated
*/
EAttribute getBaseline_DurationFormat();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Baseline#isEstimatedDuration <em>Estimated Duration</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Estimated Duration</em>'.
* @see org.eclipse.epf.msproject.Baseline#isEstimatedDuration()
* @see #getBaseline()
* @generated
*/
EAttribute getBaseline_EstimatedDuration();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Baseline#getWork <em>Work</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Work</em>'.
* @see org.eclipse.epf.msproject.Baseline#getWork()
* @see #getBaseline()
* @generated
*/
EAttribute getBaseline_Work();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Baseline#getCost <em>Cost</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Cost</em>'.
* @see org.eclipse.epf.msproject.Baseline#getCost()
* @see #getBaseline()
* @generated
*/
EAttribute getBaseline_Cost();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Baseline#getBCWS <em>BCWS</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>BCWS</em>'.
* @see org.eclipse.epf.msproject.Baseline#getBCWS()
* @see #getBaseline()
* @generated
*/
EAttribute getBaseline_BCWS();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Baseline#getBCWP <em>BCWP</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>BCWP</em>'.
* @see org.eclipse.epf.msproject.Baseline#getBCWP()
* @see #getBaseline()
* @generated
*/
EAttribute getBaseline_BCWP();
/**
* Returns the meta object for class '{@link org.eclipse.epf.msproject.Baseline2 <em>Baseline2</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for class '<em>Baseline2</em>'.
* @see org.eclipse.epf.msproject.Baseline2
* @generated
*/
EClass getBaseline2();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Baseline2#getNumber <em>Number</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Number</em>'.
* @see org.eclipse.epf.msproject.Baseline2#getNumber()
* @see #getBaseline2()
* @generated
*/
EAttribute getBaseline2_Number();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Baseline2#getWork <em>Work</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Work</em>'.
* @see org.eclipse.epf.msproject.Baseline2#getWork()
* @see #getBaseline2()
* @generated
*/
EAttribute getBaseline2_Work();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Baseline2#getCost <em>Cost</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Cost</em>'.
* @see org.eclipse.epf.msproject.Baseline2#getCost()
* @see #getBaseline2()
* @generated
*/
EAttribute getBaseline2_Cost();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Baseline2#getBCWS <em>BCWS</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>BCWS</em>'.
* @see org.eclipse.epf.msproject.Baseline2#getBCWS()
* @see #getBaseline2()
* @generated
*/
EAttribute getBaseline2_BCWS();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Baseline2#getBCWP <em>BCWP</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>BCWP</em>'.
* @see org.eclipse.epf.msproject.Baseline2#getBCWP()
* @see #getBaseline2()
* @generated
*/
EAttribute getBaseline2_BCWP();
/**
* Returns the meta object for class '{@link org.eclipse.epf.msproject.Baseline3 <em>Baseline3</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for class '<em>Baseline3</em>'.
* @see org.eclipse.epf.msproject.Baseline3
* @generated
*/
EClass getBaseline3();
/**
* Returns the meta object for the containment reference list '{@link org.eclipse.epf.msproject.Baseline3#getTimephasedData <em>Timephased Data</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the containment reference list '<em>Timephased Data</em>'.
* @see org.eclipse.epf.msproject.Baseline3#getTimephasedData()
* @see #getBaseline3()
* @generated
*/
EReference getBaseline3_TimephasedData();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Baseline3#getNumber <em>Number</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Number</em>'.
* @see org.eclipse.epf.msproject.Baseline3#getNumber()
* @see #getBaseline3()
* @generated
*/
EAttribute getBaseline3_Number();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Baseline3#getStart <em>Start</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Start</em>'.
* @see org.eclipse.epf.msproject.Baseline3#getStart()
* @see #getBaseline3()
* @generated
*/
EAttribute getBaseline3_Start();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Baseline3#getFinish <em>Finish</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Finish</em>'.
* @see org.eclipse.epf.msproject.Baseline3#getFinish()
* @see #getBaseline3()
* @generated
*/
EAttribute getBaseline3_Finish();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Baseline3#getWork <em>Work</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Work</em>'.
* @see org.eclipse.epf.msproject.Baseline3#getWork()
* @see #getBaseline3()
* @generated
*/
EAttribute getBaseline3_Work();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Baseline3#getCost <em>Cost</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Cost</em>'.
* @see org.eclipse.epf.msproject.Baseline3#getCost()
* @see #getBaseline3()
* @generated
*/
EAttribute getBaseline3_Cost();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Baseline3#getBCWS <em>BCWS</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>BCWS</em>'.
* @see org.eclipse.epf.msproject.Baseline3#getBCWS()
* @see #getBaseline3()
* @generated
*/
EAttribute getBaseline3_BCWS();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Baseline3#getBCWP <em>BCWP</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>BCWP</em>'.
* @see org.eclipse.epf.msproject.Baseline3#getBCWP()
* @see #getBaseline3()
* @generated
*/
EAttribute getBaseline3_BCWP();
/**
* Returns the meta object for class '{@link org.eclipse.epf.msproject.Calendar <em>Calendar</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for class '<em>Calendar</em>'.
* @see org.eclipse.epf.msproject.Calendar
* @generated
*/
EClass getCalendar();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Calendar#getUID <em>UID</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>UID</em>'.
* @see org.eclipse.epf.msproject.Calendar#getUID()
* @see #getCalendar()
* @generated
*/
EAttribute getCalendar_UID();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Calendar#getName <em>Name</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Name</em>'.
* @see org.eclipse.epf.msproject.Calendar#getName()
* @see #getCalendar()
* @generated
*/
EAttribute getCalendar_Name();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Calendar#isIsBaseCalendar <em>Is Base Calendar</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Is Base Calendar</em>'.
* @see org.eclipse.epf.msproject.Calendar#isIsBaseCalendar()
* @see #getCalendar()
* @generated
*/
EAttribute getCalendar_IsBaseCalendar();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Calendar#getBaseCalendarUID <em>Base Calendar UID</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Base Calendar UID</em>'.
* @see org.eclipse.epf.msproject.Calendar#getBaseCalendarUID()
* @see #getCalendar()
* @generated
*/
EAttribute getCalendar_BaseCalendarUID();
/**
* Returns the meta object for the containment reference '{@link org.eclipse.epf.msproject.Calendar#getWeekDays <em>Week Days</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the containment reference '<em>Week Days</em>'.
* @see org.eclipse.epf.msproject.Calendar#getWeekDays()
* @see #getCalendar()
* @generated
*/
EReference getCalendar_WeekDays();
/**
* Returns the meta object for class '{@link org.eclipse.epf.msproject.Calendars <em>Calendars</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for class '<em>Calendars</em>'.
* @see org.eclipse.epf.msproject.Calendars
* @generated
*/
EClass getCalendars();
/**
* Returns the meta object for the containment reference list '{@link org.eclipse.epf.msproject.Calendars#getCalendar <em>Calendar</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the containment reference list '<em>Calendar</em>'.
* @see org.eclipse.epf.msproject.Calendars#getCalendar()
* @see #getCalendars()
* @generated
*/
EReference getCalendars_Calendar();
/**
* Returns the meta object for class '{@link org.eclipse.epf.msproject.DocumentRoot <em>Document Root</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for class '<em>Document Root</em>'.
* @see org.eclipse.epf.msproject.DocumentRoot
* @generated
*/
EClass getDocumentRoot();
/**
* Returns the meta object for the attribute list '{@link org.eclipse.epf.msproject.DocumentRoot#getMixed <em>Mixed</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute list '<em>Mixed</em>'.
* @see org.eclipse.epf.msproject.DocumentRoot#getMixed()
* @see #getDocumentRoot()
* @generated
*/
EAttribute getDocumentRoot_Mixed();
/**
* Returns the meta object for the map '{@link org.eclipse.epf.msproject.DocumentRoot#getXMLNSPrefixMap <em>XMLNS Prefix Map</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the map '<em>XMLNS Prefix Map</em>'.
* @see org.eclipse.epf.msproject.DocumentRoot#getXMLNSPrefixMap()
* @see #getDocumentRoot()
* @generated
*/
EReference getDocumentRoot_XMLNSPrefixMap();
/**
* Returns the meta object for the map '{@link org.eclipse.epf.msproject.DocumentRoot#getXSISchemaLocation <em>XSI Schema Location</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the map '<em>XSI Schema Location</em>'.
* @see org.eclipse.epf.msproject.DocumentRoot#getXSISchemaLocation()
* @see #getDocumentRoot()
* @generated
*/
EReference getDocumentRoot_XSISchemaLocation();
/**
* Returns the meta object for the containment reference '{@link org.eclipse.epf.msproject.DocumentRoot#getProject <em>Project</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the containment reference '<em>Project</em>'.
* @see org.eclipse.epf.msproject.DocumentRoot#getProject()
* @see #getDocumentRoot()
* @generated
*/
EReference getDocumentRoot_Project();
/**
* Returns the meta object for class '{@link org.eclipse.epf.msproject.ExtendedAttribute <em>Extended Attribute</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for class '<em>Extended Attribute</em>'.
* @see org.eclipse.epf.msproject.ExtendedAttribute
* @generated
*/
EClass getExtendedAttribute();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.ExtendedAttribute#getFieldID <em>Field ID</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Field ID</em>'.
* @see org.eclipse.epf.msproject.ExtendedAttribute#getFieldID()
* @see #getExtendedAttribute()
* @generated
*/
EAttribute getExtendedAttribute_FieldID();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.ExtendedAttribute#getFieldName <em>Field Name</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Field Name</em>'.
* @see org.eclipse.epf.msproject.ExtendedAttribute#getFieldName()
* @see #getExtendedAttribute()
* @generated
*/
EAttribute getExtendedAttribute_FieldName();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.ExtendedAttribute#getAlias <em>Alias</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Alias</em>'.
* @see org.eclipse.epf.msproject.ExtendedAttribute#getAlias()
* @see #getExtendedAttribute()
* @generated
*/
EAttribute getExtendedAttribute_Alias();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.ExtendedAttribute#getPhoneticAlias <em>Phonetic Alias</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Phonetic Alias</em>'.
* @see org.eclipse.epf.msproject.ExtendedAttribute#getPhoneticAlias()
* @see #getExtendedAttribute()
* @generated
*/
EAttribute getExtendedAttribute_PhoneticAlias();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.ExtendedAttribute#getRollupType <em>Rollup Type</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Rollup Type</em>'.
* @see org.eclipse.epf.msproject.ExtendedAttribute#getRollupType()
* @see #getExtendedAttribute()
* @generated
*/
EAttribute getExtendedAttribute_RollupType();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.ExtendedAttribute#getCalculationType <em>Calculation Type</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Calculation Type</em>'.
* @see org.eclipse.epf.msproject.ExtendedAttribute#getCalculationType()
* @see #getExtendedAttribute()
* @generated
*/
EAttribute getExtendedAttribute_CalculationType();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.ExtendedAttribute#getFormula <em>Formula</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Formula</em>'.
* @see org.eclipse.epf.msproject.ExtendedAttribute#getFormula()
* @see #getExtendedAttribute()
* @generated
*/
EAttribute getExtendedAttribute_Formula();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.ExtendedAttribute#isRestrictValues <em>Restrict Values</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Restrict Values</em>'.
* @see org.eclipse.epf.msproject.ExtendedAttribute#isRestrictValues()
* @see #getExtendedAttribute()
* @generated
*/
EAttribute getExtendedAttribute_RestrictValues();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.ExtendedAttribute#getValuelistSortOrder <em>Valuelist Sort Order</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Valuelist Sort Order</em>'.
* @see org.eclipse.epf.msproject.ExtendedAttribute#getValuelistSortOrder()
* @see #getExtendedAttribute()
* @generated
*/
EAttribute getExtendedAttribute_ValuelistSortOrder();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.ExtendedAttribute#isAppendNewValues <em>Append New Values</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Append New Values</em>'.
* @see org.eclipse.epf.msproject.ExtendedAttribute#isAppendNewValues()
* @see #getExtendedAttribute()
* @generated
*/
EAttribute getExtendedAttribute_AppendNewValues();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.ExtendedAttribute#getDefault <em>Default</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Default</em>'.
* @see org.eclipse.epf.msproject.ExtendedAttribute#getDefault()
* @see #getExtendedAttribute()
* @generated
*/
EAttribute getExtendedAttribute_Default();
/**
* Returns the meta object for the containment reference '{@link org.eclipse.epf.msproject.ExtendedAttribute#getValueList <em>Value List</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the containment reference '<em>Value List</em>'.
* @see org.eclipse.epf.msproject.ExtendedAttribute#getValueList()
* @see #getExtendedAttribute()
* @generated
*/
EReference getExtendedAttribute_ValueList();
/**
* Returns the meta object for class '{@link org.eclipse.epf.msproject.ExtendedAttribute2 <em>Extended Attribute2</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for class '<em>Extended Attribute2</em>'.
* @see org.eclipse.epf.msproject.ExtendedAttribute2
* @generated
*/
EClass getExtendedAttribute2();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.ExtendedAttribute2#getUID <em>UID</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>UID</em>'.
* @see org.eclipse.epf.msproject.ExtendedAttribute2#getUID()
* @see #getExtendedAttribute2()
* @generated
*/
EAttribute getExtendedAttribute2_UID();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.ExtendedAttribute2#getFieldID <em>Field ID</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Field ID</em>'.
* @see org.eclipse.epf.msproject.ExtendedAttribute2#getFieldID()
* @see #getExtendedAttribute2()
* @generated
*/
EAttribute getExtendedAttribute2_FieldID();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.ExtendedAttribute2#getValue <em>Value</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Value</em>'.
* @see org.eclipse.epf.msproject.ExtendedAttribute2#getValue()
* @see #getExtendedAttribute2()
* @generated
*/
EAttribute getExtendedAttribute2_Value();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.ExtendedAttribute2#getValueID <em>Value ID</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Value ID</em>'.
* @see org.eclipse.epf.msproject.ExtendedAttribute2#getValueID()
* @see #getExtendedAttribute2()
* @generated
*/
EAttribute getExtendedAttribute2_ValueID();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.ExtendedAttribute2#getDurationFormat <em>Duration Format</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Duration Format</em>'.
* @see org.eclipse.epf.msproject.ExtendedAttribute2#getDurationFormat()
* @see #getExtendedAttribute2()
* @generated
*/
EAttribute getExtendedAttribute2_DurationFormat();
/**
* Returns the meta object for class '{@link org.eclipse.epf.msproject.ExtendedAttribute3 <em>Extended Attribute3</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for class '<em>Extended Attribute3</em>'.
* @see org.eclipse.epf.msproject.ExtendedAttribute3
* @generated
*/
EClass getExtendedAttribute3();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.ExtendedAttribute3#getUID <em>UID</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>UID</em>'.
* @see org.eclipse.epf.msproject.ExtendedAttribute3#getUID()
* @see #getExtendedAttribute3()
* @generated
*/
EAttribute getExtendedAttribute3_UID();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.ExtendedAttribute3#getFieldID <em>Field ID</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Field ID</em>'.
* @see org.eclipse.epf.msproject.ExtendedAttribute3#getFieldID()
* @see #getExtendedAttribute3()
* @generated
*/
EAttribute getExtendedAttribute3_FieldID();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.ExtendedAttribute3#getValue <em>Value</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Value</em>'.
* @see org.eclipse.epf.msproject.ExtendedAttribute3#getValue()
* @see #getExtendedAttribute3()
* @generated
*/
EAttribute getExtendedAttribute3_Value();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.ExtendedAttribute3#getValueID <em>Value ID</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Value ID</em>'.
* @see org.eclipse.epf.msproject.ExtendedAttribute3#getValueID()
* @see #getExtendedAttribute3()
* @generated
*/
EAttribute getExtendedAttribute3_ValueID();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.ExtendedAttribute3#getDurationFormat <em>Duration Format</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Duration Format</em>'.
* @see org.eclipse.epf.msproject.ExtendedAttribute3#getDurationFormat()
* @see #getExtendedAttribute3()
* @generated
*/
EAttribute getExtendedAttribute3_DurationFormat();
/**
* Returns the meta object for class '{@link org.eclipse.epf.msproject.ExtendedAttribute4 <em>Extended Attribute4</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for class '<em>Extended Attribute4</em>'.
* @see org.eclipse.epf.msproject.ExtendedAttribute4
* @generated
*/
EClass getExtendedAttribute4();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.ExtendedAttribute4#getUID <em>UID</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>UID</em>'.
* @see org.eclipse.epf.msproject.ExtendedAttribute4#getUID()
* @see #getExtendedAttribute4()
* @generated
*/
EAttribute getExtendedAttribute4_UID();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.ExtendedAttribute4#getFieldID <em>Field ID</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Field ID</em>'.
* @see org.eclipse.epf.msproject.ExtendedAttribute4#getFieldID()
* @see #getExtendedAttribute4()
* @generated
*/
EAttribute getExtendedAttribute4_FieldID();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.ExtendedAttribute4#getValue <em>Value</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Value</em>'.
* @see org.eclipse.epf.msproject.ExtendedAttribute4#getValue()
* @see #getExtendedAttribute4()
* @generated
*/
EAttribute getExtendedAttribute4_Value();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.ExtendedAttribute4#getValueID <em>Value ID</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Value ID</em>'.
* @see org.eclipse.epf.msproject.ExtendedAttribute4#getValueID()
* @see #getExtendedAttribute4()
* @generated
*/
EAttribute getExtendedAttribute4_ValueID();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.ExtendedAttribute4#getDurationFormat <em>Duration Format</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Duration Format</em>'.
* @see org.eclipse.epf.msproject.ExtendedAttribute4#getDurationFormat()
* @see #getExtendedAttribute4()
* @generated
*/
EAttribute getExtendedAttribute4_DurationFormat();
/**
* Returns the meta object for class '{@link org.eclipse.epf.msproject.ExtendedAttributes <em>Extended Attributes</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for class '<em>Extended Attributes</em>'.
* @see org.eclipse.epf.msproject.ExtendedAttributes
* @generated
*/
EClass getExtendedAttributes();
/**
* Returns the meta object for the containment reference list '{@link org.eclipse.epf.msproject.ExtendedAttributes#getExtendedAttribute <em>Extended Attribute</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the containment reference list '<em>Extended Attribute</em>'.
* @see org.eclipse.epf.msproject.ExtendedAttributes#getExtendedAttribute()
* @see #getExtendedAttributes()
* @generated
*/
EReference getExtendedAttributes_ExtendedAttribute();
/**
* Returns the meta object for class '{@link org.eclipse.epf.msproject.Mask <em>Mask</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for class '<em>Mask</em>'.
* @see org.eclipse.epf.msproject.Mask
* @generated
*/
EClass getMask();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Mask#getLevel <em>Level</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Level</em>'.
* @see org.eclipse.epf.msproject.Mask#getLevel()
* @see #getMask()
* @generated
*/
EAttribute getMask_Level();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Mask#getType <em>Type</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Type</em>'.
* @see org.eclipse.epf.msproject.Mask#getType()
* @see #getMask()
* @generated
*/
EAttribute getMask_Type();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Mask#getLength <em>Length</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Length</em>'.
* @see org.eclipse.epf.msproject.Mask#getLength()
* @see #getMask()
* @generated
*/
EAttribute getMask_Length();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Mask#getSeparator <em>Separator</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Separator</em>'.
* @see org.eclipse.epf.msproject.Mask#getSeparator()
* @see #getMask()
* @generated
*/
EAttribute getMask_Separator();
/**
* Returns the meta object for class '{@link org.eclipse.epf.msproject.Masks <em>Masks</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for class '<em>Masks</em>'.
* @see org.eclipse.epf.msproject.Masks
* @generated
*/
EClass getMasks();
/**
* Returns the meta object for the containment reference list '{@link org.eclipse.epf.msproject.Masks#getMask <em>Mask</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the containment reference list '<em>Mask</em>'.
* @see org.eclipse.epf.msproject.Masks#getMask()
* @see #getMasks()
* @generated
*/
EReference getMasks_Mask();
/**
* Returns the meta object for class '{@link org.eclipse.epf.msproject.OutlineCode <em>Outline Code</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for class '<em>Outline Code</em>'.
* @see org.eclipse.epf.msproject.OutlineCode
* @generated
*/
EClass getOutlineCode();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.OutlineCode#getFieldID <em>Field ID</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Field ID</em>'.
* @see org.eclipse.epf.msproject.OutlineCode#getFieldID()
* @see #getOutlineCode()
* @generated
*/
EAttribute getOutlineCode_FieldID();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.OutlineCode#getFieldName <em>Field Name</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Field Name</em>'.
* @see org.eclipse.epf.msproject.OutlineCode#getFieldName()
* @see #getOutlineCode()
* @generated
*/
EAttribute getOutlineCode_FieldName();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.OutlineCode#getAlias <em>Alias</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Alias</em>'.
* @see org.eclipse.epf.msproject.OutlineCode#getAlias()
* @see #getOutlineCode()
* @generated
*/
EAttribute getOutlineCode_Alias();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.OutlineCode#getPhoneticAlias <em>Phonetic Alias</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Phonetic Alias</em>'.
* @see org.eclipse.epf.msproject.OutlineCode#getPhoneticAlias()
* @see #getOutlineCode()
* @generated
*/
EAttribute getOutlineCode_PhoneticAlias();
/**
* Returns the meta object for the containment reference '{@link org.eclipse.epf.msproject.OutlineCode#getValues <em>Values</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the containment reference '<em>Values</em>'.
* @see org.eclipse.epf.msproject.OutlineCode#getValues()
* @see #getOutlineCode()
* @generated
*/
EReference getOutlineCode_Values();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.OutlineCode#isEnterprise <em>Enterprise</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Enterprise</em>'.
* @see org.eclipse.epf.msproject.OutlineCode#isEnterprise()
* @see #getOutlineCode()
* @generated
*/
EAttribute getOutlineCode_Enterprise();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.OutlineCode#getEnterpriseOutlineCodeAlias <em>Enterprise Outline Code Alias</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Enterprise Outline Code Alias</em>'.
* @see org.eclipse.epf.msproject.OutlineCode#getEnterpriseOutlineCodeAlias()
* @see #getOutlineCode()
* @generated
*/
EAttribute getOutlineCode_EnterpriseOutlineCodeAlias();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.OutlineCode#isResourceSubstitutionEnabled <em>Resource Substitution Enabled</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Resource Substitution Enabled</em>'.
* @see org.eclipse.epf.msproject.OutlineCode#isResourceSubstitutionEnabled()
* @see #getOutlineCode()
* @generated
*/
EAttribute getOutlineCode_ResourceSubstitutionEnabled();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.OutlineCode#isLeafOnly <em>Leaf Only</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Leaf Only</em>'.
* @see org.eclipse.epf.msproject.OutlineCode#isLeafOnly()
* @see #getOutlineCode()
* @generated
*/
EAttribute getOutlineCode_LeafOnly();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.OutlineCode#isAllLevelsRequired <em>All Levels Required</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>All Levels Required</em>'.
* @see org.eclipse.epf.msproject.OutlineCode#isAllLevelsRequired()
* @see #getOutlineCode()
* @generated
*/
EAttribute getOutlineCode_AllLevelsRequired();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.OutlineCode#isOnlyTableValuesAllowed <em>Only Table Values Allowed</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Only Table Values Allowed</em>'.
* @see org.eclipse.epf.msproject.OutlineCode#isOnlyTableValuesAllowed()
* @see #getOutlineCode()
* @generated
*/
EAttribute getOutlineCode_OnlyTableValuesAllowed();
/**
* Returns the meta object for the containment reference '{@link org.eclipse.epf.msproject.OutlineCode#getMasks <em>Masks</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the containment reference '<em>Masks</em>'.
* @see org.eclipse.epf.msproject.OutlineCode#getMasks()
* @see #getOutlineCode()
* @generated
*/
EReference getOutlineCode_Masks();
/**
* Returns the meta object for class '{@link org.eclipse.epf.msproject.OutlineCode2 <em>Outline Code2</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for class '<em>Outline Code2</em>'.
* @see org.eclipse.epf.msproject.OutlineCode2
* @generated
*/
EClass getOutlineCode2();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.OutlineCode2#getUID <em>UID</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>UID</em>'.
* @see org.eclipse.epf.msproject.OutlineCode2#getUID()
* @see #getOutlineCode2()
* @generated
*/
EAttribute getOutlineCode2_UID();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.OutlineCode2#getFieldID <em>Field ID</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Field ID</em>'.
* @see org.eclipse.epf.msproject.OutlineCode2#getFieldID()
* @see #getOutlineCode2()
* @generated
*/
EAttribute getOutlineCode2_FieldID();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.OutlineCode2#getValueID <em>Value ID</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Value ID</em>'.
* @see org.eclipse.epf.msproject.OutlineCode2#getValueID()
* @see #getOutlineCode2()
* @generated
*/
EAttribute getOutlineCode2_ValueID();
/**
* Returns the meta object for class '{@link org.eclipse.epf.msproject.OutlineCode3 <em>Outline Code3</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for class '<em>Outline Code3</em>'.
* @see org.eclipse.epf.msproject.OutlineCode3
* @generated
*/
EClass getOutlineCode3();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.OutlineCode3#getUID <em>UID</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>UID</em>'.
* @see org.eclipse.epf.msproject.OutlineCode3#getUID()
* @see #getOutlineCode3()
* @generated
*/
EAttribute getOutlineCode3_UID();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.OutlineCode3#getFieldID <em>Field ID</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Field ID</em>'.
* @see org.eclipse.epf.msproject.OutlineCode3#getFieldID()
* @see #getOutlineCode3()
* @generated
*/
EAttribute getOutlineCode3_FieldID();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.OutlineCode3#getValueID <em>Value ID</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Value ID</em>'.
* @see org.eclipse.epf.msproject.OutlineCode3#getValueID()
* @see #getOutlineCode3()
* @generated
*/
EAttribute getOutlineCode3_ValueID();
/**
* Returns the meta object for class '{@link org.eclipse.epf.msproject.OutlineCodes <em>Outline Codes</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for class '<em>Outline Codes</em>'.
* @see org.eclipse.epf.msproject.OutlineCodes
* @generated
*/
EClass getOutlineCodes();
/**
* Returns the meta object for the containment reference list '{@link org.eclipse.epf.msproject.OutlineCodes#getOutlineCode <em>Outline Code</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the containment reference list '<em>Outline Code</em>'.
* @see org.eclipse.epf.msproject.OutlineCodes#getOutlineCode()
* @see #getOutlineCodes()
* @generated
*/
EReference getOutlineCodes_OutlineCode();
/**
* Returns the meta object for class '{@link org.eclipse.epf.msproject.PredecessorLink <em>Predecessor Link</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for class '<em>Predecessor Link</em>'.
* @see org.eclipse.epf.msproject.PredecessorLink
* @generated
*/
EClass getPredecessorLink();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.PredecessorLink#getPredecessorUID <em>Predecessor UID</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Predecessor UID</em>'.
* @see org.eclipse.epf.msproject.PredecessorLink#getPredecessorUID()
* @see #getPredecessorLink()
* @generated
*/
EAttribute getPredecessorLink_PredecessorUID();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.PredecessorLink#getType <em>Type</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Type</em>'.
* @see org.eclipse.epf.msproject.PredecessorLink#getType()
* @see #getPredecessorLink()
* @generated
*/
EAttribute getPredecessorLink_Type();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.PredecessorLink#isCrossProject <em>Cross Project</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Cross Project</em>'.
* @see org.eclipse.epf.msproject.PredecessorLink#isCrossProject()
* @see #getPredecessorLink()
* @generated
*/
EAttribute getPredecessorLink_CrossProject();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.PredecessorLink#getCrossProjectName <em>Cross Project Name</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Cross Project Name</em>'.
* @see org.eclipse.epf.msproject.PredecessorLink#getCrossProjectName()
* @see #getPredecessorLink()
* @generated
*/
EAttribute getPredecessorLink_CrossProjectName();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.PredecessorLink#getLinkLag <em>Link Lag</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Link Lag</em>'.
* @see org.eclipse.epf.msproject.PredecessorLink#getLinkLag()
* @see #getPredecessorLink()
* @generated
*/
EAttribute getPredecessorLink_LinkLag();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.PredecessorLink#getLagFormat <em>Lag Format</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Lag Format</em>'.
* @see org.eclipse.epf.msproject.PredecessorLink#getLagFormat()
* @see #getPredecessorLink()
* @generated
*/
EAttribute getPredecessorLink_LagFormat();
/**
* Returns the meta object for class '{@link org.eclipse.epf.msproject.Project <em>Project</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for class '<em>Project</em>'.
* @see org.eclipse.epf.msproject.Project
* @generated
*/
EClass getProject();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Project#getUID <em>UID</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>UID</em>'.
* @see org.eclipse.epf.msproject.Project#getUID()
* @see #getProject()
* @generated
*/
EAttribute getProject_UID();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Project#getName <em>Name</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Name</em>'.
* @see org.eclipse.epf.msproject.Project#getName()
* @see #getProject()
* @generated
*/
EAttribute getProject_Name();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Project#getTitle <em>Title</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Title</em>'.
* @see org.eclipse.epf.msproject.Project#getTitle()
* @see #getProject()
* @generated
*/
EAttribute getProject_Title();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Project#getSubject <em>Subject</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Subject</em>'.
* @see org.eclipse.epf.msproject.Project#getSubject()
* @see #getProject()
* @generated
*/
EAttribute getProject_Subject();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Project#getCategory <em>Category</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Category</em>'.
* @see org.eclipse.epf.msproject.Project#getCategory()
* @see #getProject()
* @generated
*/
EAttribute getProject_Category();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Project#getCompany <em>Company</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Company</em>'.
* @see org.eclipse.epf.msproject.Project#getCompany()
* @see #getProject()
* @generated
*/
EAttribute getProject_Company();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Project#getManager <em>Manager</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Manager</em>'.
* @see org.eclipse.epf.msproject.Project#getManager()
* @see #getProject()
* @generated
*/
EAttribute getProject_Manager();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Project#getAuthor <em>Author</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Author</em>'.
* @see org.eclipse.epf.msproject.Project#getAuthor()
* @see #getProject()
* @generated
*/
EAttribute getProject_Author();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Project#getCreationDate <em>Creation Date</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Creation Date</em>'.
* @see org.eclipse.epf.msproject.Project#getCreationDate()
* @see #getProject()
* @generated
*/
EAttribute getProject_CreationDate();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Project#getRevision <em>Revision</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Revision</em>'.
* @see org.eclipse.epf.msproject.Project#getRevision()
* @see #getProject()
* @generated
*/
EAttribute getProject_Revision();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Project#getLastSaved <em>Last Saved</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Last Saved</em>'.
* @see org.eclipse.epf.msproject.Project#getLastSaved()
* @see #getProject()
* @generated
*/
EAttribute getProject_LastSaved();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Project#isScheduleFromStart <em>Schedule From Start</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Schedule From Start</em>'.
* @see org.eclipse.epf.msproject.Project#isScheduleFromStart()
* @see #getProject()
* @generated
*/
EAttribute getProject_ScheduleFromStart();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Project#getStartDate <em>Start Date</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Start Date</em>'.
* @see org.eclipse.epf.msproject.Project#getStartDate()
* @see #getProject()
* @generated
*/
EAttribute getProject_StartDate();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Project#getFinishDate <em>Finish Date</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Finish Date</em>'.
* @see org.eclipse.epf.msproject.Project#getFinishDate()
* @see #getProject()
* @generated
*/
EAttribute getProject_FinishDate();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Project#getFYStartDate <em>FY Start Date</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>FY Start Date</em>'.
* @see org.eclipse.epf.msproject.Project#getFYStartDate()
* @see #getProject()
* @generated
*/
EAttribute getProject_FYStartDate();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Project#getCriticalSlackLimit <em>Critical Slack Limit</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Critical Slack Limit</em>'.
* @see org.eclipse.epf.msproject.Project#getCriticalSlackLimit()
* @see #getProject()
* @generated
*/
EAttribute getProject_CriticalSlackLimit();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Project#getCurrencyDigits <em>Currency Digits</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Currency Digits</em>'.
* @see org.eclipse.epf.msproject.Project#getCurrencyDigits()
* @see #getProject()
* @generated
*/
EAttribute getProject_CurrencyDigits();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Project#getCurrencySymbol <em>Currency Symbol</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Currency Symbol</em>'.
* @see org.eclipse.epf.msproject.Project#getCurrencySymbol()
* @see #getProject()
* @generated
*/
EAttribute getProject_CurrencySymbol();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Project#getCurrencySymbolPosition <em>Currency Symbol Position</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Currency Symbol Position</em>'.
* @see org.eclipse.epf.msproject.Project#getCurrencySymbolPosition()
* @see #getProject()
* @generated
*/
EAttribute getProject_CurrencySymbolPosition();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Project#getCalendarUID <em>Calendar UID</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Calendar UID</em>'.
* @see org.eclipse.epf.msproject.Project#getCalendarUID()
* @see #getProject()
* @generated
*/
EAttribute getProject_CalendarUID();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Project#getDefaultStartTime <em>Default Start Time</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Default Start Time</em>'.
* @see org.eclipse.epf.msproject.Project#getDefaultStartTime()
* @see #getProject()
* @generated
*/
EAttribute getProject_DefaultStartTime();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Project#getDefaultFinishTime <em>Default Finish Time</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Default Finish Time</em>'.
* @see org.eclipse.epf.msproject.Project#getDefaultFinishTime()
* @see #getProject()
* @generated
*/
EAttribute getProject_DefaultFinishTime();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Project#getMinutesPerDay <em>Minutes Per Day</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Minutes Per Day</em>'.
* @see org.eclipse.epf.msproject.Project#getMinutesPerDay()
* @see #getProject()
* @generated
*/
EAttribute getProject_MinutesPerDay();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Project#getMinutesPerWeek <em>Minutes Per Week</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Minutes Per Week</em>'.
* @see org.eclipse.epf.msproject.Project#getMinutesPerWeek()
* @see #getProject()
* @generated
*/
EAttribute getProject_MinutesPerWeek();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Project#getDaysPerMonth <em>Days Per Month</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Days Per Month</em>'.
* @see org.eclipse.epf.msproject.Project#getDaysPerMonth()
* @see #getProject()
* @generated
*/
EAttribute getProject_DaysPerMonth();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Project#getDefaultTaskType <em>Default Task Type</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Default Task Type</em>'.
* @see org.eclipse.epf.msproject.Project#getDefaultTaskType()
* @see #getProject()
* @generated
*/
EAttribute getProject_DefaultTaskType();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Project#getDefaultFixedCostAccrual <em>Default Fixed Cost Accrual</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Default Fixed Cost Accrual</em>'.
* @see org.eclipse.epf.msproject.Project#getDefaultFixedCostAccrual()
* @see #getProject()
* @generated
*/
EAttribute getProject_DefaultFixedCostAccrual();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Project#getDefaultStandardRate <em>Default Standard Rate</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Default Standard Rate</em>'.
* @see org.eclipse.epf.msproject.Project#getDefaultStandardRate()
* @see #getProject()
* @generated
*/
EAttribute getProject_DefaultStandardRate();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Project#getDefaultOvertimeRate <em>Default Overtime Rate</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Default Overtime Rate</em>'.
* @see org.eclipse.epf.msproject.Project#getDefaultOvertimeRate()
* @see #getProject()
* @generated
*/
EAttribute getProject_DefaultOvertimeRate();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Project#getDurationFormat <em>Duration Format</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Duration Format</em>'.
* @see org.eclipse.epf.msproject.Project#getDurationFormat()
* @see #getProject()
* @generated
*/
EAttribute getProject_DurationFormat();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Project#getWorkFormat <em>Work Format</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Work Format</em>'.
* @see org.eclipse.epf.msproject.Project#getWorkFormat()
* @see #getProject()
* @generated
*/
EAttribute getProject_WorkFormat();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Project#isEditableActualCosts <em>Editable Actual Costs</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Editable Actual Costs</em>'.
* @see org.eclipse.epf.msproject.Project#isEditableActualCosts()
* @see #getProject()
* @generated
*/
EAttribute getProject_EditableActualCosts();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Project#isHonorConstraints <em>Honor Constraints</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Honor Constraints</em>'.
* @see org.eclipse.epf.msproject.Project#isHonorConstraints()
* @see #getProject()
* @generated
*/
EAttribute getProject_HonorConstraints();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Project#getEarnedValueMethod <em>Earned Value Method</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Earned Value Method</em>'.
* @see org.eclipse.epf.msproject.Project#getEarnedValueMethod()
* @see #getProject()
* @generated
*/
EAttribute getProject_EarnedValueMethod();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Project#isInsertedProjectsLikeSummary <em>Inserted Projects Like Summary</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Inserted Projects Like Summary</em>'.
* @see org.eclipse.epf.msproject.Project#isInsertedProjectsLikeSummary()
* @see #getProject()
* @generated
*/
EAttribute getProject_InsertedProjectsLikeSummary();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Project#isMultipleCriticalPaths <em>Multiple Critical Paths</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Multiple Critical Paths</em>'.
* @see org.eclipse.epf.msproject.Project#isMultipleCriticalPaths()
* @see #getProject()
* @generated
*/
EAttribute getProject_MultipleCriticalPaths();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Project#isNewTasksEffortDriven <em>New Tasks Effort Driven</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>New Tasks Effort Driven</em>'.
* @see org.eclipse.epf.msproject.Project#isNewTasksEffortDriven()
* @see #getProject()
* @generated
*/
EAttribute getProject_NewTasksEffortDriven();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Project#isNewTasksEstimated <em>New Tasks Estimated</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>New Tasks Estimated</em>'.
* @see org.eclipse.epf.msproject.Project#isNewTasksEstimated()
* @see #getProject()
* @generated
*/
EAttribute getProject_NewTasksEstimated();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Project#isSplitsInProgressTasks <em>Splits In Progress Tasks</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Splits In Progress Tasks</em>'.
* @see org.eclipse.epf.msproject.Project#isSplitsInProgressTasks()
* @see #getProject()
* @generated
*/
EAttribute getProject_SplitsInProgressTasks();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Project#isSpreadActualCost <em>Spread Actual Cost</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Spread Actual Cost</em>'.
* @see org.eclipse.epf.msproject.Project#isSpreadActualCost()
* @see #getProject()
* @generated
*/
EAttribute getProject_SpreadActualCost();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Project#isSpreadPercentComplete <em>Spread Percent Complete</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Spread Percent Complete</em>'.
* @see org.eclipse.epf.msproject.Project#isSpreadPercentComplete()
* @see #getProject()
* @generated
*/
EAttribute getProject_SpreadPercentComplete();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Project#isTaskUpdatesResource <em>Task Updates Resource</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Task Updates Resource</em>'.
* @see org.eclipse.epf.msproject.Project#isTaskUpdatesResource()
* @see #getProject()
* @generated
*/
EAttribute getProject_TaskUpdatesResource();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Project#isFiscalYearStart <em>Fiscal Year Start</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Fiscal Year Start</em>'.
* @see org.eclipse.epf.msproject.Project#isFiscalYearStart()
* @see #getProject()
* @generated
*/
EAttribute getProject_FiscalYearStart();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Project#getWeekStartDay <em>Week Start Day</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Week Start Day</em>'.
* @see org.eclipse.epf.msproject.Project#getWeekStartDay()
* @see #getProject()
* @generated
*/
EAttribute getProject_WeekStartDay();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Project#isMoveCompletedEndsBack <em>Move Completed Ends Back</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Move Completed Ends Back</em>'.
* @see org.eclipse.epf.msproject.Project#isMoveCompletedEndsBack()
* @see #getProject()
* @generated
*/
EAttribute getProject_MoveCompletedEndsBack();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Project#isMoveRemainingStartsBack <em>Move Remaining Starts Back</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Move Remaining Starts Back</em>'.
* @see org.eclipse.epf.msproject.Project#isMoveRemainingStartsBack()
* @see #getProject()
* @generated
*/
EAttribute getProject_MoveRemainingStartsBack();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Project#isMoveRemainingStartsForward <em>Move Remaining Starts Forward</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Move Remaining Starts Forward</em>'.
* @see org.eclipse.epf.msproject.Project#isMoveRemainingStartsForward()
* @see #getProject()
* @generated
*/
EAttribute getProject_MoveRemainingStartsForward();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Project#isMoveCompletedEndsForward <em>Move Completed Ends Forward</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Move Completed Ends Forward</em>'.
* @see org.eclipse.epf.msproject.Project#isMoveCompletedEndsForward()
* @see #getProject()
* @generated
*/
EAttribute getProject_MoveCompletedEndsForward();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Project#getBaselineForEarnedValue <em>Baseline For Earned Value</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Baseline For Earned Value</em>'.
* @see org.eclipse.epf.msproject.Project#getBaselineForEarnedValue()
* @see #getProject()
* @generated
*/
EAttribute getProject_BaselineForEarnedValue();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Project#isAutoAddNewResourcesAndTasks <em>Auto Add New Resources And Tasks</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Auto Add New Resources And Tasks</em>'.
* @see org.eclipse.epf.msproject.Project#isAutoAddNewResourcesAndTasks()
* @see #getProject()
* @generated
*/
EAttribute getProject_AutoAddNewResourcesAndTasks();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Project#getStatusDate <em>Status Date</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Status Date</em>'.
* @see org.eclipse.epf.msproject.Project#getStatusDate()
* @see #getProject()
* @generated
*/
EAttribute getProject_StatusDate();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Project#getCurrentDate <em>Current Date</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Current Date</em>'.
* @see org.eclipse.epf.msproject.Project#getCurrentDate()
* @see #getProject()
* @generated
*/
EAttribute getProject_CurrentDate();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Project#isMicrosoftProjectServerURL <em>Microsoft Project Server URL</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Microsoft Project Server URL</em>'.
* @see org.eclipse.epf.msproject.Project#isMicrosoftProjectServerURL()
* @see #getProject()
* @generated
*/
EAttribute getProject_MicrosoftProjectServerURL();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Project#isAutolink <em>Autolink</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Autolink</em>'.
* @see org.eclipse.epf.msproject.Project#isAutolink()
* @see #getProject()
* @generated
*/
EAttribute getProject_Autolink();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Project#getNewTaskStartDate <em>New Task Start Date</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>New Task Start Date</em>'.
* @see org.eclipse.epf.msproject.Project#getNewTaskStartDate()
* @see #getProject()
* @generated
*/
EAttribute getProject_NewTaskStartDate();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Project#getDefaultTaskEVMethod <em>Default Task EV Method</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Default Task EV Method</em>'.
* @see org.eclipse.epf.msproject.Project#getDefaultTaskEVMethod()
* @see #getProject()
* @generated
*/
EAttribute getProject_DefaultTaskEVMethod();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Project#isProjectExternallyEdited <em>Project Externally Edited</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Project Externally Edited</em>'.
* @see org.eclipse.epf.msproject.Project#isProjectExternallyEdited()
* @see #getProject()
* @generated
*/
EAttribute getProject_ProjectExternallyEdited();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Project#getExtendedCreationDate <em>Extended Creation Date</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Extended Creation Date</em>'.
* @see org.eclipse.epf.msproject.Project#getExtendedCreationDate()
* @see #getProject()
* @generated
*/
EAttribute getProject_ExtendedCreationDate();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Project#isActualsInSync <em>Actuals In Sync</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Actuals In Sync</em>'.
* @see org.eclipse.epf.msproject.Project#isActualsInSync()
* @see #getProject()
* @generated
*/
EAttribute getProject_ActualsInSync();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Project#isRemoveFileProperties <em>Remove File Properties</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Remove File Properties</em>'.
* @see org.eclipse.epf.msproject.Project#isRemoveFileProperties()
* @see #getProject()
* @generated
*/
EAttribute getProject_RemoveFileProperties();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Project#isAdminProject <em>Admin Project</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Admin Project</em>'.
* @see org.eclipse.epf.msproject.Project#isAdminProject()
* @see #getProject()
* @generated
*/
EAttribute getProject_AdminProject();
/**
* Returns the meta object for the containment reference '{@link org.eclipse.epf.msproject.Project#getOutlineCodes <em>Outline Codes</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the containment reference '<em>Outline Codes</em>'.
* @see org.eclipse.epf.msproject.Project#getOutlineCodes()
* @see #getProject()
* @generated
*/
EReference getProject_OutlineCodes();
/**
* Returns the meta object for the containment reference '{@link org.eclipse.epf.msproject.Project#getWBSMasks <em>WBS Masks</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the containment reference '<em>WBS Masks</em>'.
* @see org.eclipse.epf.msproject.Project#getWBSMasks()
* @see #getProject()
* @generated
*/
EReference getProject_WBSMasks();
/**
* Returns the meta object for the containment reference '{@link org.eclipse.epf.msproject.Project#getExtendedAttributes <em>Extended Attributes</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the containment reference '<em>Extended Attributes</em>'.
* @see org.eclipse.epf.msproject.Project#getExtendedAttributes()
* @see #getProject()
* @generated
*/
EReference getProject_ExtendedAttributes();
/**
* Returns the meta object for the containment reference '{@link org.eclipse.epf.msproject.Project#getCalendars <em>Calendars</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the containment reference '<em>Calendars</em>'.
* @see org.eclipse.epf.msproject.Project#getCalendars()
* @see #getProject()
* @generated
*/
EReference getProject_Calendars();
/**
* Returns the meta object for the containment reference '{@link org.eclipse.epf.msproject.Project#getTasks <em>Tasks</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the containment reference '<em>Tasks</em>'.
* @see org.eclipse.epf.msproject.Project#getTasks()
* @see #getProject()
* @generated
*/
EReference getProject_Tasks();
/**
* Returns the meta object for the containment reference '{@link org.eclipse.epf.msproject.Project#getResources <em>Resources</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the containment reference '<em>Resources</em>'.
* @see org.eclipse.epf.msproject.Project#getResources()
* @see #getProject()
* @generated
*/
EReference getProject_Resources();
/**
* Returns the meta object for the containment reference '{@link org.eclipse.epf.msproject.Project#getAssignments <em>Assignments</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the containment reference '<em>Assignments</em>'.
* @see org.eclipse.epf.msproject.Project#getAssignments()
* @see #getProject()
* @generated
*/
EReference getProject_Assignments();
/**
* Returns the meta object for class '{@link org.eclipse.epf.msproject.Rate <em>Rate</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for class '<em>Rate</em>'.
* @see org.eclipse.epf.msproject.Rate
* @generated
*/
EClass getRate();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Rate#getRatesFrom <em>Rates From</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Rates From</em>'.
* @see org.eclipse.epf.msproject.Rate#getRatesFrom()
* @see #getRate()
* @generated
*/
EAttribute getRate_RatesFrom();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Rate#getRatesTo <em>Rates To</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Rates To</em>'.
* @see org.eclipse.epf.msproject.Rate#getRatesTo()
* @see #getRate()
* @generated
*/
EAttribute getRate_RatesTo();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Rate#getRateTable <em>Rate Table</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Rate Table</em>'.
* @see org.eclipse.epf.msproject.Rate#getRateTable()
* @see #getRate()
* @generated
*/
EAttribute getRate_RateTable();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Rate#getStandardRate <em>Standard Rate</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Standard Rate</em>'.
* @see org.eclipse.epf.msproject.Rate#getStandardRate()
* @see #getRate()
* @generated
*/
EAttribute getRate_StandardRate();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Rate#getStandardRateFormat <em>Standard Rate Format</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Standard Rate Format</em>'.
* @see org.eclipse.epf.msproject.Rate#getStandardRateFormat()
* @see #getRate()
* @generated
*/
EAttribute getRate_StandardRateFormat();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Rate#getOvertimeRate <em>Overtime Rate</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Overtime Rate</em>'.
* @see org.eclipse.epf.msproject.Rate#getOvertimeRate()
* @see #getRate()
* @generated
*/
EAttribute getRate_OvertimeRate();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Rate#getOvertimeRateFormat <em>Overtime Rate Format</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Overtime Rate Format</em>'.
* @see org.eclipse.epf.msproject.Rate#getOvertimeRateFormat()
* @see #getRate()
* @generated
*/
EAttribute getRate_OvertimeRateFormat();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Rate#getCostPerUse <em>Cost Per Use</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Cost Per Use</em>'.
* @see org.eclipse.epf.msproject.Rate#getCostPerUse()
* @see #getRate()
* @generated
*/
EAttribute getRate_CostPerUse();
/**
* Returns the meta object for class '{@link org.eclipse.epf.msproject.Rates <em>Rates</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for class '<em>Rates</em>'.
* @see org.eclipse.epf.msproject.Rates
* @generated
*/
EClass getRates();
/**
* Returns the meta object for the containment reference list '{@link org.eclipse.epf.msproject.Rates#getRate <em>Rate</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the containment reference list '<em>Rate</em>'.
* @see org.eclipse.epf.msproject.Rates#getRate()
* @see #getRates()
* @generated
*/
EReference getRates_Rate();
/**
* Returns the meta object for class '{@link org.eclipse.epf.msproject.Resource <em>Resource</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for class '<em>Resource</em>'.
* @see org.eclipse.epf.msproject.Resource
* @generated
*/
EClass getResource();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Resource#getUID <em>UID</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>UID</em>'.
* @see org.eclipse.epf.msproject.Resource#getUID()
* @see #getResource()
* @generated
*/
EAttribute getResource_UID();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Resource#getID <em>ID</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>ID</em>'.
* @see org.eclipse.epf.msproject.Resource#getID()
* @see #getResource()
* @generated
*/
EAttribute getResource_ID();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Resource#getName <em>Name</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Name</em>'.
* @see org.eclipse.epf.msproject.Resource#getName()
* @see #getResource()
* @generated
*/
EAttribute getResource_Name();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Resource#getType <em>Type</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Type</em>'.
* @see org.eclipse.epf.msproject.Resource#getType()
* @see #getResource()
* @generated
*/
EAttribute getResource_Type();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Resource#isIsNull <em>Is Null</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Is Null</em>'.
* @see org.eclipse.epf.msproject.Resource#isIsNull()
* @see #getResource()
* @generated
*/
EAttribute getResource_IsNull();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Resource#getInitials <em>Initials</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Initials</em>'.
* @see org.eclipse.epf.msproject.Resource#getInitials()
* @see #getResource()
* @generated
*/
EAttribute getResource_Initials();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Resource#getPhonetics <em>Phonetics</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Phonetics</em>'.
* @see org.eclipse.epf.msproject.Resource#getPhonetics()
* @see #getResource()
* @generated
*/
EAttribute getResource_Phonetics();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Resource#getNTAccount <em>NT Account</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>NT Account</em>'.
* @see org.eclipse.epf.msproject.Resource#getNTAccount()
* @see #getResource()
* @generated
*/
EAttribute getResource_NTAccount();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Resource#getMaterialLabel <em>Material Label</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Material Label</em>'.
* @see org.eclipse.epf.msproject.Resource#getMaterialLabel()
* @see #getResource()
* @generated
*/
EAttribute getResource_MaterialLabel();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Resource#getCode <em>Code</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Code</em>'.
* @see org.eclipse.epf.msproject.Resource#getCode()
* @see #getResource()
* @generated
*/
EAttribute getResource_Code();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Resource#getGroup <em>Group</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Group</em>'.
* @see org.eclipse.epf.msproject.Resource#getGroup()
* @see #getResource()
* @generated
*/
EAttribute getResource_Group();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Resource#getWorkGroup <em>Work Group</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Work Group</em>'.
* @see org.eclipse.epf.msproject.Resource#getWorkGroup()
* @see #getResource()
* @generated
*/
EAttribute getResource_WorkGroup();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Resource#getEmailAddress <em>Email Address</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Email Address</em>'.
* @see org.eclipse.epf.msproject.Resource#getEmailAddress()
* @see #getResource()
* @generated
*/
EAttribute getResource_EmailAddress();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Resource#getHyperlink <em>Hyperlink</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Hyperlink</em>'.
* @see org.eclipse.epf.msproject.Resource#getHyperlink()
* @see #getResource()
* @generated
*/
EAttribute getResource_Hyperlink();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Resource#getHyperlinkAddress <em>Hyperlink Address</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Hyperlink Address</em>'.
* @see org.eclipse.epf.msproject.Resource#getHyperlinkAddress()
* @see #getResource()
* @generated
*/
EAttribute getResource_HyperlinkAddress();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Resource#getHyperlinkSubAddress <em>Hyperlink Sub Address</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Hyperlink Sub Address</em>'.
* @see org.eclipse.epf.msproject.Resource#getHyperlinkSubAddress()
* @see #getResource()
* @generated
*/
EAttribute getResource_HyperlinkSubAddress();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Resource#getMaxUnits <em>Max Units</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Max Units</em>'.
* @see org.eclipse.epf.msproject.Resource#getMaxUnits()
* @see #getResource()
* @generated
*/
EAttribute getResource_MaxUnits();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Resource#getPeakUnits <em>Peak Units</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Peak Units</em>'.
* @see org.eclipse.epf.msproject.Resource#getPeakUnits()
* @see #getResource()
* @generated
*/
EAttribute getResource_PeakUnits();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Resource#isOverAllocated <em>Over Allocated</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Over Allocated</em>'.
* @see org.eclipse.epf.msproject.Resource#isOverAllocated()
* @see #getResource()
* @generated
*/
EAttribute getResource_OverAllocated();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Resource#getAvailableFrom <em>Available From</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Available From</em>'.
* @see org.eclipse.epf.msproject.Resource#getAvailableFrom()
* @see #getResource()
* @generated
*/
EAttribute getResource_AvailableFrom();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Resource#getAvailableTo <em>Available To</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Available To</em>'.
* @see org.eclipse.epf.msproject.Resource#getAvailableTo()
* @see #getResource()
* @generated
*/
EAttribute getResource_AvailableTo();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Resource#getStart <em>Start</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Start</em>'.
* @see org.eclipse.epf.msproject.Resource#getStart()
* @see #getResource()
* @generated
*/
EAttribute getResource_Start();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Resource#getFinish <em>Finish</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Finish</em>'.
* @see org.eclipse.epf.msproject.Resource#getFinish()
* @see #getResource()
* @generated
*/
EAttribute getResource_Finish();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Resource#isCanLevel <em>Can Level</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Can Level</em>'.
* @see org.eclipse.epf.msproject.Resource#isCanLevel()
* @see #getResource()
* @generated
*/
EAttribute getResource_CanLevel();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Resource#getAccrueAt <em>Accrue At</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Accrue At</em>'.
* @see org.eclipse.epf.msproject.Resource#getAccrueAt()
* @see #getResource()
* @generated
*/
EAttribute getResource_AccrueAt();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Resource#getWork <em>Work</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Work</em>'.
* @see org.eclipse.epf.msproject.Resource#getWork()
* @see #getResource()
* @generated
*/
EAttribute getResource_Work();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Resource#getRegularWork <em>Regular Work</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Regular Work</em>'.
* @see org.eclipse.epf.msproject.Resource#getRegularWork()
* @see #getResource()
* @generated
*/
EAttribute getResource_RegularWork();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Resource#getOvertimeWork <em>Overtime Work</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Overtime Work</em>'.
* @see org.eclipse.epf.msproject.Resource#getOvertimeWork()
* @see #getResource()
* @generated
*/
EAttribute getResource_OvertimeWork();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Resource#getActualWork <em>Actual Work</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Actual Work</em>'.
* @see org.eclipse.epf.msproject.Resource#getActualWork()
* @see #getResource()
* @generated
*/
EAttribute getResource_ActualWork();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Resource#getRemainingWork <em>Remaining Work</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Remaining Work</em>'.
* @see org.eclipse.epf.msproject.Resource#getRemainingWork()
* @see #getResource()
* @generated
*/
EAttribute getResource_RemainingWork();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Resource#getActualOvertimeWork <em>Actual Overtime Work</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Actual Overtime Work</em>'.
* @see org.eclipse.epf.msproject.Resource#getActualOvertimeWork()
* @see #getResource()
* @generated
*/
EAttribute getResource_ActualOvertimeWork();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Resource#getRemainingOvertimeWork <em>Remaining Overtime Work</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Remaining Overtime Work</em>'.
* @see org.eclipse.epf.msproject.Resource#getRemainingOvertimeWork()
* @see #getResource()
* @generated
*/
EAttribute getResource_RemainingOvertimeWork();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Resource#getPercentWorkComplete <em>Percent Work Complete</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Percent Work Complete</em>'.
* @see org.eclipse.epf.msproject.Resource#getPercentWorkComplete()
* @see #getResource()
* @generated
*/
EAttribute getResource_PercentWorkComplete();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Resource#getStandardRate <em>Standard Rate</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Standard Rate</em>'.
* @see org.eclipse.epf.msproject.Resource#getStandardRate()
* @see #getResource()
* @generated
*/
EAttribute getResource_StandardRate();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Resource#getStandardRateFormat <em>Standard Rate Format</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Standard Rate Format</em>'.
* @see org.eclipse.epf.msproject.Resource#getStandardRateFormat()
* @see #getResource()
* @generated
*/
EAttribute getResource_StandardRateFormat();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Resource#getCost <em>Cost</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Cost</em>'.
* @see org.eclipse.epf.msproject.Resource#getCost()
* @see #getResource()
* @generated
*/
EAttribute getResource_Cost();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Resource#getOvertimeRate <em>Overtime Rate</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Overtime Rate</em>'.
* @see org.eclipse.epf.msproject.Resource#getOvertimeRate()
* @see #getResource()
* @generated
*/
EAttribute getResource_OvertimeRate();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Resource#getOvertimeRateFormat <em>Overtime Rate Format</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Overtime Rate Format</em>'.
* @see org.eclipse.epf.msproject.Resource#getOvertimeRateFormat()
* @see #getResource()
* @generated
*/
EAttribute getResource_OvertimeRateFormat();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Resource#getOvertimeCost <em>Overtime Cost</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Overtime Cost</em>'.
* @see org.eclipse.epf.msproject.Resource#getOvertimeCost()
* @see #getResource()
* @generated
*/
EAttribute getResource_OvertimeCost();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Resource#getCostPerUse <em>Cost Per Use</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Cost Per Use</em>'.
* @see org.eclipse.epf.msproject.Resource#getCostPerUse()
* @see #getResource()
* @generated
*/
EAttribute getResource_CostPerUse();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Resource#getActualCost <em>Actual Cost</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Actual Cost</em>'.
* @see org.eclipse.epf.msproject.Resource#getActualCost()
* @see #getResource()
* @generated
*/
EAttribute getResource_ActualCost();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Resource#getActualOvertimeCost <em>Actual Overtime Cost</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Actual Overtime Cost</em>'.
* @see org.eclipse.epf.msproject.Resource#getActualOvertimeCost()
* @see #getResource()
* @generated
*/
EAttribute getResource_ActualOvertimeCost();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Resource#getRemainingCost <em>Remaining Cost</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Remaining Cost</em>'.
* @see org.eclipse.epf.msproject.Resource#getRemainingCost()
* @see #getResource()
* @generated
*/
EAttribute getResource_RemainingCost();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Resource#getRemainingOvertimeCost <em>Remaining Overtime Cost</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Remaining Overtime Cost</em>'.
* @see org.eclipse.epf.msproject.Resource#getRemainingOvertimeCost()
* @see #getResource()
* @generated
*/
EAttribute getResource_RemainingOvertimeCost();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Resource#getWorkVariance <em>Work Variance</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Work Variance</em>'.
* @see org.eclipse.epf.msproject.Resource#getWorkVariance()
* @see #getResource()
* @generated
*/
EAttribute getResource_WorkVariance();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Resource#getCostVariance <em>Cost Variance</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Cost Variance</em>'.
* @see org.eclipse.epf.msproject.Resource#getCostVariance()
* @see #getResource()
* @generated
*/
EAttribute getResource_CostVariance();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Resource#getSV <em>SV</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>SV</em>'.
* @see org.eclipse.epf.msproject.Resource#getSV()
* @see #getResource()
* @generated
*/
EAttribute getResource_SV();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Resource#getCV <em>CV</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>CV</em>'.
* @see org.eclipse.epf.msproject.Resource#getCV()
* @see #getResource()
* @generated
*/
EAttribute getResource_CV();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Resource#getACWP <em>ACWP</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>ACWP</em>'.
* @see org.eclipse.epf.msproject.Resource#getACWP()
* @see #getResource()
* @generated
*/
EAttribute getResource_ACWP();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Resource#getCalendarUID <em>Calendar UID</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Calendar UID</em>'.
* @see org.eclipse.epf.msproject.Resource#getCalendarUID()
* @see #getResource()
* @generated
*/
EAttribute getResource_CalendarUID();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Resource#getNotes <em>Notes</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Notes</em>'.
* @see org.eclipse.epf.msproject.Resource#getNotes()
* @see #getResource()
* @generated
*/
EAttribute getResource_Notes();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Resource#getBCWS <em>BCWS</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>BCWS</em>'.
* @see org.eclipse.epf.msproject.Resource#getBCWS()
* @see #getResource()
* @generated
*/
EAttribute getResource_BCWS();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Resource#getBCWP <em>BCWP</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>BCWP</em>'.
* @see org.eclipse.epf.msproject.Resource#getBCWP()
* @see #getResource()
* @generated
*/
EAttribute getResource_BCWP();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Resource#isIsGeneric <em>Is Generic</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Is Generic</em>'.
* @see org.eclipse.epf.msproject.Resource#isIsGeneric()
* @see #getResource()
* @generated
*/
EAttribute getResource_IsGeneric();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Resource#isIsInactive <em>Is Inactive</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Is Inactive</em>'.
* @see org.eclipse.epf.msproject.Resource#isIsInactive()
* @see #getResource()
* @generated
*/
EAttribute getResource_IsInactive();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Resource#isIsEnterprise <em>Is Enterprise</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Is Enterprise</em>'.
* @see org.eclipse.epf.msproject.Resource#isIsEnterprise()
* @see #getResource()
* @generated
*/
EAttribute getResource_IsEnterprise();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Resource#getBookingType <em>Booking Type</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Booking Type</em>'.
* @see org.eclipse.epf.msproject.Resource#getBookingType()
* @see #getResource()
* @generated
*/
EAttribute getResource_BookingType();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Resource#getActualWorkProtected <em>Actual Work Protected</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Actual Work Protected</em>'.
* @see org.eclipse.epf.msproject.Resource#getActualWorkProtected()
* @see #getResource()
* @generated
*/
EAttribute getResource_ActualWorkProtected();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Resource#getActualOvertimeWorkProtected <em>Actual Overtime Work Protected</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Actual Overtime Work Protected</em>'.
* @see org.eclipse.epf.msproject.Resource#getActualOvertimeWorkProtected()
* @see #getResource()
* @generated
*/
EAttribute getResource_ActualOvertimeWorkProtected();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Resource#getActiveDirectoryGUID <em>Active Directory GUID</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Active Directory GUID</em>'.
* @see org.eclipse.epf.msproject.Resource#getActiveDirectoryGUID()
* @see #getResource()
* @generated
*/
EAttribute getResource_ActiveDirectoryGUID();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Resource#getCreationDate <em>Creation Date</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Creation Date</em>'.
* @see org.eclipse.epf.msproject.Resource#getCreationDate()
* @see #getResource()
* @generated
*/
EAttribute getResource_CreationDate();
/**
* Returns the meta object for the containment reference list '{@link org.eclipse.epf.msproject.Resource#getExtendedAttribute <em>Extended Attribute</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the containment reference list '<em>Extended Attribute</em>'.
* @see org.eclipse.epf.msproject.Resource#getExtendedAttribute()
* @see #getResource()
* @generated
*/
EReference getResource_ExtendedAttribute();
/**
* Returns the meta object for the containment reference list '{@link org.eclipse.epf.msproject.Resource#getBaseline <em>Baseline</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the containment reference list '<em>Baseline</em>'.
* @see org.eclipse.epf.msproject.Resource#getBaseline()
* @see #getResource()
* @generated
*/
EReference getResource_Baseline();
/**
* Returns the meta object for the containment reference list '{@link org.eclipse.epf.msproject.Resource#getOutlineCode <em>Outline Code</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the containment reference list '<em>Outline Code</em>'.
* @see org.eclipse.epf.msproject.Resource#getOutlineCode()
* @see #getResource()
* @generated
*/
EReference getResource_OutlineCode();
/**
* Returns the meta object for the containment reference '{@link org.eclipse.epf.msproject.Resource#getAvailabilityPeriods <em>Availability Periods</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the containment reference '<em>Availability Periods</em>'.
* @see org.eclipse.epf.msproject.Resource#getAvailabilityPeriods()
* @see #getResource()
* @generated
*/
EReference getResource_AvailabilityPeriods();
/**
* Returns the meta object for the containment reference '{@link org.eclipse.epf.msproject.Resource#getRates <em>Rates</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the containment reference '<em>Rates</em>'.
* @see org.eclipse.epf.msproject.Resource#getRates()
* @see #getResource()
* @generated
*/
EReference getResource_Rates();
/**
* Returns the meta object for the containment reference list '{@link org.eclipse.epf.msproject.Resource#getTimephasedData <em>Timephased Data</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the containment reference list '<em>Timephased Data</em>'.
* @see org.eclipse.epf.msproject.Resource#getTimephasedData()
* @see #getResource()
* @generated
*/
EReference getResource_TimephasedData();
/**
* Returns the meta object for class '{@link org.eclipse.epf.msproject.Resources <em>Resources</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for class '<em>Resources</em>'.
* @see org.eclipse.epf.msproject.Resources
* @generated
*/
EClass getResources();
/**
* Returns the meta object for the containment reference list '{@link org.eclipse.epf.msproject.Resources#getResource <em>Resource</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the containment reference list '<em>Resource</em>'.
* @see org.eclipse.epf.msproject.Resources#getResource()
* @see #getResources()
* @generated
*/
EReference getResources_Resource();
/**
* Returns the meta object for class '{@link org.eclipse.epf.msproject.Task <em>Task</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for class '<em>Task</em>'.
* @see org.eclipse.epf.msproject.Task
* @generated
*/
EClass getTask();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Task#getUID <em>UID</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>UID</em>'.
* @see org.eclipse.epf.msproject.Task#getUID()
* @see #getTask()
* @generated
*/
EAttribute getTask_UID();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Task#getID <em>ID</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>ID</em>'.
* @see org.eclipse.epf.msproject.Task#getID()
* @see #getTask()
* @generated
*/
EAttribute getTask_ID();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Task#getName <em>Name</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Name</em>'.
* @see org.eclipse.epf.msproject.Task#getName()
* @see #getTask()
* @generated
*/
EAttribute getTask_Name();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Task#getType <em>Type</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Type</em>'.
* @see org.eclipse.epf.msproject.Task#getType()
* @see #getTask()
* @generated
*/
EAttribute getTask_Type();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Task#isIsNull <em>Is Null</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Is Null</em>'.
* @see org.eclipse.epf.msproject.Task#isIsNull()
* @see #getTask()
* @generated
*/
EAttribute getTask_IsNull();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Task#getCreateDate <em>Create Date</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Create Date</em>'.
* @see org.eclipse.epf.msproject.Task#getCreateDate()
* @see #getTask()
* @generated
*/
EAttribute getTask_CreateDate();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Task#getContact <em>Contact</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Contact</em>'.
* @see org.eclipse.epf.msproject.Task#getContact()
* @see #getTask()
* @generated
*/
EAttribute getTask_Contact();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Task#getWBS <em>WBS</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>WBS</em>'.
* @see org.eclipse.epf.msproject.Task#getWBS()
* @see #getTask()
* @generated
*/
EAttribute getTask_WBS();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Task#getWBSLevel <em>WBS Level</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>WBS Level</em>'.
* @see org.eclipse.epf.msproject.Task#getWBSLevel()
* @see #getTask()
* @generated
*/
EAttribute getTask_WBSLevel();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Task#getOutlineNumber <em>Outline Number</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Outline Number</em>'.
* @see org.eclipse.epf.msproject.Task#getOutlineNumber()
* @see #getTask()
* @generated
*/
EAttribute getTask_OutlineNumber();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Task#getOutlineLevel <em>Outline Level</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Outline Level</em>'.
* @see org.eclipse.epf.msproject.Task#getOutlineLevel()
* @see #getTask()
* @generated
*/
EAttribute getTask_OutlineLevel();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Task#getPriority <em>Priority</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Priority</em>'.
* @see org.eclipse.epf.msproject.Task#getPriority()
* @see #getTask()
* @generated
*/
EAttribute getTask_Priority();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Task#getStart <em>Start</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Start</em>'.
* @see org.eclipse.epf.msproject.Task#getStart()
* @see #getTask()
* @generated
*/
EAttribute getTask_Start();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Task#getFinish <em>Finish</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Finish</em>'.
* @see org.eclipse.epf.msproject.Task#getFinish()
* @see #getTask()
* @generated
*/
EAttribute getTask_Finish();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Task#getDuration <em>Duration</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Duration</em>'.
* @see org.eclipse.epf.msproject.Task#getDuration()
* @see #getTask()
* @generated
*/
EAttribute getTask_Duration();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Task#getDurationFormat <em>Duration Format</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Duration Format</em>'.
* @see org.eclipse.epf.msproject.Task#getDurationFormat()
* @see #getTask()
* @generated
*/
EAttribute getTask_DurationFormat();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Task#getWork <em>Work</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Work</em>'.
* @see org.eclipse.epf.msproject.Task#getWork()
* @see #getTask()
* @generated
*/
EAttribute getTask_Work();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Task#getStop <em>Stop</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Stop</em>'.
* @see org.eclipse.epf.msproject.Task#getStop()
* @see #getTask()
* @generated
*/
EAttribute getTask_Stop();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Task#getResume <em>Resume</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Resume</em>'.
* @see org.eclipse.epf.msproject.Task#getResume()
* @see #getTask()
* @generated
*/
EAttribute getTask_Resume();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Task#isResumeValid <em>Resume Valid</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Resume Valid</em>'.
* @see org.eclipse.epf.msproject.Task#isResumeValid()
* @see #getTask()
* @generated
*/
EAttribute getTask_ResumeValid();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Task#isEffortDriven <em>Effort Driven</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Effort Driven</em>'.
* @see org.eclipse.epf.msproject.Task#isEffortDriven()
* @see #getTask()
* @generated
*/
EAttribute getTask_EffortDriven();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Task#isRecurring <em>Recurring</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Recurring</em>'.
* @see org.eclipse.epf.msproject.Task#isRecurring()
* @see #getTask()
* @generated
*/
EAttribute getTask_Recurring();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Task#isOverAllocated <em>Over Allocated</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Over Allocated</em>'.
* @see org.eclipse.epf.msproject.Task#isOverAllocated()
* @see #getTask()
* @generated
*/
EAttribute getTask_OverAllocated();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Task#isEstimated <em>Estimated</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Estimated</em>'.
* @see org.eclipse.epf.msproject.Task#isEstimated()
* @see #getTask()
* @generated
*/
EAttribute getTask_Estimated();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Task#isMilestone <em>Milestone</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Milestone</em>'.
* @see org.eclipse.epf.msproject.Task#isMilestone()
* @see #getTask()
* @generated
*/
EAttribute getTask_Milestone();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Task#isSummary <em>Summary</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Summary</em>'.
* @see org.eclipse.epf.msproject.Task#isSummary()
* @see #getTask()
* @generated
*/
EAttribute getTask_Summary();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Task#isCritical <em>Critical</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Critical</em>'.
* @see org.eclipse.epf.msproject.Task#isCritical()
* @see #getTask()
* @generated
*/
EAttribute getTask_Critical();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Task#isIsSubproject <em>Is Subproject</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Is Subproject</em>'.
* @see org.eclipse.epf.msproject.Task#isIsSubproject()
* @see #getTask()
* @generated
*/
EAttribute getTask_IsSubproject();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Task#isIsSubprojectReadOnly <em>Is Subproject Read Only</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Is Subproject Read Only</em>'.
* @see org.eclipse.epf.msproject.Task#isIsSubprojectReadOnly()
* @see #getTask()
* @generated
*/
EAttribute getTask_IsSubprojectReadOnly();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Task#getSubprojectName <em>Subproject Name</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Subproject Name</em>'.
* @see org.eclipse.epf.msproject.Task#getSubprojectName()
* @see #getTask()
* @generated
*/
EAttribute getTask_SubprojectName();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Task#isExternalTask <em>External Task</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>External Task</em>'.
* @see org.eclipse.epf.msproject.Task#isExternalTask()
* @see #getTask()
* @generated
*/
EAttribute getTask_ExternalTask();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Task#getExternalTaskProject <em>External Task Project</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>External Task Project</em>'.
* @see org.eclipse.epf.msproject.Task#getExternalTaskProject()
* @see #getTask()
* @generated
*/
EAttribute getTask_ExternalTaskProject();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Task#getEarlyStart <em>Early Start</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Early Start</em>'.
* @see org.eclipse.epf.msproject.Task#getEarlyStart()
* @see #getTask()
* @generated
*/
EAttribute getTask_EarlyStart();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Task#getEarlyFinish <em>Early Finish</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Early Finish</em>'.
* @see org.eclipse.epf.msproject.Task#getEarlyFinish()
* @see #getTask()
* @generated
*/
EAttribute getTask_EarlyFinish();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Task#getLateStart <em>Late Start</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Late Start</em>'.
* @see org.eclipse.epf.msproject.Task#getLateStart()
* @see #getTask()
* @generated
*/
EAttribute getTask_LateStart();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Task#getLateFinish <em>Late Finish</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Late Finish</em>'.
* @see org.eclipse.epf.msproject.Task#getLateFinish()
* @see #getTask()
* @generated
*/
EAttribute getTask_LateFinish();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Task#getStartVariance <em>Start Variance</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Start Variance</em>'.
* @see org.eclipse.epf.msproject.Task#getStartVariance()
* @see #getTask()
* @generated
*/
EAttribute getTask_StartVariance();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Task#getFinishVariance <em>Finish Variance</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Finish Variance</em>'.
* @see org.eclipse.epf.msproject.Task#getFinishVariance()
* @see #getTask()
* @generated
*/
EAttribute getTask_FinishVariance();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Task#getWorkVariance <em>Work Variance</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Work Variance</em>'.
* @see org.eclipse.epf.msproject.Task#getWorkVariance()
* @see #getTask()
* @generated
*/
EAttribute getTask_WorkVariance();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Task#getFreeSlack <em>Free Slack</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Free Slack</em>'.
* @see org.eclipse.epf.msproject.Task#getFreeSlack()
* @see #getTask()
* @generated
*/
EAttribute getTask_FreeSlack();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Task#getTotalSlack <em>Total Slack</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Total Slack</em>'.
* @see org.eclipse.epf.msproject.Task#getTotalSlack()
* @see #getTask()
* @generated
*/
EAttribute getTask_TotalSlack();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Task#getFixedCost <em>Fixed Cost</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Fixed Cost</em>'.
* @see org.eclipse.epf.msproject.Task#getFixedCost()
* @see #getTask()
* @generated
*/
EAttribute getTask_FixedCost();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Task#getFixedCostAccrual <em>Fixed Cost Accrual</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Fixed Cost Accrual</em>'.
* @see org.eclipse.epf.msproject.Task#getFixedCostAccrual()
* @see #getTask()
* @generated
*/
EAttribute getTask_FixedCostAccrual();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Task#getPercentComplete <em>Percent Complete</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Percent Complete</em>'.
* @see org.eclipse.epf.msproject.Task#getPercentComplete()
* @see #getTask()
* @generated
*/
EAttribute getTask_PercentComplete();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Task#getPercentWorkComplete <em>Percent Work Complete</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Percent Work Complete</em>'.
* @see org.eclipse.epf.msproject.Task#getPercentWorkComplete()
* @see #getTask()
* @generated
*/
EAttribute getTask_PercentWorkComplete();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Task#getCost <em>Cost</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Cost</em>'.
* @see org.eclipse.epf.msproject.Task#getCost()
* @see #getTask()
* @generated
*/
EAttribute getTask_Cost();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Task#getOvertimeCost <em>Overtime Cost</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Overtime Cost</em>'.
* @see org.eclipse.epf.msproject.Task#getOvertimeCost()
* @see #getTask()
* @generated
*/
EAttribute getTask_OvertimeCost();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Task#getOvertimeWork <em>Overtime Work</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Overtime Work</em>'.
* @see org.eclipse.epf.msproject.Task#getOvertimeWork()
* @see #getTask()
* @generated
*/
EAttribute getTask_OvertimeWork();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Task#getActualStart <em>Actual Start</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Actual Start</em>'.
* @see org.eclipse.epf.msproject.Task#getActualStart()
* @see #getTask()
* @generated
*/
EAttribute getTask_ActualStart();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Task#getActualFinish <em>Actual Finish</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Actual Finish</em>'.
* @see org.eclipse.epf.msproject.Task#getActualFinish()
* @see #getTask()
* @generated
*/
EAttribute getTask_ActualFinish();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Task#getActualDuration <em>Actual Duration</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Actual Duration</em>'.
* @see org.eclipse.epf.msproject.Task#getActualDuration()
* @see #getTask()
* @generated
*/
EAttribute getTask_ActualDuration();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Task#getActualCost <em>Actual Cost</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Actual Cost</em>'.
* @see org.eclipse.epf.msproject.Task#getActualCost()
* @see #getTask()
* @generated
*/
EAttribute getTask_ActualCost();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Task#getActualOvertimeCost <em>Actual Overtime Cost</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Actual Overtime Cost</em>'.
* @see org.eclipse.epf.msproject.Task#getActualOvertimeCost()
* @see #getTask()
* @generated
*/
EAttribute getTask_ActualOvertimeCost();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Task#getActualWork <em>Actual Work</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Actual Work</em>'.
* @see org.eclipse.epf.msproject.Task#getActualWork()
* @see #getTask()
* @generated
*/
EAttribute getTask_ActualWork();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Task#getActualOvertimeWork <em>Actual Overtime Work</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Actual Overtime Work</em>'.
* @see org.eclipse.epf.msproject.Task#getActualOvertimeWork()
* @see #getTask()
* @generated
*/
EAttribute getTask_ActualOvertimeWork();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Task#getRegularWork <em>Regular Work</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Regular Work</em>'.
* @see org.eclipse.epf.msproject.Task#getRegularWork()
* @see #getTask()
* @generated
*/
EAttribute getTask_RegularWork();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Task#getRemainingDuration <em>Remaining Duration</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Remaining Duration</em>'.
* @see org.eclipse.epf.msproject.Task#getRemainingDuration()
* @see #getTask()
* @generated
*/
EAttribute getTask_RemainingDuration();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Task#getRemainingCost <em>Remaining Cost</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Remaining Cost</em>'.
* @see org.eclipse.epf.msproject.Task#getRemainingCost()
* @see #getTask()
* @generated
*/
EAttribute getTask_RemainingCost();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Task#getRemainingWork <em>Remaining Work</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Remaining Work</em>'.
* @see org.eclipse.epf.msproject.Task#getRemainingWork()
* @see #getTask()
* @generated
*/
EAttribute getTask_RemainingWork();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Task#getRemainingOvertimeCost <em>Remaining Overtime Cost</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Remaining Overtime Cost</em>'.
* @see org.eclipse.epf.msproject.Task#getRemainingOvertimeCost()
* @see #getTask()
* @generated
*/
EAttribute getTask_RemainingOvertimeCost();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Task#getRemainingOvertimeWork <em>Remaining Overtime Work</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Remaining Overtime Work</em>'.
* @see org.eclipse.epf.msproject.Task#getRemainingOvertimeWork()
* @see #getTask()
* @generated
*/
EAttribute getTask_RemainingOvertimeWork();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Task#getACWP <em>ACWP</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>ACWP</em>'.
* @see org.eclipse.epf.msproject.Task#getACWP()
* @see #getTask()
* @generated
*/
EAttribute getTask_ACWP();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Task#getCV <em>CV</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>CV</em>'.
* @see org.eclipse.epf.msproject.Task#getCV()
* @see #getTask()
* @generated
*/
EAttribute getTask_CV();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Task#getConstraintType <em>Constraint Type</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Constraint Type</em>'.
* @see org.eclipse.epf.msproject.Task#getConstraintType()
* @see #getTask()
* @generated
*/
EAttribute getTask_ConstraintType();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Task#getCalendarUID <em>Calendar UID</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Calendar UID</em>'.
* @see org.eclipse.epf.msproject.Task#getCalendarUID()
* @see #getTask()
* @generated
*/
EAttribute getTask_CalendarUID();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Task#getConstraintDate <em>Constraint Date</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Constraint Date</em>'.
* @see org.eclipse.epf.msproject.Task#getConstraintDate()
* @see #getTask()
* @generated
*/
EAttribute getTask_ConstraintDate();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Task#getDeadline <em>Deadline</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Deadline</em>'.
* @see org.eclipse.epf.msproject.Task#getDeadline()
* @see #getTask()
* @generated
*/
EAttribute getTask_Deadline();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Task#isLevelAssignments <em>Level Assignments</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Level Assignments</em>'.
* @see org.eclipse.epf.msproject.Task#isLevelAssignments()
* @see #getTask()
* @generated
*/
EAttribute getTask_LevelAssignments();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Task#isLevelingCanSplit <em>Leveling Can Split</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Leveling Can Split</em>'.
* @see org.eclipse.epf.msproject.Task#isLevelingCanSplit()
* @see #getTask()
* @generated
*/
EAttribute getTask_LevelingCanSplit();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Task#getLevelingDelay <em>Leveling Delay</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Leveling Delay</em>'.
* @see org.eclipse.epf.msproject.Task#getLevelingDelay()
* @see #getTask()
* @generated
*/
EAttribute getTask_LevelingDelay();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Task#getLevelingDelayFormat <em>Leveling Delay Format</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Leveling Delay Format</em>'.
* @see org.eclipse.epf.msproject.Task#getLevelingDelayFormat()
* @see #getTask()
* @generated
*/
EAttribute getTask_LevelingDelayFormat();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Task#getPreLeveledStart <em>Pre Leveled Start</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Pre Leveled Start</em>'.
* @see org.eclipse.epf.msproject.Task#getPreLeveledStart()
* @see #getTask()
* @generated
*/
EAttribute getTask_PreLeveledStart();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Task#getPreLeveledFinish <em>Pre Leveled Finish</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Pre Leveled Finish</em>'.
* @see org.eclipse.epf.msproject.Task#getPreLeveledFinish()
* @see #getTask()
* @generated
*/
EAttribute getTask_PreLeveledFinish();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Task#getHyperlink <em>Hyperlink</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Hyperlink</em>'.
* @see org.eclipse.epf.msproject.Task#getHyperlink()
* @see #getTask()
* @generated
*/
EAttribute getTask_Hyperlink();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Task#getHyperlinkAddress <em>Hyperlink Address</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Hyperlink Address</em>'.
* @see org.eclipse.epf.msproject.Task#getHyperlinkAddress()
* @see #getTask()
* @generated
*/
EAttribute getTask_HyperlinkAddress();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Task#getHyperlinkSubAddress <em>Hyperlink Sub Address</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Hyperlink Sub Address</em>'.
* @see org.eclipse.epf.msproject.Task#getHyperlinkSubAddress()
* @see #getTask()
* @generated
*/
EAttribute getTask_HyperlinkSubAddress();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Task#isIgnoreResourceCalendar <em>Ignore Resource Calendar</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Ignore Resource Calendar</em>'.
* @see org.eclipse.epf.msproject.Task#isIgnoreResourceCalendar()
* @see #getTask()
* @generated
*/
EAttribute getTask_IgnoreResourceCalendar();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Task#getNotes <em>Notes</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Notes</em>'.
* @see org.eclipse.epf.msproject.Task#getNotes()
* @see #getTask()
* @generated
*/
EAttribute getTask_Notes();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Task#isHideBar <em>Hide Bar</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Hide Bar</em>'.
* @see org.eclipse.epf.msproject.Task#isHideBar()
* @see #getTask()
* @generated
*/
EAttribute getTask_HideBar();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Task#isRollup <em>Rollup</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Rollup</em>'.
* @see org.eclipse.epf.msproject.Task#isRollup()
* @see #getTask()
* @generated
*/
EAttribute getTask_Rollup();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Task#getBCWS <em>BCWS</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>BCWS</em>'.
* @see org.eclipse.epf.msproject.Task#getBCWS()
* @see #getTask()
* @generated
*/
EAttribute getTask_BCWS();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Task#getBCWP <em>BCWP</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>BCWP</em>'.
* @see org.eclipse.epf.msproject.Task#getBCWP()
* @see #getTask()
* @generated
*/
EAttribute getTask_BCWP();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Task#getPhysicalPercentComplete <em>Physical Percent Complete</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Physical Percent Complete</em>'.
* @see org.eclipse.epf.msproject.Task#getPhysicalPercentComplete()
* @see #getTask()
* @generated
*/
EAttribute getTask_PhysicalPercentComplete();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Task#getEarnedValueMethod <em>Earned Value Method</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Earned Value Method</em>'.
* @see org.eclipse.epf.msproject.Task#getEarnedValueMethod()
* @see #getTask()
* @generated
*/
EAttribute getTask_EarnedValueMethod();
/**
* Returns the meta object for the containment reference list '{@link org.eclipse.epf.msproject.Task#getPredecessorLink <em>Predecessor Link</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the containment reference list '<em>Predecessor Link</em>'.
* @see org.eclipse.epf.msproject.Task#getPredecessorLink()
* @see #getTask()
* @generated
*/
EReference getTask_PredecessorLink();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Task#getActualWorkProtected <em>Actual Work Protected</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Actual Work Protected</em>'.
* @see org.eclipse.epf.msproject.Task#getActualWorkProtected()
* @see #getTask()
* @generated
*/
EAttribute getTask_ActualWorkProtected();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Task#getActualOvertimeWorkProtected <em>Actual Overtime Work Protected</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Actual Overtime Work Protected</em>'.
* @see org.eclipse.epf.msproject.Task#getActualOvertimeWorkProtected()
* @see #getTask()
* @generated
*/
EAttribute getTask_ActualOvertimeWorkProtected();
/**
* Returns the meta object for the containment reference list '{@link org.eclipse.epf.msproject.Task#getExtendedAttribute <em>Extended Attribute</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the containment reference list '<em>Extended Attribute</em>'.
* @see org.eclipse.epf.msproject.Task#getExtendedAttribute()
* @see #getTask()
* @generated
*/
EReference getTask_ExtendedAttribute();
/**
* Returns the meta object for the containment reference list '{@link org.eclipse.epf.msproject.Task#getBaseline <em>Baseline</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the containment reference list '<em>Baseline</em>'.
* @see org.eclipse.epf.msproject.Task#getBaseline()
* @see #getTask()
* @generated
*/
EReference getTask_Baseline();
/**
* Returns the meta object for the containment reference list '{@link org.eclipse.epf.msproject.Task#getOutlineCode <em>Outline Code</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the containment reference list '<em>Outline Code</em>'.
* @see org.eclipse.epf.msproject.Task#getOutlineCode()
* @see #getTask()
* @generated
*/
EReference getTask_OutlineCode();
/**
* Returns the meta object for the containment reference list '{@link org.eclipse.epf.msproject.Task#getTimephasedData <em>Timephased Data</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the containment reference list '<em>Timephased Data</em>'.
* @see org.eclipse.epf.msproject.Task#getTimephasedData()
* @see #getTask()
* @generated
*/
EReference getTask_TimephasedData();
/**
* Returns the meta object for class '{@link org.eclipse.epf.msproject.Tasks <em>Tasks</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for class '<em>Tasks</em>'.
* @see org.eclipse.epf.msproject.Tasks
* @generated
*/
EClass getTasks();
/**
* Returns the meta object for the containment reference list '{@link org.eclipse.epf.msproject.Tasks#getTask <em>Task</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the containment reference list '<em>Task</em>'.
* @see org.eclipse.epf.msproject.Tasks#getTask()
* @see #getTasks()
* @generated
*/
EReference getTasks_Task();
/**
* Returns the meta object for class '{@link org.eclipse.epf.msproject.TimePeriod <em>Time Period</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for class '<em>Time Period</em>'.
* @see org.eclipse.epf.msproject.TimePeriod
* @generated
*/
EClass getTimePeriod();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.TimePeriod#getFromDate <em>From Date</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>From Date</em>'.
* @see org.eclipse.epf.msproject.TimePeriod#getFromDate()
* @see #getTimePeriod()
* @generated
*/
EAttribute getTimePeriod_FromDate();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.TimePeriod#getToDate <em>To Date</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>To Date</em>'.
* @see org.eclipse.epf.msproject.TimePeriod#getToDate()
* @see #getTimePeriod()
* @generated
*/
EAttribute getTimePeriod_ToDate();
/**
* Returns the meta object for class '{@link org.eclipse.epf.msproject.TimephasedDataType <em>Timephased Data Type</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for class '<em>Timephased Data Type</em>'.
* @see org.eclipse.epf.msproject.TimephasedDataType
* @generated
*/
EClass getTimephasedDataType();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.TimephasedDataType#getType <em>Type</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Type</em>'.
* @see org.eclipse.epf.msproject.TimephasedDataType#getType()
* @see #getTimephasedDataType()
* @generated
*/
EAttribute getTimephasedDataType_Type();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.TimephasedDataType#getUID <em>UID</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>UID</em>'.
* @see org.eclipse.epf.msproject.TimephasedDataType#getUID()
* @see #getTimephasedDataType()
* @generated
*/
EAttribute getTimephasedDataType_UID();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.TimephasedDataType#getStart <em>Start</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Start</em>'.
* @see org.eclipse.epf.msproject.TimephasedDataType#getStart()
* @see #getTimephasedDataType()
* @generated
*/
EAttribute getTimephasedDataType_Start();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.TimephasedDataType#getFinish <em>Finish</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Finish</em>'.
* @see org.eclipse.epf.msproject.TimephasedDataType#getFinish()
* @see #getTimephasedDataType()
* @generated
*/
EAttribute getTimephasedDataType_Finish();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.TimephasedDataType#getUnit <em>Unit</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Unit</em>'.
* @see org.eclipse.epf.msproject.TimephasedDataType#getUnit()
* @see #getTimephasedDataType()
* @generated
*/
EAttribute getTimephasedDataType_Unit();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.TimephasedDataType#getValue <em>Value</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Value</em>'.
* @see org.eclipse.epf.msproject.TimephasedDataType#getValue()
* @see #getTimephasedDataType()
* @generated
*/
EAttribute getTimephasedDataType_Value();
/**
* Returns the meta object for class '{@link org.eclipse.epf.msproject.Value <em>Value</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for class '<em>Value</em>'.
* @see org.eclipse.epf.msproject.Value
* @generated
*/
EClass getValue();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Value#getValueID <em>Value ID</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Value ID</em>'.
* @see org.eclipse.epf.msproject.Value#getValueID()
* @see #getValue()
* @generated
*/
EAttribute getValue_ValueID();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Value#getParentValueID <em>Parent Value ID</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Parent Value ID</em>'.
* @see org.eclipse.epf.msproject.Value#getParentValueID()
* @see #getValue()
* @generated
*/
EAttribute getValue_ParentValueID();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Value#getValue <em>Value</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Value</em>'.
* @see org.eclipse.epf.msproject.Value#getValue()
* @see #getValue()
* @generated
*/
EAttribute getValue_Value();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Value#getDescription <em>Description</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Description</em>'.
* @see org.eclipse.epf.msproject.Value#getDescription()
* @see #getValue()
* @generated
*/
EAttribute getValue_Description();
/**
* Returns the meta object for class '{@link org.eclipse.epf.msproject.Value2 <em>Value2</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for class '<em>Value2</em>'.
* @see org.eclipse.epf.msproject.Value2
* @generated
*/
EClass getValue2();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Value2#getID <em>ID</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>ID</em>'.
* @see org.eclipse.epf.msproject.Value2#getID()
* @see #getValue2()
* @generated
*/
EAttribute getValue2_ID();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Value2#getValue <em>Value</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Value</em>'.
* @see org.eclipse.epf.msproject.Value2#getValue()
* @see #getValue2()
* @generated
*/
EAttribute getValue2_Value();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.Value2#getDescription <em>Description</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Description</em>'.
* @see org.eclipse.epf.msproject.Value2#getDescription()
* @see #getValue2()
* @generated
*/
EAttribute getValue2_Description();
/**
* Returns the meta object for class '{@link org.eclipse.epf.msproject.ValueList <em>Value List</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for class '<em>Value List</em>'.
* @see org.eclipse.epf.msproject.ValueList
* @generated
*/
EClass getValueList();
/**
* Returns the meta object for the containment reference list '{@link org.eclipse.epf.msproject.ValueList#getValue <em>Value</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the containment reference list '<em>Value</em>'.
* @see org.eclipse.epf.msproject.ValueList#getValue()
* @see #getValueList()
* @generated
*/
EReference getValueList_Value();
/**
* Returns the meta object for class '{@link org.eclipse.epf.msproject.Values <em>Values</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for class '<em>Values</em>'.
* @see org.eclipse.epf.msproject.Values
* @generated
*/
EClass getValues();
/**
* Returns the meta object for the attribute list '{@link org.eclipse.epf.msproject.Values#getGroup <em>Group</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute list '<em>Group</em>'.
* @see org.eclipse.epf.msproject.Values#getGroup()
* @see #getValues()
* @generated
*/
EAttribute getValues_Group();
/**
* Returns the meta object for the containment reference list '{@link org.eclipse.epf.msproject.Values#getValue <em>Value</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the containment reference list '<em>Value</em>'.
* @see org.eclipse.epf.msproject.Values#getValue()
* @see #getValues()
* @generated
*/
EReference getValues_Value();
/**
* Returns the meta object for class '{@link org.eclipse.epf.msproject.WBSMask <em>WBS Mask</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for class '<em>WBS Mask</em>'.
* @see org.eclipse.epf.msproject.WBSMask
* @generated
*/
EClass getWBSMask();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.WBSMask#getLevel <em>Level</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Level</em>'.
* @see org.eclipse.epf.msproject.WBSMask#getLevel()
* @see #getWBSMask()
* @generated
*/
EAttribute getWBSMask_Level();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.WBSMask#getType <em>Type</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Type</em>'.
* @see org.eclipse.epf.msproject.WBSMask#getType()
* @see #getWBSMask()
* @generated
*/
EAttribute getWBSMask_Type();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.WBSMask#getLength <em>Length</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Length</em>'.
* @see org.eclipse.epf.msproject.WBSMask#getLength()
* @see #getWBSMask()
* @generated
*/
EAttribute getWBSMask_Length();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.WBSMask#getSeparator <em>Separator</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Separator</em>'.
* @see org.eclipse.epf.msproject.WBSMask#getSeparator()
* @see #getWBSMask()
* @generated
*/
EAttribute getWBSMask_Separator();
/**
* Returns the meta object for class '{@link org.eclipse.epf.msproject.WBSMasks <em>WBS Masks</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for class '<em>WBS Masks</em>'.
* @see org.eclipse.epf.msproject.WBSMasks
* @generated
*/
EClass getWBSMasks();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.WBSMasks#isVerifyUniqueCodes <em>Verify Unique Codes</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Verify Unique Codes</em>'.
* @see org.eclipse.epf.msproject.WBSMasks#isVerifyUniqueCodes()
* @see #getWBSMasks()
* @generated
*/
EAttribute getWBSMasks_VerifyUniqueCodes();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.WBSMasks#isGenerateCodes <em>Generate Codes</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Generate Codes</em>'.
* @see org.eclipse.epf.msproject.WBSMasks#isGenerateCodes()
* @see #getWBSMasks()
* @generated
*/
EAttribute getWBSMasks_GenerateCodes();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.WBSMasks#getPrefix <em>Prefix</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Prefix</em>'.
* @see org.eclipse.epf.msproject.WBSMasks#getPrefix()
* @see #getWBSMasks()
* @generated
*/
EAttribute getWBSMasks_Prefix();
/**
* Returns the meta object for the containment reference list '{@link org.eclipse.epf.msproject.WBSMasks#getWBSMask <em>WBS Mask</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the containment reference list '<em>WBS Mask</em>'.
* @see org.eclipse.epf.msproject.WBSMasks#getWBSMask()
* @see #getWBSMasks()
* @generated
*/
EReference getWBSMasks_WBSMask();
/**
* Returns the meta object for class '{@link org.eclipse.epf.msproject.WeekDay <em>Week Day</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for class '<em>Week Day</em>'.
* @see org.eclipse.epf.msproject.WeekDay
* @generated
*/
EClass getWeekDay();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.WeekDay#getDayType <em>Day Type</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Day Type</em>'.
* @see org.eclipse.epf.msproject.WeekDay#getDayType()
* @see #getWeekDay()
* @generated
*/
EAttribute getWeekDay_DayType();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.WeekDay#isDayWorking <em>Day Working</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>Day Working</em>'.
* @see org.eclipse.epf.msproject.WeekDay#isDayWorking()
* @see #getWeekDay()
* @generated
*/
EAttribute getWeekDay_DayWorking();
/**
* Returns the meta object for the containment reference '{@link org.eclipse.epf.msproject.WeekDay#getTimePeriod <em>Time Period</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the containment reference '<em>Time Period</em>'.
* @see org.eclipse.epf.msproject.WeekDay#getTimePeriod()
* @see #getWeekDay()
* @generated
*/
EReference getWeekDay_TimePeriod();
/**
* Returns the meta object for the containment reference '{@link org.eclipse.epf.msproject.WeekDay#getWorkingTimes <em>Working Times</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the containment reference '<em>Working Times</em>'.
* @see org.eclipse.epf.msproject.WeekDay#getWorkingTimes()
* @see #getWeekDay()
* @generated
*/
EReference getWeekDay_WorkingTimes();
/**
* Returns the meta object for class '{@link org.eclipse.epf.msproject.WeekDays <em>Week Days</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for class '<em>Week Days</em>'.
* @see org.eclipse.epf.msproject.WeekDays
* @generated
*/
EClass getWeekDays();
/**
* Returns the meta object for the containment reference list '{@link org.eclipse.epf.msproject.WeekDays#getWeekDay <em>Week Day</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the containment reference list '<em>Week Day</em>'.
* @see org.eclipse.epf.msproject.WeekDays#getWeekDay()
* @see #getWeekDays()
* @generated
*/
EReference getWeekDays_WeekDay();
/**
* Returns the meta object for class '{@link org.eclipse.epf.msproject.WorkingTime <em>Working Time</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for class '<em>Working Time</em>'.
* @see org.eclipse.epf.msproject.WorkingTime
* @generated
*/
EClass getWorkingTime();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.WorkingTime#getFromTime <em>From Time</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>From Time</em>'.
* @see org.eclipse.epf.msproject.WorkingTime#getFromTime()
* @see #getWorkingTime()
* @generated
*/
EAttribute getWorkingTime_FromTime();
/**
* Returns the meta object for the attribute '{@link org.eclipse.epf.msproject.WorkingTime#getToTime <em>To Time</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the attribute '<em>To Time</em>'.
* @see org.eclipse.epf.msproject.WorkingTime#getToTime()
* @see #getWorkingTime()
* @generated
*/
EAttribute getWorkingTime_ToTime();
/**
* Returns the meta object for class '{@link org.eclipse.epf.msproject.WorkingTimes <em>Working Times</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for class '<em>Working Times</em>'.
* @see org.eclipse.epf.msproject.WorkingTimes
* @generated
*/
EClass getWorkingTimes();
/**
* Returns the meta object for the containment reference list '{@link org.eclipse.epf.msproject.WorkingTimes#getWorkingTime <em>Working Time</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for the containment reference list '<em>Working Time</em>'.
* @see org.eclipse.epf.msproject.WorkingTimes#getWorkingTime()
* @see #getWorkingTimes()
* @generated
*/
EReference getWorkingTimes_WorkingTime();
/**
* Returns the meta object for data type '{@link java.math.BigInteger <em>Accrue At</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for data type '<em>Accrue At</em>'.
* @see java.math.BigInteger
* @model instanceClass="java.math.BigInteger"
* extendedMetaData="name='AccrueAt_._type' baseType='http://www.eclipse.org/emf/2003/XMLType#integer' enumeration='1 2 3'"
* @generated
*/
EDataType getAccrueAt();
/**
* Returns the meta object for data type '{@link java.lang.String <em>Active Directory GUID Type</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for data type '<em>Active Directory GUID Type</em>'.
* @see java.lang.String
* @model instanceClass="java.lang.String"
* extendedMetaData="name='ActiveDirectoryGUID_._type' baseType='http://www.eclipse.org/emf/2003/XMLType#string' maxLength='16'"
* @generated
*/
EDataType getActiveDirectoryGUIDType();
/**
* Returns the meta object for data type '{@link java.lang.String <em>Alias Type</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for data type '<em>Alias Type</em>'.
* @see java.lang.String
* @model instanceClass="java.lang.String"
* extendedMetaData="name='Alias_._type' baseType='http://www.eclipse.org/emf/2003/XMLType#string' maxLength='50'"
* @generated
*/
EDataType getAliasType();
/**
* Returns the meta object for data type '{@link java.lang.String <em>Author Type</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for data type '<em>Author Type</em>'.
* @see java.lang.String
* @model instanceClass="java.lang.String"
* extendedMetaData="name='Author_._type' baseType='http://www.eclipse.org/emf/2003/XMLType#string' maxLength='512'"
* @generated
*/
EDataType getAuthorType();
/**
* Returns the meta object for data type '{@link java.math.BigInteger <em>Baseline For Earned Value Type</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for data type '<em>Baseline For Earned Value Type</em>'.
* @see java.math.BigInteger
* @model instanceClass="java.math.BigInteger"
* extendedMetaData="name='BaselineForEarnedValue_._type' baseType='http://www.eclipse.org/emf/2003/XMLType#integer' enumeration='0 1 2 3 4 5 6 7 8 9 10'"
* @generated
*/
EDataType getBaselineForEarnedValueType();
/**
* Returns the meta object for data type '{@link java.math.BigInteger <em>Booking Type Type</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for data type '<em>Booking Type Type</em>'.
* @see java.math.BigInteger
* @model instanceClass="java.math.BigInteger"
* extendedMetaData="name='BookingType_._type' baseType='http://www.eclipse.org/emf/2003/XMLType#integer' enumeration='0 1'"
* @generated
*/
EDataType getBookingTypeType();
/**
* Returns the meta object for data type '{@link java.math.BigInteger <em>Booking Type Type1</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for data type '<em>Booking Type Type1</em>'.
* @see java.math.BigInteger
* @model instanceClass="java.math.BigInteger"
* extendedMetaData="name='BookingType_._1_._type' baseType='http://www.eclipse.org/emf/2003/XMLType#integer' enumeration='0 1'"
* @generated
*/
EDataType getBookingTypeType1();
/**
* Returns the meta object for data type '{@link java.math.BigInteger <em>Calculation Type Type</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for data type '<em>Calculation Type Type</em>'.
* @see java.math.BigInteger
* @model instanceClass="java.math.BigInteger"
* extendedMetaData="name='CalculationType_._type' baseType='http://www.eclipse.org/emf/2003/XMLType#integer' enumeration='0 1 2'"
* @generated
*/
EDataType getCalculationTypeType();
/**
* Returns the meta object for data type '{@link java.lang.String <em>Category Type</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for data type '<em>Category Type</em>'.
* @see java.lang.String
* @model instanceClass="java.lang.String"
* extendedMetaData="name='Category_._type' baseType='http://www.eclipse.org/emf/2003/XMLType#string' maxLength='512'"
* @generated
*/
EDataType getCategoryType();
/**
* Returns the meta object for data type '{@link java.lang.String <em>Code Type</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for data type '<em>Code Type</em>'.
* @see java.lang.String
* @model instanceClass="java.lang.String"
* extendedMetaData="name='Code_._type' baseType='http://www.eclipse.org/emf/2003/XMLType#string' maxLength='512'"
* @generated
*/
EDataType getCodeType();
/**
* Returns the meta object for data type '{@link java.lang.String <em>Company Type</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for data type '<em>Company Type</em>'.
* @see java.lang.String
* @model instanceClass="java.lang.String"
* extendedMetaData="name='Company_._type' baseType='http://www.eclipse.org/emf/2003/XMLType#string' maxLength='512'"
* @generated
*/
EDataType getCompanyType();
/**
* Returns the meta object for data type '{@link java.math.BigInteger <em>Constraint Type Type</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for data type '<em>Constraint Type Type</em>'.
* @see java.math.BigInteger
* @model instanceClass="java.math.BigInteger"
* extendedMetaData="name='ConstraintType_._type' baseType='http://www.eclipse.org/emf/2003/XMLType#integer' enumeration='0 1 2 3 4 5 6 7'"
* @generated
*/
EDataType getConstraintTypeType();
/**
* Returns the meta object for data type '{@link java.lang.String <em>Contact Type</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for data type '<em>Contact Type</em>'.
* @see java.lang.String
* @model instanceClass="java.lang.String"
* extendedMetaData="name='Contact_._type' baseType='http://www.eclipse.org/emf/2003/XMLType#string' maxLength='512'"
* @generated
*/
EDataType getContactType();
/**
* Returns the meta object for data type '{@link java.math.BigInteger <em>Cost Rate Table Type</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for data type '<em>Cost Rate Table Type</em>'.
* @see java.math.BigInteger
* @model instanceClass="java.math.BigInteger"
* extendedMetaData="name='CostRateTable_._type' baseType='http://www.eclipse.org/emf/2003/XMLType#integer' enumeration='0 1 2 3 4'"
* @generated
*/
EDataType getCostRateTableType();
/**
* Returns the meta object for data type '{@link java.math.BigInteger <em>Currency Symbol Position Type</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for data type '<em>Currency Symbol Position Type</em>'.
* @see java.math.BigInteger
* @model instanceClass="java.math.BigInteger"
* extendedMetaData="name='CurrencySymbolPosition_._type' baseType='http://www.eclipse.org/emf/2003/XMLType#integer' enumeration='0 1 2 3'"
* @generated
*/
EDataType getCurrencySymbolPositionType();
/**
* Returns the meta object for data type '{@link java.lang.String <em>Currency Symbol Type</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for data type '<em>Currency Symbol Type</em>'.
* @see java.lang.String
* @model instanceClass="java.lang.String"
* extendedMetaData="name='CurrencySymbol_._type' baseType='http://www.eclipse.org/emf/2003/XMLType#string' maxLength='20'"
* @generated
*/
EDataType getCurrencySymbolType();
/**
* Returns the meta object for data type '{@link java.math.BigInteger <em>Day Type Type</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for data type '<em>Day Type Type</em>'.
* @see java.math.BigInteger
* @model instanceClass="java.math.BigInteger"
* extendedMetaData="name='DayType_._type' baseType='http://www.eclipse.org/emf/2003/XMLType#integer' enumeration='0 1 2 3 4 5 6 7'"
* @generated
*/
EDataType getDayTypeType();
/**
* Returns the meta object for data type '{@link java.math.BigInteger <em>Default Fixed Cost Accrual Type</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for data type '<em>Default Fixed Cost Accrual Type</em>'.
* @see java.math.BigInteger
* @model instanceClass="java.math.BigInteger"
* extendedMetaData="name='DefaultFixedCostAccrual_._type' baseType='http://www.eclipse.org/emf/2003/XMLType#integer' enumeration='1 2 3'"
* @generated
*/
EDataType getDefaultFixedCostAccrualType();
/**
* Returns the meta object for data type '{@link java.math.BigInteger <em>Default Task EV Method Type</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for data type '<em>Default Task EV Method Type</em>'.
* @see java.math.BigInteger
* @model instanceClass="java.math.BigInteger"
* extendedMetaData="name='DefaultTaskEVMethod_._type' baseType='http://www.eclipse.org/emf/2003/XMLType#integer' enumeration='0 1'"
* @generated
*/
EDataType getDefaultTaskEVMethodType();
/**
* Returns the meta object for data type '{@link java.math.BigInteger <em>Default Task Type Type</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for data type '<em>Default Task Type Type</em>'.
* @see java.math.BigInteger
* @model instanceClass="java.math.BigInteger"
* extendedMetaData="name='DefaultTaskType_._type' baseType='http://www.eclipse.org/emf/2003/XMLType#integer' enumeration='0 1 2'"
* @generated
*/
EDataType getDefaultTaskTypeType();
/**
* Returns the meta object for data type '{@link java.math.BigInteger <em>Duration Format Type</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for data type '<em>Duration Format Type</em>'.
* @see java.math.BigInteger
* @model instanceClass="java.math.BigInteger"
* extendedMetaData="name='DurationFormat_._type' baseType='http://www.eclipse.org/emf/2003/XMLType#integer' enumeration='3 4 5 6 7 8 9 10 11 12 19 20 21 35 36 37 38 39 40 41 42 43 44 51 52 53'"
* @generated
*/
EDataType getDurationFormatType();
/**
* Returns the meta object for data type '{@link java.math.BigInteger <em>Duration Format Type1</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for data type '<em>Duration Format Type1</em>'.
* @see java.math.BigInteger
* @model instanceClass="java.math.BigInteger"
* extendedMetaData="name='DurationFormat_._1_._type' baseType='http://www.eclipse.org/emf/2003/XMLType#integer' enumeration='3 4 5 6 7 8 9 10 11 12 19 20 21 35 36 37 38 39 40 41 42 43 44 51 52 53'"
* @generated
*/
EDataType getDurationFormatType1();
/**
* Returns the meta object for data type '{@link java.math.BigInteger <em>Duration Format Type2</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for data type '<em>Duration Format Type2</em>'.
* @see java.math.BigInteger
* @model instanceClass="java.math.BigInteger"
* extendedMetaData="name='DurationFormat_._2_._type' baseType='http://www.eclipse.org/emf/2003/XMLType#integer' enumeration='3 4 5 6 7 8 9 10 11 12 19 20 21 35 36 37 38 39 40 41 42 43 44 51 52 53'"
* @generated
*/
EDataType getDurationFormatType2();
/**
* Returns the meta object for data type '{@link java.math.BigInteger <em>Duration Format Type3</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for data type '<em>Duration Format Type3</em>'.
* @see java.math.BigInteger
* @model instanceClass="java.math.BigInteger"
* extendedMetaData="name='DurationFormat_._3_._type' baseType='http://www.eclipse.org/emf/2003/XMLType#integer' enumeration='3 4 5 6 7 8 9 10 11 12 19 20 21 35 36 37 38 39 40 41 42 43 44 51 52 53'"
* @generated
*/
EDataType getDurationFormatType3();
/**
* Returns the meta object for data type '{@link java.math.BigInteger <em>Duration Format Type4</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for data type '<em>Duration Format Type4</em>'.
* @see java.math.BigInteger
* @model instanceClass="java.math.BigInteger"
* extendedMetaData="name='DurationFormat_._4_._type' baseType='http://www.eclipse.org/emf/2003/XMLType#integer' enumeration='3 4 5 6 7 8 9 10 11 12 19 20 21 35 36 37 38 39 40 41 42 43 44 51 52 53'"
* @generated
*/
EDataType getDurationFormatType4();
/**
* Returns the meta object for data type '{@link java.math.BigInteger <em>Duration Format Type5</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for data type '<em>Duration Format Type5</em>'.
* @see java.math.BigInteger
* @model instanceClass="java.math.BigInteger"
* extendedMetaData="name='DurationFormat_._5_._type' baseType='http://www.eclipse.org/emf/2003/XMLType#integer' enumeration='3 4 5 6 7 8 9 10 11 12 19 20 21 35 36 37 38 39 40 41 42 43 44 51 52 53'"
* @generated
*/
EDataType getDurationFormatType5();
/**
* Returns the meta object for data type '{@link java.math.BigInteger <em>Earned Value Method Type</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for data type '<em>Earned Value Method Type</em>'.
* @see java.math.BigInteger
* @model instanceClass="java.math.BigInteger"
* extendedMetaData="name='EarnedValueMethod_._type' baseType='http://www.eclipse.org/emf/2003/XMLType#integer' enumeration='0 1'"
* @generated
*/
EDataType getEarnedValueMethodType();
/**
* Returns the meta object for data type '{@link java.math.BigInteger <em>Earned Value Method Type1</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for data type '<em>Earned Value Method Type1</em>'.
* @see java.math.BigInteger
* @model instanceClass="java.math.BigInteger"
* extendedMetaData="name='EarnedValueMethod_._1_._type' baseType='http://www.eclipse.org/emf/2003/XMLType#integer' enumeration='0 1'"
* @generated
*/
EDataType getEarnedValueMethodType1();
/**
* Returns the meta object for data type '{@link java.lang.String <em>Email Address Type</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for data type '<em>Email Address Type</em>'.
* @see java.lang.String
* @model instanceClass="java.lang.String"
* extendedMetaData="name='EmailAddress_._type' baseType='http://www.eclipse.org/emf/2003/XMLType#string' maxLength='512'"
* @generated
*/
EDataType getEmailAddressType();
/**
* Returns the meta object for data type '{@link java.lang.String <em>External Task Project Type</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for data type '<em>External Task Project Type</em>'.
* @see java.lang.String
* @model instanceClass="java.lang.String"
* extendedMetaData="name='ExternalTaskProject_._type' baseType='http://www.eclipse.org/emf/2003/XMLType#string' maxLength='512'"
* @generated
*/
EDataType getExternalTaskProjectType();
/**
* Returns the meta object for data type '{@link java.lang.String <em>Fixed Cost Accrual Type</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for data type '<em>Fixed Cost Accrual Type</em>'.
* @see java.lang.String
* @model instanceClass="java.lang.String"
* extendedMetaData="name='FixedCostAccrual_._type' baseType='http://www.eclipse.org/emf/2003/XMLType#string' enumeration='1 2 3'"
* @generated
*/
EDataType getFixedCostAccrualType();
/**
* Returns the meta object for data type '{@link java.math.BigInteger <em>FY Start Date Type</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for data type '<em>FY Start Date Type</em>'.
* @see java.math.BigInteger
* @model instanceClass="java.math.BigInteger"
* extendedMetaData="name='FYStartDate_._type' baseType='http://www.eclipse.org/emf/2003/XMLType#integer' enumeration='1 2 3 4 5 6 7 8 9 10 11 12'"
* @generated
*/
EDataType getFYStartDateType();
/**
* Returns the meta object for data type '{@link java.lang.String <em>Group Type</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for data type '<em>Group Type</em>'.
* @see java.lang.String
* @model instanceClass="java.lang.String"
* extendedMetaData="name='Group_._type' baseType='http://www.eclipse.org/emf/2003/XMLType#string' maxLength='512'"
* @generated
*/
EDataType getGroupType();
/**
* Returns the meta object for data type '{@link java.lang.String <em>Hyperlink Address Type</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for data type '<em>Hyperlink Address Type</em>'.
* @see java.lang.String
* @model instanceClass="java.lang.String"
* extendedMetaData="name='HyperlinkAddress_._type' baseType='http://www.eclipse.org/emf/2003/XMLType#string' maxLength='512'"
* @generated
*/
EDataType getHyperlinkAddressType();
/**
* Returns the meta object for data type '{@link java.lang.String <em>Hyperlink Address Type1</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for data type '<em>Hyperlink Address Type1</em>'.
* @see java.lang.String
* @model instanceClass="java.lang.String"
* extendedMetaData="name='HyperlinkAddress_._1_._type' baseType='http://www.eclipse.org/emf/2003/XMLType#string' maxLength='512'"
* @generated
*/
EDataType getHyperlinkAddressType1();
/**
* Returns the meta object for data type '{@link java.lang.String <em>Hyperlink Address Type2</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for data type '<em>Hyperlink Address Type2</em>'.
* @see java.lang.String
* @model instanceClass="java.lang.String"
* extendedMetaData="name='HyperlinkAddress_._2_._type' baseType='http://www.eclipse.org/emf/2003/XMLType#string' maxLength='512'"
* @generated
*/
EDataType getHyperlinkAddressType2();
/**
* Returns the meta object for data type '{@link java.lang.String <em>Hyperlink Sub Address Type</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for data type '<em>Hyperlink Sub Address Type</em>'.
* @see java.lang.String
* @model instanceClass="java.lang.String"
* extendedMetaData="name='HyperlinkSubAddress_._type' baseType='http://www.eclipse.org/emf/2003/XMLType#string' maxLength='512'"
* @generated
*/
EDataType getHyperlinkSubAddressType();
/**
* Returns the meta object for data type '{@link java.lang.String <em>Hyperlink Sub Address Type1</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for data type '<em>Hyperlink Sub Address Type1</em>'.
* @see java.lang.String
* @model instanceClass="java.lang.String"
* extendedMetaData="name='HyperlinkSubAddress_._1_._type' baseType='http://www.eclipse.org/emf/2003/XMLType#string' maxLength='512'"
* @generated
*/
EDataType getHyperlinkSubAddressType1();
/**
* Returns the meta object for data type '{@link java.lang.String <em>Hyperlink Sub Address Type2</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for data type '<em>Hyperlink Sub Address Type2</em>'.
* @see java.lang.String
* @model instanceClass="java.lang.String"
* extendedMetaData="name='HyperlinkSubAddress_._2_._type' baseType='http://www.eclipse.org/emf/2003/XMLType#string' maxLength='512'"
* @generated
*/
EDataType getHyperlinkSubAddressType2();
/**
* Returns the meta object for data type '{@link java.lang.String <em>Hyperlink Type</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for data type '<em>Hyperlink Type</em>'.
* @see java.lang.String
* @model instanceClass="java.lang.String"
* extendedMetaData="name='Hyperlink_._type' baseType='http://www.eclipse.org/emf/2003/XMLType#string' maxLength='512'"
* @generated
*/
EDataType getHyperlinkType();
/**
* Returns the meta object for data type '{@link java.lang.String <em>Hyperlink Type1</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for data type '<em>Hyperlink Type1</em>'.
* @see java.lang.String
* @model instanceClass="java.lang.String"
* extendedMetaData="name='Hyperlink_._1_._type' baseType='http://www.eclipse.org/emf/2003/XMLType#string' maxLength='512'"
* @generated
*/
EDataType getHyperlinkType1();
/**
* Returns the meta object for data type '{@link java.lang.String <em>Hyperlink Type2</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for data type '<em>Hyperlink Type2</em>'.
* @see java.lang.String
* @model instanceClass="java.lang.String"
* extendedMetaData="name='Hyperlink_._2_._type' baseType='http://www.eclipse.org/emf/2003/XMLType#string' maxLength='512'"
* @generated
*/
EDataType getHyperlinkType2();
/**
* Returns the meta object for data type '{@link java.lang.String <em>Initials Type</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for data type '<em>Initials Type</em>'.
* @see java.lang.String
* @model instanceClass="java.lang.String"
* extendedMetaData="name='Initials_._type' baseType='http://www.eclipse.org/emf/2003/XMLType#string' maxLength='512'"
* @generated
*/
EDataType getInitialsType();
/**
* Returns the meta object for data type '{@link java.math.BigInteger <em>Lag Format Type</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for data type '<em>Lag Format Type</em>'.
* @see java.math.BigInteger
* @model instanceClass="java.math.BigInteger"
* extendedMetaData="name='LagFormat_._type' baseType='http://www.eclipse.org/emf/2003/XMLType#integer' enumeration='3 4 5 6 7 8 9 10 11 12 19 20 35 36 37 38 39 40 41 42 43 44 51 52 53'"
* @generated
*/
EDataType getLagFormatType();
/**
* Returns the meta object for data type '{@link java.math.BigInteger <em>Leveling Delay Format Type</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for data type '<em>Leveling Delay Format Type</em>'.
* @see java.math.BigInteger
* @model instanceClass="java.math.BigInteger"
* extendedMetaData="name='LevelingDelayFormat_._type' baseType='http://www.eclipse.org/emf/2003/XMLType#integer' enumeration='3 4 5 6 7 8 9 10 11 12 19 20 21 35 36 37 38 39 40 41 42 43 44 51 52 53'"
* @generated
*/
EDataType getLevelingDelayFormatType();
/**
* Returns the meta object for data type '{@link java.math.BigInteger <em>Leveling Delay Format Type1</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for data type '<em>Leveling Delay Format Type1</em>'.
* @see java.math.BigInteger
* @model instanceClass="java.math.BigInteger"
* extendedMetaData="name='LevelingDelayFormat_._1_._type' baseType='http://www.eclipse.org/emf/2003/XMLType#integer' enumeration='3 4 5 6 7 8 9 10 11 12 19 20 21 35 36 37 38 39 40 41 42 43 44 51 52 53'"
* @generated
*/
EDataType getLevelingDelayFormatType1();
/**
* Returns the meta object for data type '{@link java.lang.String <em>Manager Type</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for data type '<em>Manager Type</em>'.
* @see java.lang.String
* @model instanceClass="java.lang.String"
* extendedMetaData="name='Manager_._type' baseType='http://www.eclipse.org/emf/2003/XMLType#string' maxLength='512'"
* @generated
*/
EDataType getManagerType();
/**
* Returns the meta object for data type '{@link java.lang.String <em>Material Label Type</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for data type '<em>Material Label Type</em>'.
* @see java.lang.String
* @model instanceClass="java.lang.String"
* extendedMetaData="name='MaterialLabel_._type' baseType='http://www.eclipse.org/emf/2003/XMLType#string' maxLength='512'"
* @generated
*/
EDataType getMaterialLabelType();
/**
* Returns the meta object for data type '{@link java.lang.String <em>Name Type</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for data type '<em>Name Type</em>'.
* @see java.lang.String
* @model instanceClass="java.lang.String"
* extendedMetaData="name='Name_._type' baseType='http://www.eclipse.org/emf/2003/XMLType#string' maxLength='512'"
* @generated
*/
EDataType getNameType();
/**
* Returns the meta object for data type '{@link java.lang.String <em>Name Type1</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for data type '<em>Name Type1</em>'.
* @see java.lang.String
* @model instanceClass="java.lang.String"
* extendedMetaData="name='Name_._1_._type' baseType='http://www.eclipse.org/emf/2003/XMLType#string' maxLength='512'"
* @generated
*/
EDataType getNameType1();
/**
* Returns the meta object for data type '{@link java.lang.String <em>Name Type2</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for data type '<em>Name Type2</em>'.
* @see java.lang.String
* @model instanceClass="java.lang.String"
* extendedMetaData="name='Name_._2_._type' baseType='http://www.eclipse.org/emf/2003/XMLType#string' maxLength='512'"
* @generated
*/
EDataType getNameType2();
/**
* Returns the meta object for data type '{@link java.lang.String <em>Name Type3</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for data type '<em>Name Type3</em>'.
* @see java.lang.String
* @model instanceClass="java.lang.String"
* extendedMetaData="name='Name_._3_._type' baseType='http://www.eclipse.org/emf/2003/XMLType#string' maxLength='255'"
* @generated
*/
EDataType getNameType3();
/**
* Returns the meta object for data type '{@link java.math.BigInteger <em>New Task Start Date Type</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for data type '<em>New Task Start Date Type</em>'.
* @see java.math.BigInteger
* @model instanceClass="java.math.BigInteger"
* extendedMetaData="name='NewTaskStartDate_._type' baseType='http://www.eclipse.org/emf/2003/XMLType#integer' enumeration='0 1'"
* @generated
*/
EDataType getNewTaskStartDateType();
/**
* Returns the meta object for data type '{@link java.lang.String <em>NT Account Type</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for data type '<em>NT Account Type</em>'.
* @see java.lang.String
* @model instanceClass="java.lang.String"
* extendedMetaData="name='NTAccount_._type' baseType='http://www.eclipse.org/emf/2003/XMLType#string' maxLength='512'"
* @generated
*/
EDataType getNTAccountType();
/**
* Returns the meta object for data type '{@link java.lang.String <em>Outline Number Type</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for data type '<em>Outline Number Type</em>'.
* @see java.lang.String
* @model instanceClass="java.lang.String"
* extendedMetaData="name='OutlineNumber_._type' baseType='http://www.eclipse.org/emf/2003/XMLType#string' maxLength='512'"
* @generated
*/
EDataType getOutlineNumberType();
/**
* Returns the meta object for data type '{@link java.math.BigInteger <em>Overtime Rate Format Type</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for data type '<em>Overtime Rate Format Type</em>'.
* @see java.math.BigInteger
* @model instanceClass="java.math.BigInteger"
* extendedMetaData="name='OvertimeRateFormat_._type' baseType='http://www.eclipse.org/emf/2003/XMLType#integer' enumeration='1 2 3 4 5 7'"
* @generated
*/
EDataType getOvertimeRateFormatType();
/**
* Returns the meta object for data type '{@link java.math.BigInteger <em>Overtime Rate Format Type1</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for data type '<em>Overtime Rate Format Type1</em>'.
* @see java.math.BigInteger
* @model instanceClass="java.math.BigInteger"
* extendedMetaData="name='OvertimeRateFormat_._1_._type' baseType='http://www.eclipse.org/emf/2003/XMLType#integer' enumeration='1 2 3 4 5 7'"
* @generated
*/
EDataType getOvertimeRateFormatType1();
/**
* Returns the meta object for data type '{@link java.lang.String <em>Phonetic Alias Type</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for data type '<em>Phonetic Alias Type</em>'.
* @see java.lang.String
* @model instanceClass="java.lang.String"
* extendedMetaData="name='PhoneticAlias_._type' baseType='http://www.eclipse.org/emf/2003/XMLType#string' maxLength='50'"
* @generated
*/
EDataType getPhoneticAliasType();
/**
* Returns the meta object for data type '{@link java.lang.String <em>Phonetics Type</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for data type '<em>Phonetics Type</em>'.
* @see java.lang.String
* @model instanceClass="java.lang.String"
* extendedMetaData="name='Phonetics_._type' baseType='http://www.eclipse.org/emf/2003/XMLType#string' maxLength='512'"
* @generated
*/
EDataType getPhoneticsType();
/**
* Returns the meta object for data type '{@link java.lang.String <em>Prefix Type</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for data type '<em>Prefix Type</em>'.
* @see java.lang.String
* @model instanceClass="java.lang.String"
* extendedMetaData="name='Prefix_._type' baseType='http://www.eclipse.org/emf/2003/XMLType#string' maxLength='50'"
* @generated
*/
EDataType getPrefixType();
/**
* Returns the meta object for data type '{@link java.math.BigInteger <em>Rate Table Type</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for data type '<em>Rate Table Type</em>'.
* @see java.math.BigInteger
* @model instanceClass="java.math.BigInteger"
* extendedMetaData="name='RateTable_._type' baseType='http://www.eclipse.org/emf/2003/XMLType#integer' enumeration='0 1 2 3 4'"
* @generated
*/
EDataType getRateTableType();
/**
* Returns the meta object for data type '{@link java.math.BigInteger <em>Rollup Type Type</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for data type '<em>Rollup Type Type</em>'.
* @see java.math.BigInteger
* @model instanceClass="java.math.BigInteger"
* extendedMetaData="name='RollupType_._type' baseType='http://www.eclipse.org/emf/2003/XMLType#integer' enumeration='0 1 2 3 4 5 6 7'"
* @generated
*/
EDataType getRollupTypeType();
/**
* Returns the meta object for data type '{@link java.math.BigInteger <em>Standard Rate Format Type</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for data type '<em>Standard Rate Format Type</em>'.
* @see java.math.BigInteger
* @model instanceClass="java.math.BigInteger"
* extendedMetaData="name='StandardRateFormat_._type' baseType='http://www.eclipse.org/emf/2003/XMLType#integer' enumeration='1 2 3 4 5 7'"
* @generated
*/
EDataType getStandardRateFormatType();
/**
* Returns the meta object for data type '{@link java.math.BigInteger <em>Standard Rate Format Type1</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for data type '<em>Standard Rate Format Type1</em>'.
* @see java.math.BigInteger
* @model instanceClass="java.math.BigInteger"
* extendedMetaData="name='StandardRateFormat_._1_._type' baseType='http://www.eclipse.org/emf/2003/XMLType#integer' enumeration='1 2 3 4 5 7 8'"
* @generated
*/
EDataType getStandardRateFormatType1();
/**
* Returns the meta object for data type '{@link java.lang.String <em>Subject Type</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for data type '<em>Subject Type</em>'.
* @see java.lang.String
* @model instanceClass="java.lang.String"
* extendedMetaData="name='Subject_._type' baseType='http://www.eclipse.org/emf/2003/XMLType#string' maxLength='512'"
* @generated
*/
EDataType getSubjectType();
/**
* Returns the meta object for data type '{@link java.lang.String <em>Subproject Name Type</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for data type '<em>Subproject Name Type</em>'.
* @see java.lang.String
* @model instanceClass="java.lang.String"
* extendedMetaData="name='SubprojectName_._type' baseType='http://www.eclipse.org/emf/2003/XMLType#string' maxLength='512'"
* @generated
*/
EDataType getSubprojectNameType();
/**
* Returns the meta object for data type '{@link java.lang.String <em>Title Type</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for data type '<em>Title Type</em>'.
* @see java.lang.String
* @model instanceClass="java.lang.String"
* extendedMetaData="name='Title_._type' baseType='http://www.eclipse.org/emf/2003/XMLType#string' maxLength='512'"
* @generated
*/
EDataType getTitleType();
/**
* Returns the meta object for data type '{@link java.math.BigInteger <em>Type Type</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for data type '<em>Type Type</em>'.
* @see java.math.BigInteger
* @model instanceClass="java.math.BigInteger"
* extendedMetaData="name='Type_._type' baseType='http://www.eclipse.org/emf/2003/XMLType#integer' enumeration='0 1 2'"
* @generated
*/
EDataType getTypeType();
/**
* Returns the meta object for data type '{@link java.math.BigInteger <em>Type Type1</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for data type '<em>Type Type1</em>'.
* @see java.math.BigInteger
* @model instanceClass="java.math.BigInteger"
* extendedMetaData="name='Type_._1_._type' baseType='http://www.eclipse.org/emf/2003/XMLType#integer' enumeration='0 1 2 3'"
* @generated
*/
EDataType getTypeType1();
/**
* Returns the meta object for data type '{@link java.math.BigInteger <em>Type Type2</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for data type '<em>Type Type2</em>'.
* @see java.math.BigInteger
* @model instanceClass="java.math.BigInteger"
* extendedMetaData="name='Type_._2_._type' baseType='http://www.eclipse.org/emf/2003/XMLType#integer' enumeration='0 1 2 3'"
* @generated
*/
EDataType getTypeType2();
/**
* Returns the meta object for data type '{@link java.math.BigInteger <em>Type Type3</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for data type '<em>Type Type3</em>'.
* @see java.math.BigInteger
* @model instanceClass="java.math.BigInteger"
* extendedMetaData="name='Type_._3_._type' baseType='http://www.eclipse.org/emf/2003/XMLType#integer' enumeration='1 2 3 4 5 6 7 8 9 10 11 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76'"
* @generated
*/
EDataType getTypeType3();
/**
* Returns the meta object for data type '{@link java.math.BigInteger <em>Type Type4</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for data type '<em>Type Type4</em>'.
* @see java.math.BigInteger
* @model instanceClass="java.math.BigInteger"
* extendedMetaData="name='Type_._4_._type' baseType='http://www.eclipse.org/emf/2003/XMLType#integer' enumeration='0 1'"
* @generated
*/
EDataType getTypeType4();
/**
* Returns the meta object for data type '{@link java.math.BigInteger <em>Type Type5</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for data type '<em>Type Type5</em>'.
* @see java.math.BigInteger
* @model instanceClass="java.math.BigInteger"
* extendedMetaData="name='Type_._5_._type' baseType='http://www.eclipse.org/emf/2003/XMLType#integer' enumeration='0 1 2 3'"
* @generated
*/
EDataType getTypeType5();
/**
* Returns the meta object for data type '{@link java.lang.String <em>UID Type</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for data type '<em>UID Type</em>'.
* @see java.lang.String
* @model instanceClass="java.lang.String"
* extendedMetaData="name='UID_._type' baseType='http://www.eclipse.org/emf/2003/XMLType#string' maxLength='16'"
* @generated
*/
EDataType getUIDType();
/**
* Returns the meta object for data type '{@link java.math.BigInteger <em>Unit Type</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for data type '<em>Unit Type</em>'.
* @see java.math.BigInteger
* @model instanceClass="java.math.BigInteger"
* extendedMetaData="name='Unit_._type' baseType='http://www.eclipse.org/emf/2003/XMLType#integer' enumeration='0 1 2 3 5 8'"
* @generated
*/
EDataType getUnitType();
/**
* Returns the meta object for data type '{@link java.math.BigInteger <em>Valuelist Sort Order Type</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for data type '<em>Valuelist Sort Order Type</em>'.
* @see java.math.BigInteger
* @model instanceClass="java.math.BigInteger"
* extendedMetaData="name='ValuelistSortOrder_._type' baseType='http://www.eclipse.org/emf/2003/XMLType#integer' enumeration='0 1'"
* @generated
*/
EDataType getValuelistSortOrderType();
/**
* Returns the meta object for data type '{@link java.math.BigInteger <em>Week Start Day Type</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for data type '<em>Week Start Day Type</em>'.
* @see java.math.BigInteger
* @model instanceClass="java.math.BigInteger"
* extendedMetaData="name='WeekStartDay_._type' baseType='http://www.eclipse.org/emf/2003/XMLType#integer' enumeration='0 1 2 3 4 5 6'"
* @generated
*/
EDataType getWeekStartDayType();
/**
* Returns the meta object for data type '{@link java.math.BigInteger <em>Work Contour Type</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for data type '<em>Work Contour Type</em>'.
* @see java.math.BigInteger
* @model instanceClass="java.math.BigInteger"
* extendedMetaData="name='WorkContour_._type' baseType='http://www.eclipse.org/emf/2003/XMLType#integer' enumeration='0 1 2 3 4 5 6 7 8'"
* @generated
*/
EDataType getWorkContourType();
/**
* Returns the meta object for data type '{@link java.math.BigInteger <em>Work Format Type</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for data type '<em>Work Format Type</em>'.
* @see java.math.BigInteger
* @model instanceClass="java.math.BigInteger"
* extendedMetaData="name='WorkFormat_._type' baseType='http://www.eclipse.org/emf/2003/XMLType#integer' enumeration='1 2 3 4 5'"
* @generated
*/
EDataType getWorkFormatType();
/**
* Returns the meta object for data type '{@link java.math.BigInteger <em>Work Group Type</em>}'.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the meta object for data type '<em>Work Group Type</em>'.
* @see java.math.BigInteger
* @model instanceClass="java.math.BigInteger"
* extendedMetaData="name='WorkGroup_._type' baseType='http://www.eclipse.org/emf/2003/XMLType#integer' enumeration='0 1 2 3'"
* @generated
*/
EDataType getWorkGroupType();
/**
* Returns the factory that creates the instances of the model.
* <!-- begin-user-doc -->
* <!-- end-user-doc -->
* @return the factory that creates the instances of the model.
* @generated
*/
MsprojectFactory getMsprojectFactory();
} //MsprojectPackage